Google Bayhill Solar PV and Microgrid
1450 Bayhill Drive, San Bruno, CA 94066Plant Summary Information
Google Bayhill Solar PV and Microgrid is ranked #791 out of 849 solar farms in California in terms of total annual net electricity generation.
Google Bayhill Solar PV and Microgrid generated 225.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Google Bayhill Solar PV and Microgrid |
|---|---|
| Utility Name | Google, Inc. |
| Location | San Mateo County, CA |
| Initial Operation Date | April 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 1.0 GWh |
| Annual Consumption | 3.8 k MMBtu |
| Ranked #11,427 out of 12,539 Power Plants Nationwide | |
| Ranked #6,073 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,525 out of 1,600 California Power Plants | |
| Ranked #791 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Google Bayhill Solar PV and Microgrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Google Bayhill Solar PV and Microgrid.
Monthly Net Generation for Google Bayhill Solar PV and Microgrid
Google Bayhill Solar PV and Microgrid Details
| Summary Information | |
|---|---|
| Plant Name | Google Bayhill Solar PV and Microgrid (68816) |
| Plant Address | 1450 Bayhill Drive, San Bruno, CA 94066 |
| Utility | Google, Inc. (64846) |
| Latitude, Longitude | 37.62692, -122.42829 |
| Generation Dates on File | Apr 2024 to Dec 2024 |
| Initial Operation Date | April 2024 |
| Annual Generation | 1.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | Yes |
Generator GBHBM Details Operating April 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 2.6 MW |
| Summer Capacity | 2.6 MW |
| Winter Capacity | 2.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 5.3 |
|---|---|
| Maximum Charge Rate | 2.5 MW |
| Maximum Discharge Rate | 2.2 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.8 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| System Peak Shaving | Yes |
| Backup Power | Yes |
| Excess Wind And Solar Generation | P |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 68816 |
| Direct Support Gen Id | GBHPV |
| Support T D Asset | No |
Generator GBHPV Details Operating July 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 0.9 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 160 |
| Tilt Angle | 20 |
| DC Net Capacity | 1.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.3 MW |
| Virtual Net Metering Agreement | No |
Google Bayhill Solar PV and Microgrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6063 | Sutter Home Winery TCC | Paso Robles, CA | 1.1 GWh |
| #6064 | Fareway Customer Hosted 1 MW Solar | Boone, IA | 1.1 GWh |
| #6065 | UMass Boston | Dorchester, MA | 1.1 GWh |
| #6066 | SunEdison LV Sutton Plant Site | Wilmington, NC | 1.1 GWh |
| #6068 | MLH 3 | Gainesville, FL | 1.1 GWh |
| #6069 | Martins Creek Solar NC, LLC | Murphy, NC | 1.1 GWh |
| #6070 | Roger Road WWTP | Tucson, AZ | 1.1 GWh |
| #6071 | Nordhoff Place | Chatsworth, CA | 1.1 GWh |
| #6072 | CVEC Round 4 Brewster Captn Golf Course | Brewster, MA | 1.1 GWh |
| #6074 | IGS LAS1 | Henderson, NV | 1.1 GWh |
| #6075 | Onondaga County - Metro Water Board | Clay, NY | 1.1 GWh |
| #6076 | Maclay Solar Project | Sylmar, CA | 1.1 GWh |
| #6077 | Catskill Solar | Hudson, NY | 1.1 GWh |
| #6078 | CAMILLUS A (CSG) | Camillus, NY | 1.1 GWh |
| #6079 | AZ State University - Tempe Campus Solar | Tempe, AZ | 1.1 GWh |
| #6080 | MCCo Solar Generating Facility | Cleveland, OH | 1.1 GWh |
| #6081 | North County | Hauppauge, NY | 1.1 GWh |
| #6082 | Colton Solar Two, LLC | Colton, CA | 1.1 GWh |
| #6083 | Manlius East | Manlius, NY | 1.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Google Bayhill Solar PV and Microgrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alameda | Alameda, CA | 3.1 GWh | 13.5 mi |
| Ameresco Ox Mountain | Half Moon Bay, CA | 81.3 GWh | 8.9 mi |
| AT&T - Redwood City | Redwood City, CA | 5.6 GWh | 16.1 mi |
| City of Hayward WWTP | Hayward, CA | 11.3 GWh | 15.8 mi |
| Dynegy Oakland Power Plant | Oakland, CA | 2.7 GWh | 14.2 mi |
| Franklin Templeton San Mateo | San Mateo, CA | 9.3 GWh | 9.4 mi |
| Gilead Foster City Solar Project | Foster City, CA | 1.9 GWh | 9.2 mi |
| KSR028 Merced Fuel Cell | San Leandro, CA | 15.7 GWh | 15.4 mi |
| One Market Plaza | San Francisco, CA | 177.0 MWh | 11.6 mi |
| Parnassus Central Utility Plant | San Francisco, CA | 67.6 GWh | 9.5 mi |
| Pixar - Emeryville | Emeryville, CA | 7.5 GWh | 16.3 mi |
| Power Generation Station (PGS) 2 | Oakland, CA | 16.5 GWh | 15.5 mi |
| Russell City Energy Center | Hayward, CA | 1.5 TWh | 16.1 mi |
| SF Southeast Cogen Plant | San Francisco, CA | 3.9 GWh | 8 mi |
| Shelter Creek Condominiums Solar | San Bruno, CA | 3.5 GWh | 0.5 mi |
| Silicon Valley Clean Water | Redwood City, CA | 7.0 GWh | 12.3 mi |
| Sunset Reservoir North Basin | San Francisco, CA | 6.5 GWh | 9.1 mi |
| Transamerica Pyramid | San Francisco, CA | 525.0 MWh | 11.7 mi |
| Univ of San Francisco Cogen | San Francisco, CA | 5.2 GWh | 10.4 mi |
| WWTP Power Generation Station | Oakland, CA | 28.4 GWh | 15.5 mi |