CA-DGS- RFP-Correctional Training Fac
31625 US 101 N, Soledad, CA 93860Plant Summary Information
CA-DGS- RFP-Correctional Training Fac is ranked #514 out of 817 solar farms in California in terms of total annual net electricity generation.
CA-DGS- RFP-Correctional Training Fac generated 650.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | CA-DGS- RFP-Correctional Training Fac |
---|---|
Utility Name | Forefront Power, LLC |
Location | Monterey County, CA |
Initial Operation Date | March 2024 |
Last Update | Dec 2024 |
Annual Generation | 3.4 GWh |
Annual Consumption | 11.4 k MMBtu |
Ranked #9,032 out of 12,299 Power Plants Nationwide | |
Ranked #3,995 out of 6,182 Solar Power Plants Nationwide | |
Ranked #1,210 out of 1,566 California Power Plants | |
Ranked #514 out of 817 California Solar Power Plants | |
Fuel Types | Solar |
Map of CA-DGS- RFP-Correctional Training Fac
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CA-DGS- RFP-Correctional Training Fac.
Monthly Net Generation for CA-DGS- RFP-Correctional Training Fac
CA-DGS- RFP-Correctional Training Fac Details
Summary Information | |
---|---|
Plant Name | CA-DGS- RFP-Correctional Training Fac (65524) |
Plant Address | 31625 US 101 N, Soledad, CA 93860 |
Utility | Forefront Power, LLC (62856) |
Latitude, Longitude | 36.46767, -121.38462 |
Generation Dates on File | Feb 2024 to Dec 2024 |
Initial Operation Date | March 2024 |
Annual Generation | 3.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator 14069 Details Operating March 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2 MW |
Virtual Net Metering Agreement | No |
CA-DGS- RFP-Correctional Training Fac Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3985 | Palombo Solar, LLC CSG | Uxbridge, MA | 3.4 GWh |
#3986 | Copperfield | Troy, NC | 3.4 GWh |
#3987 | Dartmouth II Solar | Dartmouth, MA | 3.4 GWh |
#3988 | O'Neill Creek Solar | Gaston, OR | 3.4 GWh |
#3989 | Soboba Community Solar Project | San Jacinto, CA | 3.4 GWh |
#3990 | Wyse Fork Solar Farm, LLC | Dover, NC | 3.4 GWh |
#3991 | CBEP Solar 7 | Johnstown, CO | 3.4 GWh |
#3992 | Cronin Road Solar 1, LLC CSG Hybrid | Warren, MA | 3.3 GWh |
#3993 | Woodsdale Farm, LLC | Roxboro, NC | 3.4 GWh |
#3994 | Padelford Solar | Berkley, MA | 3.4 GWh |
#3996 | Ludlow Landfill | Ludlow, MA | 3.4 GWh |
#3997 | DG New Jersey Solar RLS Logistics | Newfield, NJ | 3.4 GWh |
#3998 | ATOOD Solar III LLC | Spartanburg, SC | 3.3 GWh |
#3999 | GRE Cambridge Solar | Cambridge, MN | 3.3 GWh |
#4000 | Sun Harvest Solar NDP1 | Dos Palos, CA | 3.3 GWh |
#4001 | Town of Needham VNEM CSG | Needham, MA | 3.3 GWh |
#4002 | Wappinger 9D Solar | Wappinger, NY | 3.3 GWh |
#4003 | Lister Avenue Solar | Newark, NJ | 3.3 GWh |
#4004 | Powder Hill | Enfield, CT | 3.3 GWh |
#4005 | Expressway Solar C2 | Victorville, CA | 3.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CA-DGS- RFP-Correctional Training Fac.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Johnson Canyon | Gonzales, CA | 8.7 GWh | 4.8 mi |
Blackjack Solar | King City, CA | 8.8 GWh | 28.1 mi |
CA-DGS RFP-Salinas Valley State Prison | Soledad, CA | 1.1 GWh | 0 mi |
City of Soledad Water Reclamation | Soledad, CA | 4.0 GWh | 4.1 mi |
D'Arrigo Brothers - Phase 4 | Salinas, CA | 4.1 GWh | 17.3 mi |
Enerparc CA1 LLC | Hollister, CA | 2.5 GWh | 25.2 mi |
Foundation California Training Facility | Soledad, CA | 5.4 GWh | 0.3 mi |
Foundation Dole Fresh Vegetables | Soledad, CA | 17.1 GWh | 2 mi |
Foundation Mann Packing | Gonzales, CA | 5.6 GWh | 4.6 mi |
Foundation SaIinas Valley State Prison | Soledad, CA | 4.8 GWh | 0.9 mi |
Foundation Scheid Vineyards | Greenfield, CA | 3.9 GWh | 17.1 mi |
Hollister Solar LLC | Hollister, CA | 3.7 GWh | 27.4 mi |
King City Peaking | King City, CA | 11.9 GWh | 22.2 mi |
King City Power Plant | King City, CA | 38.1 GWh | 22 mi |
Marina Landfill Gas | Marina, CA | 22.8 GWh | 27.2 mi |
Monterey One Water | Marina, CA | 7.3 GWh | 27 mi |
Taylor Farms | Gonzales, CA | 3.9 GWh | 4.5 mi |
Taylor Farms - Schilling Place | Salinas, CA | 8.5 GWh | 18.5 mi |
Taylor Farms Salinas | Salinas, CA | 7.6 GWh | 18.6 mi |
TLR000 Hansen Fuel Cell | Salinas, CA | 8.2 GWh | 18.6 mi |