Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| 20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 3.1 GWh | Jun 2022 | Dec 2024 | Solar |
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.1 GWh | Jul 2022 | Dec 2024 | Wind |
| Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 331.8 GWh | Jul 2022 | Mar 2026 | Solar |
| Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 332.8 GWh | Jul 2022 | Mar 2026 | Solar |
| Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.0 GWh | Jul 2022 | Dec 2024 | Solar |
| Wonderful Kings | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 7.7 GWh | Jul 2022 | Dec 2024 | Solar |
| Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2022 | Dec 2024 | Solar |
| Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 250.2 GWh | Sep 2022 | Mar 2026 | Solar |
| CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2024 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 310.8 GWh | Oct 2022 | Mar 2026 | Solar |
| Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 13.5 GWh | Oct 2022 | Dec 2024 | Solar |
| Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 353.9 GWh | Oct 2022 | Mar 2026 | Solar |
| Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 91.5 GWh | Oct 2022 | Mar 2026 | Solar |
| Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 27.2 GWh | Oct 2022 | Dec 2024 | Solar |
| Blythe Mesa Solar II | Blythe Mesa Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 604.1 GWh | Nov 2022 | Mar 2026 | Solar |
| CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2022 | Dec 2024 | Solar |
| Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 327.1 GWh | Nov 2022 | Mar 2026 | Solar |
| Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 155.6 GWh | Nov 2022 | Mar 2026 | Solar |
| Anheuser Busch - Fairfield | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 21.3 GWh | Nov 2022 | Dec 2024 | Natural Gas |
| 9150 Hermosa Solar GM | Valta Energy | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2022 | Dec 2024 | Solar |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2022 | Dec 2024 | Solar |
| Lemoore West | Leprino Foods | Lemoore, CA | California Independent System Operator (CISO) | 14.4 GWh | Nov 2022 | Dec 2024 | Solar |
| IGS SBD1 | Greenbacker Renewable Energy Corporation | Bloomington, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Jan 2023 | Dec 2024 | Solar |
| IGS SBD2 | Greenbacker Renewable Energy Corporation | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.8 GWh | Jan 2023 | Dec 2024 | Solar |
| CSU Sacramento I | BluePath Solar Sacramento I LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.1 GWh | Jan 2023 | Dec 2024 | Solar |
| Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2024 | Solar |
| Vulcan San Emidio Solar | Renew Solar VMC LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2023 | Dec 2024 | Solar |
| Grossmont College | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 4.4 GWh | Feb 2023 | Dec 2024 | Solar |
| Lone Oak | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2023 | Dec 2024 | Solar |
| Trona Solar III | Trona Solar III LLC | Trona, CA | California Independent System Operator (CISO) | 4.5 GWh | Mar 2023 | Dec 2024 | Solar |
| P66 Rodeo Solar | P66 Rodeo Solar | Rodeo, CA | California Independent System Operator (CISO) | 52.7 GWh | Mar 2023 | Mar 2026 | Solar |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 112.8 GWh | Apr 2023 | Mar 2026 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.0 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2023 | Dec 2024 | Solar |
| City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2023 | Dec 2024 | Solar |
| North Kern 1 | Madison Energy Investments LLC | Shafter, CA | California Independent System Operator (CISO) | 3.9 GWh | May 2023 | Dec 2024 | Solar |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 869.3 GWh | Jun 2023 | Mar 2026 | Solar |
| Berrenda Mesa Water District | The Greater Light USA LLC | Lost Hills, CA | California Independent System Operator (CISO) | 16.5 GWh | Jun 2023 | Dec 2024 | Solar |
| Lockhart Solar PV II | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 207.6 GWh | Jun 2023 | Mar 2026 | Solar |
| Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 251.5 GWh | Jul 2023 | Mar 2026 | Solar |
| CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 4.5 GWh | Jul 2023 | Dec 2024 | Solar |
| Sheep Creek Community Solar Farm | Phelan Solar LLC | El Mirage, CA | California Independent System Operator (CISO) | 5.5 GWh | Jul 2023 | Dec 2024 | Solar |
| BCE Los Alamitos 1 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 19.1 GWh | Jul 2023 | Dec 2024 | Solar |
| Resurgence Solar II | Resurgence Solar II | Boron, CA | California Independent System Operator (CISO) | 135.4 GWh | Jul 2023 | Mar 2026 | Solar |
| Sutter Home Winery GIR | Westbound Solar 3, LLC | American Canyon, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2024 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2023 | Dec 2024 | Solar |
| Fifth Standard Solar PV, LLC (Hybrid) | Big Sky Wind, LLC | Huron, CA | California Independent System Operator (CISO) | 321.5 GWh | Aug 2023 | Mar 2026 | Solar |
| CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2023 | Dec 2024 | Solar |
| Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 605.1 GWh | Aug 2023 | Mar 2026 | Solar |
| Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 600.8 GWh | Aug 2023 | Mar 2026 | Solar |
| Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 109.6 GWh | Aug 2023 | Mar 2026 | Solar |
| Wheeler Ridge | AFTW Holdings, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 11.9 GWh | Aug 2023 | Dec 2024 | Solar |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2023 | Dec 2024 | Solar |
| Cawelo Water District Solar | Scooby Solar, LLC | Famoso, CA | California Independent System Operator (CISO) | 6.7 GWh | Sep 2023 | Dec 2024 | Solar |
| Sunny Cow Solar, LLC | Sunny Cow Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 5.5 GWh | Sep 2023 | Dec 2024 | Solar |
| Case Vander Eyk, Jr Dairy Solar | Bravo REC Management LLC | Pixley, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2023 | Dec 2024 | Solar |
| Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 16.8 GWh | Oct 2023 | Dec 2024 | Other Biomass Gas |
| CA-DGS RFP-Salinas Valley State Prison | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 6.8 GWh | Oct 2023 | Dec 2024 | Solar |
| Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 10.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 8.5 GWh | Oct 2023 | Dec 2024 | Solar |
| Wheeler Ridge 2 | Madison Energy Investments LLC | Arvin, CA | California Independent System Operator (CISO) | 913.0 MWh | Oct 2023 | Dec 2024 | Solar |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 205.5 GWh | Nov 2023 | Mar 2026 | Wind |
| Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 650.5 GWh | Nov 2023 | Mar 2026 | Solar |
| Chestnut | Castanea Project LLC | Lemoore, CA | California Independent System Operator (CISO) | 381.3 GWh | Nov 2023 | Mar 2026 | Solar |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 523.5 GWh | Nov 2023 | Mar 2026 | Solar |
| Alta Sea | Signal Street Operating, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2023 | Dec 2024 | Solar |
| Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 156.3 GWh | Nov 2023 | Mar 2026 | Solar |
| SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2023 | Dec 2024 | Solar |
| Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2023 | Dec 2024 | Solar |
| North Kern 3 | Madison Energy Investments LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 MWh | Nov 2023 | Dec 2024 | Solar |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2024 | Solar |
| Amazon Bakersfield 1 Solar Project | Solar Star Prime 3, LLC | Bakersfiled, CA | California Independent System Operator (CISO) | 7.9 GWh | Dec 2023 | Dec 2024 | Solar |
| Paso Robles - Municipal Airport | Onyx Asset Services Group | Paso Robles, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2023 | Dec 2024 | Solar |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 2.8 GWh | Jan 2024 | Dec 2024 | Solar |
| CA-DGS- RFP-Correctional Training Fac | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2024 | Dec 2024 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 564.7 GWh | Feb 2024 | Mar 2026 | Solar |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 789.7 GWh | Feb 2024 | Mar 2026 | Solar |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2024 | Dec 2024 | Solar |
| Visalia CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 6.4 GWh | Feb 2024 | Dec 2024 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 2024 | Dec 2024 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2024 | Dec 2024 | Solar |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 470.9 GWh | Mar 2024 | Mar 2026 | Solar |
| CA Jurupa Valley 3251 De Forest Circle | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 4.7 GWh | Mar 2024 | Dec 2024 | Solar |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 1.0 GWh | Mar 2024 | Dec 2024 | Solar |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 311.4 GWh | Apr 2024 | Mar 2026 | Solar |
| Baldy Mesa Solar & Storage | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 310.5 GWh | Apr 2024 | Mar 2026 | Solar |
| Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 364.0 GWh | Apr 2024 | Mar 2026 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2024 | Dec 2024 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 473.5 GWh | May 2024 | Mar 2026 | Solar |
| Fresno Community Solar | Fresno Community Solar Developers, LLC | Fresno, CA | California Independent System Operator (CISO) | 15.4 GWh | May 2024 | Dec 2024 | Solar |
| Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 47.7 GWh | May 2024 | Mar 2026 | Solar |
| Mesa Wind Repower | Mesa Wind Repower | Whitewater, CA | California Independent System Operator (CISO) | 80.1 GWh | May 2024 | Dec 2024 | Wind |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2024 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on March 2026 generation numbers.| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 35.2 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 19.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 17.0 TWh |
| Riverside County, CA | # 4 | 159 | 14.8 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.0 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.0 TWh |
| Imperial County, CA | # 7 | 84 | 9.5 TWh |
| Fresno County, CA | # 8 | 119 | 7.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.3 TWh |
| Sacramento County, CA | # 10 | 65 | 5.7 TWh |
| Sonoma County, CA | # 11 | 26 | 5.1 TWh |
| San Diego County, CA | # 12 | 151 | 4.4 TWh |
| Kings County, CA | # 13 | 57 | 4.2 TWh |
| Santa Clara County, CA | # 14 | 75 | 3.5 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Solano County, CA | # 16 | 40 | 3.1 TWh |
| Tuolumne County, CA | # 17 | 23 | 3.0 TWh |
| Alameda County, CA | # 18 | 47 | 2.7 TWh |
| Stanislaus County, CA | # 19 | 25 | 2.7 TWh |
| Orange County, CA | # 20 | 59 | 2.6 TWh |
| Monterey County, CA | # 21 | 29 | 2.4 TWh |
| Colusa County, CA | # 22 | 3 | 2.2 TWh |
| Plumas County, CA | # 23 | 13 | 2.0 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| El Dorado County, CA | # 26 | 15 | 1.6 TWh |
| San Joaquin County, CA | # 27 | 47 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.6 TWh |
| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Lake County, CA | # 32 | 10 | 908.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 743.6 GWh |
| Amador County, CA | # 35 | 8 | 621.1 GWh |
| Calaveras County, CA | # 36 | 6 | 555.5 GWh |
| Merced County, CA | # 37 | 31 | 549.1 GWh |
| Trinity County, CA | # 38 | 5 | 514.3 GWh |
| Humboldt County, CA | # 39 | 10 | 450.9 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 316.4 GWh |
| Mariposa County, CA | # 42 | 2 | 299.7 GWh |
| San Benito County, CA | # 43 | 6 | 271.3 GWh |
| Nevada County, CA | # 44 | 12 | 219.1 GWh |
| Yolo County, CA | # 45 | 15 | 210.6 GWh |
| San Mateo County, CA | # 46 | 11 | 134.3 GWh |
| Siskiyou County, CA | # 47 | 8 | 89.8 GWh |
| San Francisco County, CA | # 48 | 10 | 82.1 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.3 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Marin County, CA | # 52 | 3 | 19.0 GWh |
| Glenn County, CA | # 53 | 2 | 18.7 GWh |
| Mendocino County, CA | # 54 | 5 | 12.3 GWh |
| Sierra County, CA | # 55 | 3 | 11.9 GWh |