Bishop Ranch - BR 15-CC
12657 Alcosta Blvd, San Ramon, CA 94583Plant Summary Information
Bishop Ranch - BR 15-CC is ranked #856 out of 914 solar farms in California in terms of total annual net electricity generation.
Bishop Ranch - BR 15-CC generated 164.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Bishop Ranch - BR 15-CC |
|---|---|
| Utility Name | Alcosta Boulevard BR 15-CC Solar Project 2020, LLC |
| Location | Contra Costa County, CA |
| Initial Operation Date | March 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 950.0 MWh |
| Annual Consumption | 3.2 k MMBtu |
| Ranked #12,139 out of 13,269 Power Plants Nationwide | |
| Ranked #6,835 out of 7,183 Solar Power Plants Nationwide | |
| Ranked #1,558 out of 1,637 California Power Plants | |
| Ranked #856 out of 914 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Bishop Ranch - BR 15-CC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bishop Ranch - BR 15-CC.
Monthly Net Generation for Bishop Ranch - BR 15-CC
Monthly Plant Fuel Consumption for Bishop Ranch - BR 15-CC
Bishop Ranch - BR 15-CC Details
| Summary Information | |
|---|---|
| Plant Name | Bishop Ranch - BR 15-CC (68525) |
| Plant Address | 12657 Alcosta Blvd, San Ramon, CA 94583 |
| Utility | Alcosta Boulevard BR 15-CC Solar Project 2020, LLC (66896) |
| Latitude, Longitude | 37.77332, -121.96025 |
| Generation Dates on File | Mar 2025 to Dec 2025 |
| Initial Operation Date | March 2025 |
| Annual Generation | 950.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 21-1167-000, 21-1167-001, 21-1167-002 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | Yes |
Generator 4656B Details Operating March 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 1.1 |
|---|---|
| Maximum Charge Rate | 0.5 MW |
| Maximum Discharge Rate | 0.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.1 |
| Storage Enclosure Type | CS |
| System Peak Shaving | Yes |
| Load Management | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 68525 / 68525 |
| Direct Support Gen Id | 4656C / 4656R |
| Support T D Asset | No |
Generator 4656C Details Operating March 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 240.5 |
| Tilt Angle | 5 |
| DC Net Capacity | 0.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.6 MW |
| Virtual Net Metering Agreement | No |
Generator 4656R Details Operating March 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.2 MW |
| Summer Capacity | 0.2 MW |
| Winter Capacity | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 150 |
| Tilt Angle | 10 |
| DC Net Capacity | 0.22 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.2 MW |
| Virtual Net Metering Agreement | No |
Bishop Ranch - BR 15-CC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6825 | Gilead Oceanside Solar Project | Oceanside, CA | 952.0 MWh |
| #6826 | CBS Television City | Los Angeles, CA | 977.0 MWh |
| #6827 | Progress Manis I | Laurinburg, NC | 974.0 MWh |
| #6828 | AC Criminal Courts Complex SPE2, LLC | Mays Landing, NJ | 972.0 MWh |
| #6829 | Kotzebue Hybrid | Kotzebue, AK | 20.3 GWh |
| #6830 | Lineage MS | Richland, MS | 971.0 MWh |
| #6831 | Brookside | North Smithfield, RI | 969.0 MWh |
| #6832 | WW-DC Solar 1, LLC | Washington, DC | 962.0 MWh |
| #6833 | MSC-Chisago02 LLC | Taylors Falls, MN | 954.0 MWh |
| #6834 | NEDC Solar Site | Whitinsville, MA | 953.0 MWh |
| #6836 | SunE Rochester | Rancho Cucamonga, CA | 946.0 MWh |
| #6837 | Hopewell Valley High School Hybrid | Pennington, NJ | 946.0 MWh |
| #6838 | 401 South | Dalton, MA | 945.0 MWh |
| #6839 | Shelby Solar Energy Generation Facility | Shelby, NC | 938.0 MWh |
| #6840 | LTMUA | Villas, NJ | 933.0 MWh |
| #6841 | Caldwell Wastewater Treatment Plant Hybr | West Caldwell, NJ | 932.0 MWh |
| #6842 | Rariton OMP | Raritan, NJ | 932.0 MWh |
| #6843 | Morgantown Solar Park | Morgantown, PA | 930.0 MWh |
| #6844 | Broadway 3 - UC Merced 1 | Merced, CA | 929.0 MWh |
| #6845 | USS Greenhouse Solar LLC CSG | Pine Island, MN | 927.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bishop Ranch - BR 15-CC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Vasco Road | Livermore, CA | 32.7 GWh | 12.7 mi |
| AT&T - Hayward | Hayward, CA | 7.6 GWh | 10.8 mi |
| Bishop Ranch - BR 1-Y | San Ramon, CA | 1.7 GWh | 0.8 mi |
| Bishop Ranch - BR 15-AA | San Ramon, CA | 766.0 MWh | 0.2 mi |
| Bishop Ranch - BR 15-DD | San Ramon, CA | 62.0 MWh | 0.1 mi |
| Bishop Ranch - BR 2600 | San Ramon, CA | 764.0 MWh | 0.5 mi |
| Bishop Ranch - BR 8-O | San Ramon, CA | 1.4 GWh | 0.5 mi |
| Bishop Ranch - BR 8-P | San Ramon, CA | 1.3 GWh | 0.5 mi |
| Bishop Ranch - BR 8-Q | San Ramon, CA | 871.0 MWh | 0.5 mi |
| Bishop Ranch BR 1-X | San Ramon, CA | 1.5 GWh | 1 mi |
| Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.9 GWh | 6.3 mi |
| KSR028 Merced Fuel Cell | San Leandro, CA | 16.4 GWh | 12.1 mi |
| Las Positas College | Livermore, CA | 1.7 GWh | 9.8 mi |
| Life Technologies - Pleasanton | Pleasanton, CA | 8.3 GWh | 9.9 mi |
| Preferred Freezer San Leandro | San Leandro, CA | 3.0 GWh | 11.2 mi |
| Russell City Energy Center | Hayward, CA | 1.6 TWh | 13.5 mi |
| Santa Rita Jail Fuel Cell | Dublin, CA | 8.1 GWh | 5.5 mi |
| Santa Rita Jail Hybrid | Dublin, CA | 10.4 GWh | 5.5 mi |
| Thermo Fisher Pleasanton | Pleasanton, CA | 1.5 GWh | 9.8 mi |
| Vasco Winds | Livermore, CA | 233.7 GWh | 13.3 mi |