Camp San Luis Obispo
10 Sonoma Ave., San Luis Obispo, CA 93405Plant Summary Information
Camp San Luis Obispo is ranked #839 out of 849 solar farms in California in terms of total annual net electricity generation.
Camp San Luis Obispo generated 158.0 MWh during the 3-month period between August 2024 to November 2024.
| Plant Name | Camp San Luis Obispo |
|---|---|
| Utility Name | Ecoplexus, Inc |
| Location | San Luis Obispo County, CA |
| Initial Operation Date | August 2024 |
| Last Update | Nov 2024 |
| Annual Generation | 158.0 MWh |
| Annual Consumption | 539 MMBtu |
| Ranked #12,029 out of 12,539 Power Plants Nationwide | |
| Ranked #6,306 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,586 out of 1,600 California Power Plants | |
| Ranked #839 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Camp San Luis Obispo
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Camp San Luis Obispo.
Monthly Net Generation for Camp San Luis Obispo
Camp San Luis Obispo Details
| Summary Information | |
|---|---|
| Plant Name | Camp San Luis Obispo (63870) |
| Plant Address | 10 Sonoma Ave., San Luis Obispo, CA 93405 |
| Utility | Ecoplexus, Inc (58970) |
| Latitude, Longitude | 35.32204, -120.73228 |
| Generation Dates on File | Oct 2024 to Nov 2024 |
| Initial Operation Date | August 2024 |
| Annual Generation | 158.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF18-1598-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator CPSLO Details Operating August 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Dual Axis Tracking | No |
|---|---|
| Fixed Tilt | Yes |
| Bifacial | Yes |
| Other Solar Technology | No |
| Azimuth Angle | 206.6 |
| Tilt Angle | 12.3 |
| DC Net Capacity | 1.63 MW |
| Crystalline Silicon | Yes |
| Thin Film Other | No |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.2 MW |
| Virtual Net Metering Agreement | No |
Camp San Luis Obispo Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6296 | OR - Solops - SPI 18 - Clayfield | Estacada, OR | 202.0 MWh |
| #6297 | Ticon Solar | Ticonderoga, NY | 198.0 MWh |
| #6298 | TAC-Distributed Energy Resource Hybrid | Champaign, IL | 307.0 MWh |
| #6299 | Foxconn Ohio | Warren, OH | 184.0 MWh |
| #6300 | MN East Regal LLC (CSG) | Paynesville, MN | 179.0 MWh |
| #6301 | Merck Rahway Power Plant | Rahway, NJ | 33.4 GWh |
| #6302 | BNRG Norridgewock (CSG) | Norridgewock, ME | 171.0 MWh |
| #6303 | Tipton 1 - (CA) | Tipton, CA | 167.0 MWh |
| #6304 | Osage City Solar | Osage City, KS | 164.0 MWh |
| #6305 | Three Rivers Solar LLC | Wilbraham, MA | 154.0 MWh |
| #6307 | St. Clair Solar 3 | Washington Park, IL | 158.0 MWh |
| #6308 | Metro Support Services Center Solar | Los Angeles, CA | 154.0 MWh |
| #6309 | FedEx Middletown | Middletown, CT | 151.0 MWh |
| #6310 | Bayville Central Facility | Bayville, NJ | 2.0 GWh |
| #6311 | BNRG North Anson (CSG) | North Anson, ME | 143.0 MWh |
| #6312 | N Solon Road (South) | Richmond, IL | 138.0 MWh |
| #6313 | Sand Prairie Solar | Green Valley, IL | 136.0 MWh |
| #6314 | Quaker | Queensbury, NY | 125.0 MWh |
| #6315 | E-Volve Energy Holdings LLC | Sealy, TX | 123.0 MWh |
| #6316 | Swaggertown Solar I | Glenville, NY | 122.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Camp San Luis Obispo.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aera San Ardo Cogen Facility | San Ardo, CA | 17.2 GWh | 44.2 mi |
| Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 11.2 mi |
| CA Flats Solar 130, LLC | Shandon, CA | 262.5 GWh | 27.4 mi |
| CA Flats Solar 150, LLC | Shandon, CA | 299.6 GWh | 27.4 mi |
| CA-DGS-California Men's Colony | San Luis Obispo, CA | 4.6 GWh | 2.2 mi |
| California Valley Solar Ranch | California Valley, CA | 597.7 GWh | 46 mi |
| Cold Canyon 1 | San Luis Obispo, CA | 3.8 GWh | 12 mi |
| Diablo Canyon | Avila Beach, CA | 18.5 TWh | 10.3 mi |
| Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.3 GWh | 19 mi |
| Meridian Vineyards | Paso Robles, CA | 1.0 GWh | 25.8 mi |
| Nacimiento Hydro Project | Bradley, CA | 18.2 GWh | 34 mi |
| Paso Robles - Municipal Airport | Paso Robles, CA | 6.0 GWh | 25.3 mi |
| Salinas River Cogeneration | San Ardo, CA | 258.0 GWh | 44.2 mi |
| Stenner Creek Solar | San Luis Obispo, CA | 9.5 GWh | 2.3 mi |
| Strauss Wind Farm | Lompoc, CA | 230.0 GWh | 52.2 mi |
| Sutter Home Winery TCC | Paso Robles, CA | 1.1 GWh | 28.7 mi |
| Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh | 37.8 mi |
| Vandenberg Solar Project | Vandenberg Airforce B, CA | 39.7 GWh | 41.5 mi |
| Vintner Solar | Templeton, CA | 4.2 GWh | 16.5 mi |
| Wonderful Orchards - West Valley | Blackwells Corner, CA | 1.4 GWh | 48.6 mi |