Desert Quartzite
18th Avenue and Mesa Dr, Blythe, CA 92225Plant Summary Information
Desert Quartzite is ranked #21 out of 7,027 solar farms nationwide in terms of total annual net electricity generation.
Desert Quartzite generated 274.1 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Desert Quartzite |
|---|---|
| Utility Name | Desert Quartzite LLC |
| Location | Riverside County, CA |
| Initial Operation Date | December 2024 |
| Last Update | Jun 2026 |
| Annual Generation | 852.5 GWh |
| Annual Consumption | 3.3 M MMBtu |
| Ranked #847 out of 13,094 Power Plants Nationwide | |
| Ranked #21 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #38 out of 1,607 California Power Plants | |
| Ranked #3 out of 886 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
First Solar Project Development (2014 to 2019) Desert Quartzite LLC (2020 to 2025) |
Map of Desert Quartzite
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Desert Quartzite.
Monthly Net Generation for Desert Quartzite
Monthly Plant Fuel Consumption for Desert Quartzite
Desert Quartzite Details
| Summary Information | |
|---|---|
| Plant Name | Desert Quartzite (59871) |
| Plant Address | 18th Avenue and Mesa Dr, Blythe, CA 92225 |
| Utility | Desert Quartzite LLC (59656) |
| Latitude, Longitude | 33.565, -114.753 |
| Generation Dates on File | Dec 2024 to Jun 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 852.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator GEN01 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 300 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 300 MW |
| Winter Capacity | 300 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| DC Net Capacity | 374.9 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator GEN02 Details Operating December 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 150 |
|---|---|
| Maximum Charge Rate | 150 MW |
| Maximum Discharge Rate | 150 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 49.3 |
| Storage Enclosure Type | CS |
| Co Located Renewable Firming | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 59871 |
| Direct Support Gen Id | GEN01 |
| Support T D Asset | No |
Desert Quartzite Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #11 | Double Back Diamond | Virden, IL | 1.0 TWh |
| #12 | 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh |
| #13 | Mockingbird Solar Center | Brookston, TX | 985.8 GWh |
| #14 | Topaz Solar Farm | Santa Margarita, CA | 969.2 GWh |
| #15 | Danish Fields Solar, LLC | El Campo, TX | 922.9 GWh |
| #16 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 912.1 GWh |
| #17 | Harquahala 2 | Tonopah, AZ | 845.1 GWh |
| #18 | Solar Star 1 | Rosamond, CA | 888.9 GWh |
| #19 | Old 300 Solar Center, LLC | Needville, TX | 882.5 GWh |
| #20 | Box Canyon (AZ) | Florence, AZ | 869.9 GWh |
| #22 | Solana Generating Station | Gila Bend, AZ | 850.4 GWh |
| #23 | Daggett 3 | Daggett, CA | 834.1 GWh |
| #24 | Greasewood II LLC | Girvin, TX | 840.3 GWh |
| #25 | Eleven Mile Solar Center | Coolidge, AZ | 777.5 GWh |
| #26 | Waco Solar | Mt Calm, TX | 802.6 GWh |
| #27 | Dunns Bridge II Solar | San Pierre, IN | 777.8 GWh |
| #28 | McFarland B Solar and Storage | Dateland, AZ | 774.5 GWh |
| #29 | Red Tailed Hawk Solar LLC | El Campo, TX | 784.8 GWh |
| #30 | Sun Streams 4 | Tonopah, AZ | 739.5 GWh |
| #31 | Solar Star 2 | Rosamond, CA | 761.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Desert Quartzite.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Energy Center II | Blythe, CA | 640.6 GWh | 8.8 mi |
| Arlington Energy Center III | Blythe, CA | 333.9 GWh | 8.8 mi |
| Blythe Energy Inc | Blythe, CA | 317.7 GWh | 5.2 mi |
| Blythe Mesa Solar II | Blythe, CA | 574.9 GWh | 6.7 mi |
| Blythe Solar 110, LLC | Blythe, CA | 283.6 GWh | 8 mi |
| Blythe Solar II, LLC | Blythe, CA | 328.7 GWh | 8.1 mi |
| Blythe Solar III, LLC Hybrid | Blythe, CA | 346.3 GWh | 6.3 mi |
| Blythe Solar IV, LLC | Blythe, CA | 339.1 GWh | 8.1 mi |
| Chuckawalla Solar | Blythe, CA | 7.3 GWh | 9.5 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 502.0 MWh | 8.7 mi |
| Genesis Solar Energy Project | Blythe, CA | 600.0 GWh | 15.7 mi |
| Ironwood Solar LLC | Blythe, CA | 7.3 GWh | 9.5 mi |
| McCoy Solar Energy Project Hybrid | Blythe, CA | 638.7 GWh | 9 mi |
| Palo Verde College | Blythe, CA | 2.0 GWh | 8.9 mi |
| Solar Blythe 2 | Blythe, CA | 40.7 GWh | 4.9 mi |
| Solar Blythe LLC | Blythe, CA | 38.8 GWh | 1.9 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 1.4 GWh | 9.5 mi |
| Venable Solar 1 | Blythe, CA | 3.7 GWh | 10.7 mi |
| Venable Solar 2 | Blythe, CA | 3.4 GWh | 10.7 mi |
| Victory Pass | Desert Center, CA | 568.9 GWh | 33.7 mi |