Bishop Ranch - BR 8-O
5000 Executive Pkwy, San Ramon, CA 94583Plant Summary Information
Bishop Ranch - BR 8-O is ranked #815 out of 914 solar farms in California in terms of total annual net electricity generation.
Bishop Ranch - BR 8-O generated 233.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Bishop Ranch - BR 8-O |
|---|---|
| Utility Name | Executive Parkway BR8-O Solar Project 2020 LLC |
| Location | Contra Costa County, CA |
| Initial Operation Date | March 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 1.4 GWh |
| Annual Consumption | 4.8 k MMBtu |
| Ranked #11,845 out of 13,269 Power Plants Nationwide | |
| Ranked #6,600 out of 7,183 Solar Power Plants Nationwide | |
| Ranked #1,508 out of 1,637 California Power Plants | |
| Ranked #815 out of 914 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Bishop Ranch - BR 8-O
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bishop Ranch - BR 8-O.
Monthly Net Generation for Bishop Ranch - BR 8-O
Monthly Plant Fuel Consumption for Bishop Ranch - BR 8-O
Bishop Ranch - BR 8-O Details
| Summary Information | |
|---|---|
| Plant Name | Bishop Ranch - BR 8-O (68522) |
| Plant Address | 5000 Executive Pkwy, San Ramon, CA 94583 |
| Utility | Executive Parkway BR8-O Solar Project 2020 LLC (66893) |
| Latitude, Longitude | 37.76901, -121.9668 |
| Generation Dates on File | Mar 2025 to Dec 2025 |
| Initial Operation Date | March 2025 |
| Annual Generation | 1.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 22-865-000, 22-865-001, 22-865-002 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | Yes |
Generator 4975B Details Operating March 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 1.1 |
|---|---|
| Maximum Charge Rate | 0.5 MW |
| Maximum Discharge Rate | 0.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.1 |
| Storage Enclosure Type | CS |
| System Peak Shaving | Yes |
| Load Management | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 68522 |
| Direct Support Gen Id | 4975C |
| Support T D Asset | No |
Generator 4975C Details Operating March 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 153 |
| Tilt Angle | 5 |
| DC Net Capacity | 1.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.1 MW |
| Virtual Net Metering Agreement | No |
Bishop Ranch - BR 8-O Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6590 | Nolan | Great Barrington, MA | 1.4 GWh |
| #6591 | ISH Solar Hospital SDMC | San Diego, CA | 1.4 GWh |
| #6592 | TJA-NY-Chestnut Ridge Rd Moravia, LLC | Moravia, NY | 1.4 GWh |
| #6593 | Heller 400M | Edison Township, NJ | 1.4 GWh |
| #6594 | Fort Bragg - Camp Mackall PV BESS System | Hoffman, NC | 1.4 GWh |
| #6595 | Jordache Enterprises Solar | South Plainfield, NJ | 1.4 GWh |
| #6596 | Legoland CA Phase I | Carlsbad, CA | 1.4 GWh |
| #6597 | Nunn | Apple Valley, CA | 1.4 GWh |
| #6598 | DG Tufts Science LLC CSG | North Grafton, MA | 1.4 GWh |
| #6599 | Greenville | Greenville, GA | 1.4 GWh |
| #6601 | Kent County-Kennedyville | Kennedyville, MD | 1.4 GWh |
| #6602 | Milhurst Solar | Manalapan, NJ | 1.4 GWh |
| #6603 | Denver Int Airport | Denver, CO | 1.4 GWh |
| #6604 | GSPP Onyx New Brunswick LLC | New Brunswick, NJ | 1.4 GWh |
| #6605 | Dodge County Solar Hybrid | Scribner, NE | 1.4 GWh |
| #6606 | TCI France | New Orleans, LA | 1.4 GWh |
| #6607 | Belchertown | Belchertown, MA | 1.4 GWh |
| #6608 | SunEdison Ironwood State Prison | Blythe, CA | 1.4 GWh |
| #6609 | ISH Solar Central, LLC | Bayville, NJ | 1.4 GWh |
| #6610 | Millville City Sewer Auth WTP | Millville, NJ | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bishop Ranch - BR 8-O.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Vasco Road | Livermore, CA | 32.7 GWh | 13 mi |
| AT&T - Hayward | Hayward, CA | 7.6 GWh | 10.4 mi |
| Bishop Ranch - BR 1-Y | San Ramon, CA | 1.7 GWh | 0.7 mi |
| Bishop Ranch - BR 15-AA | San Ramon, CA | 766.0 MWh | 0.5 mi |
| Bishop Ranch - BR 15-CC | San Ramon, CA | 950.0 MWh | 0.5 mi |
| Bishop Ranch - BR 15-DD | San Ramon, CA | 62.0 MWh | 0.5 mi |
| Bishop Ranch - BR 2600 | San Ramon, CA | 764.0 MWh | 0.3 mi |
| Bishop Ranch - BR 8-P | San Ramon, CA | 1.3 GWh | 0.1 mi |
| Bishop Ranch - BR 8-Q | San Ramon, CA | 871.0 MWh | 0.1 mi |
| Bishop Ranch BR 1-X | San Ramon, CA | 1.5 GWh | 0.9 mi |
| City of Hayward WWTP | Hayward, CA | 10.5 GWh | 13.3 mi |
| Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.9 GWh | 6.2 mi |
| KSR028 Merced Fuel Cell | San Leandro, CA | 16.4 GWh | 11.6 mi |
| Las Positas College | Livermore, CA | 1.7 GWh | 10 mi |
| Life Technologies - Pleasanton | Pleasanton, CA | 8.3 GWh | 9.8 mi |
| Preferred Freezer San Leandro | San Leandro, CA | 3.0 GWh | 10.8 mi |
| Russell City Energy Center | Hayward, CA | 1.6 TWh | 13 mi |
| Santa Rita Jail Fuel Cell | Dublin, CA | 8.1 GWh | 5.6 mi |
| Santa Rita Jail Hybrid | Dublin, CA | 10.4 GWh | 5.6 mi |
| Thermo Fisher Pleasanton | Pleasanton, CA | 1.5 GWh | 9.7 mi |