City of Long Beach Airport Lot A & B
4100 Donald Douglas Drive, Long Beach, CA 90808Plant Summary Information
City of Long Beach Airport Lot A & B is ranked #565 out of 817 solar farms in California in terms of total annual net electricity generation.
City of Long Beach Airport Lot A & B generated 546.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | City of Long Beach Airport Lot A & B |
---|---|
Utility Name | Solar DG CA Long Beach, LLC |
Location | Los Angeles County, CA |
Initial Operation Date | February 2024 |
Last Update | Dec 2024 |
Annual Generation | 2.8 GWh |
Annual Consumption | 9.7 k MMBtu |
Ranked #9,484 out of 12,299 Power Plants Nationwide | |
Ranked #4,398 out of 6,182 Solar Power Plants Nationwide | |
Ranked #1,269 out of 1,566 California Power Plants | |
Ranked #565 out of 817 California Solar Power Plants | |
Fuel Types | Solar |
Map of City of Long Beach Airport Lot A & B
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for City of Long Beach Airport Lot A & B.
Monthly Net Generation for City of Long Beach Airport Lot A & B
City of Long Beach Airport Lot A & B Details
Summary Information | |
---|---|
Plant Name | City of Long Beach Airport Lot A & B (67994) |
Plant Address | 4100 Donald Douglas Drive, Long Beach, CA 90808 |
Utility | Solar DG CA Long Beach, LLC (66541) |
Latitude, Longitude | 33.81516, -118.14117 |
Generation Dates on File | Mar 2024 to Dec 2024 |
Initial Operation Date | February 2024 |
Annual Generation | 2.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator COLBA Details Operating February 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 0.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 7 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2 MW |
Virtual Net Metering Agreement | No |
City of Long Beach Airport Lot A & B Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4388 | 205 Sturbridge A | Brimfield, MA | 2.9 GWh |
#4389 | Magdaline Solar, LLC | Lynchburg, SC | 2.8 GWh |
#4390 | Mt Arlington Solar 1 LLC | Mt Arlington, NJ | 2.8 GWh |
#4391 | HCE Moore I | Aberdeen, NC | 2.8 GWh |
#4392 | Harford Solar Farm | Harford, NY | 2.8 GWh |
#4393 | 9150 Hermosa Solar GM | Rancho Cucamonga, CA | 2.8 GWh |
#4394 | Greenville CSG | Port Jervis, NY | 2.8 GWh |
#4395 | Onondaga County- Clearwater | Oswego, NY | 2.8 GWh |
#4396 | Galesburg Solar Array | Oquawka, IL | 2.8 GWh |
#4397 | City of Paris Solar | Paris, AR | 2.8 GWh |
#4399 | Open View Solar Farm | New Haven, VT | 2.8 GWh |
#4400 | Rappahannock Solar, LLC | White Stone, VA | 2.8 GWh |
#4401 | SEPV 2 | Twentynine Palms, CA | 2.8 GWh |
#4402 | Newton Grove | Newton Grove, NC | 2.8 GWh |
#4403 | Stetson Road Solar - Barre I | Barre, MA | 2.8 GWh |
#4404 | Neisler Street Solar | Shelby, NC | 2.8 GWh |
#4405 | Ryans Ranch | Paris, ME | 2.8 GWh |
#4406 | Limelight Solar II LLC | Spartanburg, SC | 2.8 GWh |
#4407 | IPC 25 Solar | Tracy, CA | 2.8 GWh |
#4408 | Bob Wiley Detention Center | Visalia, CA | 2.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding City of Long Beach Airport Lot A & B.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Alamitos Energy Center | Long Beach, CA | 2.3 TWh | 4.1 mi |
AES Alamitos LLC | Long Beach, CA | 30.6 GWh | 4 mi |
BCE Los Alamitos 1 | Los Alamitos, CA | 25.6 GWh | 4.8 mi |
BCE Los Alamitos 2 | Los Alamitos, CA | 3.4 GWh | 5.6 mi |
Carson Cogeneration | Carson, CA | 29.1 GWh | 7.5 mi |
Colon PV | Wilmington, CA | 1.2 GWh | 6.6 mi |
CSU Long Beach Lots 7 & 14 | Long Beach, CA | 6.9 GWh | 2.8 mi |
Dominguez Plant | Long Beach, CA | 13.7 GWh | 5.7 mi |
Equilon Los Angeles Refining | Wilmington, CA | 369.3 GWh | 5.6 mi |
Harbor Cogen | Wilmington, CA | 17.4 GWh | 5.8 mi |
Haynes | Long Beach, CA | 2.0 TWh | 4.2 mi |
Kaiser Downey | Downey, CA | 8.7 GWh | 7.2 mi |
Long Beach Generation LLC | Long Beach, CA | 10.3 GWh | 6 mi |
Signal Hill West Unit | Signal Hill, CA | 38.4 GWh | 2 mi |
Southeast Resource Recovery | Long Beach, CA | 89.9 GWh | 6.9 mi |
THUMS | Long Beach, CA | 285.9 GWh | 5.3 mi |
Toyota Long Beach Trigen | Long Beach, CA | 16.8 GWh | 5.2 mi |
Valero Wilmington Cogeneration Plant | Wilmington, CA | 228.2 GWh | 6.1 mi |
Watson Cogeneration | Carson, CA | 2.4 TWh | 6 mi |
Wilmington Hydrogen Plant | Wilmington, CA | 136.2 GWh | 6.2 mi |