Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.6 GWh | Jun 2018 | Dec 2024 | Natural Gas |
California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 4.6 GWh | Jun 2018 | Dec 2024 | Solar |
Green Beanworks C PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 5.1 GWh | Jul 2018 | Dec 2024 | Solar |
Green Beanworks D PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 4.1 GWh | Jul 2018 | Dec 2024 | Solar |
Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2024 | Wind |
Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2018 | Dec 2024 | Wind |
Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2018 | Dec 2024 | Solar |
Prologis L.P | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 5.8 GWh | Jul 2018 | Dec 2024 | Solar |
Midway Solar Farm III | Greenbacker Renewable Energy Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 50.9 GWh | Aug 2018 | Dec 2024 | Solar |
Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2018 | Dec 2024 | Solar |
PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2018 | Dec 2024 | Solar |
AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2018 | Dec 2024 | Natural Gas |
EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 22.5 GWh | Aug 2018 | Dec 2024 | Natural Gas |
TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 8.2 GWh | Aug 2018 | Dec 2024 | Natural Gas |
Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2018 | Dec 2024 | Solar |
Keysight - Santa Rosa | Bloom Energy | Santa Rosa, CA | California Independent System Operator (CISO) | 12.8 GWh | Aug 2018 | Dec 2024 | Natural Gas |
Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Aug 2018 | Dec 2024 | Solar |
San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 24.5 GWh | Sep 2018 | Dec 2024 | Solar |
SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 3.8 GWh | Sep 2018 | Dec 2023 | Solar |
Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2018 | Dec 2024 | Solar |
Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 663.5 GWh | Oct 2018 | Apr 2025 | Solar |
Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
Colgreen North Shore Solar Farm | Sunpin Holdings, LLC | Mecca, CA | Imperial Irrigation District (IID) | 124.8 GWh | Nov 2018 | Apr 2025 | Solar |
Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 265.5 GWh | Nov 2018 | Apr 2025 | Solar |
Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.1 GWh | Nov 2018 | Dec 2024 | Solar |
Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 496.1 GWh | Nov 2018 | Apr 2025 | Wind |
Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 148.3 GWh | Nov 2018 | Apr 2025 | Wind |
Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 80.9 GWh | Nov 2018 | Dec 2024 | Wind |
Wistaria Ranch Solar | Consolidated Edison Development Inc. | Calexico, CA | California Independent System Operator (CISO) | 297.5 GWh | Nov 2018 | Apr 2025 | Solar |
UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2018 | Dec 2024 | Solar |
County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2024 | Solar |
Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2024 | Solar |
Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
Xebec 1 | AES Distributed Energy | Sun Valley, CA | Los Angeles Department of Water and Power (LDWP) | 2.3 GWh | Nov 2018 | Dec 2024 | Solar |
Francisco St. Solar | AES Distributed Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2018 | Dec 2024 | Solar |
CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 642.0 MWh | Nov 2018 | Dec 2024 | Solar |
Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 8.0 GWh | Nov 2018 | Dec 2024 | Natural Gas |
Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2018 | Dec 2023 | Solar |
SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2018 | Dec 2024 | Natural Gas |
Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2018 | Dec 2024 | Solar |
Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 595.0 MWh | Nov 2018 | Dec 2024 | Solar |
Carlsbad Energy Center | NRG California Peaker Operations LLC | Carlsbad, CA | California Independent System Operator (CISO) | 259.1 GWh | Nov 2018 | Apr 2025 | Natural Gas |
Blackwell Solar Park | Consolidated Edison Development Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 31.3 GWh | Dec 2018 | Dec 2024 | Solar |
Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 243.5 GWh | Dec 2018 | Apr 2025 | Solar |
CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Dec 2018 | Dec 2024 | Natural Gas |
OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Dec 2018 | Dec 2024 | Solar |
CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 301.6 GWh | Jan 2019 | Apr 2025 | Solar |
Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2019 | Dec 2024 | Solar |
D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.1 GWh | Feb 2019 | Dec 2023 | Solar |
Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 10.0 GWh | Feb 2019 | Mar 2024 | Natural Gas |
Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 21.2 GWh | Feb 2019 | Dec 2024 | Natural Gas |
Chambers 4 - Redland LGB4 | MN8 Energy LLC | Redlands, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2019 | Dec 2024 | Solar |
Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
GEN005 Antibody Fuel Cell | 2016 ESA Project Company, LLC | Oceanside, CA | California Independent System Operator (CISO) | 20.6 GWh | Mar 2019 | Dec 2024 | Natural Gas |
Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
Folsom SP and CSP Sacramento | Ecoplexus, Inc | Represa, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Apr 2019 | Dec 2024 | Solar |
Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.9 GWh | Apr 2019 | Jun 2024 | Natural Gas |
North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 398.4 GWh | May 2019 | Apr 2025 | Solar |
HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 11.5 GWh | May 2019 | Dec 2024 | Solar |
Moonlight Packing - Phase 2 | CalCom Energy | Reedley, CA | California Independent System Operator (CISO) | 2.6 GWh | May 2019 | Dec 2024 | Solar |
JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 9.2 GWh | May 2019 | Dec 2024 | Natural Gas |
Springbok 3 Solar Farm Hybrid | 64KT 8me LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 250.8 GWh | Jun 2019 | Apr 2025 | Solar |
Blue Shld Of Cal- El Dorado Hlls Mtr B | Tesla Inc. | El Dorado Hills, CA | Balancing Authority of Northern California (BANC) | 2.8 GWh | Jun 2019 | Dec 2024 | Solar |
Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
Taylor Farms - Schilling Place | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 8.5 GWh | Jun 2019 | Dec 2024 | Natural Gas |
San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 243.5 GWh | Jul 2019 | Apr 2025 | Solar |
Citizens Imperial Solar | Citizens Enterprises Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 46.2 GWh | Jul 2019 | Apr 2025 | Solar |
Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 57.7 GWh | Aug 2019 | Dec 2024 | Solar |
American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.9 GWh | Aug 2019 | Dec 2024 | Solar |
CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2019 | Dec 2024 | Solar |
Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 29.4 GWh | Aug 2019 | Dec 2024 | Natural Gas |
EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 19.6 GWh | Aug 2019 | Dec 2024 | Natural Gas |
Kaiser - Woodland Hills | Bloom Energy | Woodland Hills, CA | California Independent System Operator (CISO) | 20.8 GWh | Aug 2019 | Dec 2024 | Natural Gas |
Sutter Santa Rosa Solar | Sutter Santa Rosa Solar LLC | Santa Rosa, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2019 | Dec 2024 | Solar |
Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 294.3 GWh | Oct 2019 | Apr 2025 | Solar |
CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 7.9 GWh | Oct 2019 | Dec 2024 | Solar |
ATT Ventura Blvd | Bloom Energy | Sherman Oaks, CA | Los Angeles Department of Water and Power (LDWP) | 8.3 GWh | Oct 2019 | Dec 2024 | Natural Gas |
South County Detention Center Solar | SoCore Energy LLC | Porterville, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2019 | Dec 2024 | Solar |
North Juvenile Detention Center Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2019 | Dec 2024 | Solar |
Tulare Akers Professional Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2024 | Solar |
Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 355.5 GWh | Nov 2019 | Apr 2025 | Solar |
Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 46.6 GWh | Nov 2019 | Dec 2024 | Solar |
Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 400.9 GWh | Nov 2019 | Apr 2025 | Wind |
Tulare BioMAT Fuel Cell | Central CA Fuel Cell 2, LLC | Tulare, CA | California Independent System Operator (CISO) | 13.7 GWh | Nov 2019 | Jul 2024 | Natural Gas : 63.4% Other Biomass Gas : 36.6% |
SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2019 | Dec 2024 | Solar |
Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2019 | Dec 2024 | Solar |
ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2019 | Dec 2024 | Natural Gas |
Vacaville Hospital | KP Vacaville Solar, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2019 | Dec 2024 | Solar |
Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 16.7 GWh | Nov 2019 | Dec 2024 | Solar |
Calipatria State Prison | Ecoplexus, Inc | Calipatria, CA | Imperial Irrigation District (IID) | 16.5 GWh | Nov 2019 | Dec 2024 | Solar |
CalTech - Pasadena Wilson Ave | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 10.1 GWh | Nov 2019 | Dec 2024 | Natural Gas |
Kaiser - Harbor City | Bloom Energy | Harbor City, CA | California Independent System Operator (CISO) | 17.9 GWh | Nov 2019 | Dec 2024 | Natural Gas |
Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 410.4 GWh | Dec 2019 | Apr 2025 | Solar |
AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 2.3 TWh | Jan 2020 | Apr 2025 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on April 2025 generation numbers.County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Kern County, CA | # 1 | 311 | 34.0 TWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Alameda County, CA | # 22 | 46 | 2.4 TWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Yuba County, CA | # 27 | 5 | 1.7 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Mendocino County, CA | # 55 | 5 | 12.3 GWh |