Enchanted Rock Turlock Irrigation Distri
1501 W Marshall Road, Patterson, CA 95363Plant Summary Information
Enchanted Rock Turlock Irrigation Distri is ranked #273 out of 316 natural gas power plants in California in terms of total annual net electricity generation.
Enchanted Rock Turlock Irrigation Distri is comprised of 4 generators and generated 675.7 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Enchanted Rock Turlock Irrigation Distri |
|---|---|
| Utility Name | Enchanted Rock |
| Location | Stanislaus County, CA |
| Initial Operation Date | May 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 2.5 GWh |
| Annual Consumption | 35.5 k MMBtu |
| Ranked #10,306 out of 13,081 Power Plants Nationwide | |
| Ranked #1,772 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #1,322 out of 1,606 California Power Plants | |
| Ranked #273 out of 316 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Enchanted Rock Turlock Irrigation Distri
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Enchanted Rock Turlock Irrigation Distri.
Monthly Net Generation for Enchanted Rock Turlock Irrigation Distri
Monthly Plant Fuel Consumption for Enchanted Rock Turlock Irrigation Distri
Enchanted Rock Turlock Irrigation Distri Details
| Summary Information | |
|---|---|
| Plant Name | Enchanted Rock Turlock Irrigation Distri (66680) |
| Plant Address | 1501 W Marshall Road, Patterson, CA 95363 |
| Utility | Enchanted Rock (65660) |
| Latitude, Longitude | 37.43585, -121.13104 |
| Generation Dates on File | Jan 2025 to Dec 2025 |
| Initial Operation Date | May 2024 |
| Annual Generation | 2.5 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Turlock Irrigation District (TIDC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Turlock Irrigation District (19281) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | PACIFIC GAS |
| Natural Gas Storage | No |
Generator UNIT1 Details Operating May 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 11.7 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 11.7 MW |
| Winter Capacity | 11.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator UNIT2 Details Operating May 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 11.7 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 11.7 MW |
| Winter Capacity | 11.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator UNIT3 Details Operating May 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 11.7 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 11.7 MW |
| Winter Capacity | 11.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator UNIT4 Details Operating May 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 11.7 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 11.7 MW |
| Winter Capacity | 11.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Enchanted Rock Turlock Irrigation Distri Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1762 | Greenleaf 1 | Yuba City, CA | 2.6 GWh |
| #1763 | Merl Parr | Charles City, IA | 2.6 GWh |
| #1764 | Oswego Harbor Power | Oswego, NY | 130.8 GWh |
| #1765 | MMWEC Simple Cycle Gas Turbine | Peabody, MA | 8.3 GWh |
| #1766 | Napoleon Peaking Station | Napoleon, OH | 2.6 GWh |
| #1767 | Carson Cogeneration | Carson, CA | 2.6 GWh |
| #1768 | Creed Energy Center | Suisun, CA | 2.6 GWh |
| #1769 | Hanford Energy Park Peaker | Hanford, CA | 2.5 GWh |
| #1770 | Major Oak Power | Bremond, TX | 2.3 TWh |
| #1771 | Galion Generating Station | Galion, OH | 2.5 GWh |
| #1773 | Coralville GT | Coralville, IA | 2.5 GWh |
| #1774 | MPH Elwood | Elwood, IL | 2.4 GWh |
| #1775 | Miles City GT | Miles City, MT | 2.4 GWh |
| #1776 | Delano Energy Center | Delano, CA | 2.4 GWh |
| #1777 | West 14th Street | Winfield, KS | 2.4 GWh |
| #1778 | Bear Valley Power Plant | Big Bear Lake, CA | 2.4 GWh |
| #1779 | Davenport Water Pollution Control Plant | Davenport, IA | 6.4 GWh |
| #1780 | C W Burdick | Grand Island, NE | 2.8 GWh |
| #1781 | Kaukauna Gas Turbine | Kaukauna, WI | 2.3 GWh |
| #1782 | Hardin Generator Project | Hardin, MT | 366.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Enchanted Rock Turlock Irrigation Distri.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Almond Power Plant | Modesto, CA | 137.4 GWh | 12.5 mi |
| AltaGas Ripon Energy Inc. | Ripon, CA | 1.1 GWh | 20.5 mi |
| Amazon - Patterson PV | Patterson, CA | 4.9 GWh | 3 mi |
| Axium Modesto Solar | Modesto, CA | 53.2 GWh | 21.9 mi |
| CA Manteca 730 Spreckels Ave | Manteca, CA | 100.0 MWh | 24.6 mi |
| Central 40 | Newman, CA | 76.3 GWh | 13.2 mi |
| Covanta Stanislaus Energy | Crows Landing, CA | 61.9 GWh | 3.5 mi |
| ERock MID Claribel Generation Station | Modesto, CA | 3.4 GWh | 20.9 mi |
| Frontier Solar LLC | Newman, CA | 47.9 GWh | 3.9 mi |
| Hickman | Hickman, CA | 3.6 GWh | 24.7 mi |
| McClure | Modesto, CA | 1.6 GWh | 17.3 mi |
| Paulsell | Crows Landing, CA | 47.5 GWh | 4.3 mi |
| Proxima | Crows Landing, CA | 464.5 GWh | 3 mi |
| Quinto Solar PV Project | Gustine, CA | 242.5 GWh | 21.6 mi |
| Ripon Generation Station | Ripon, CA | 2.8 GWh | 20.4 mi |
| Teichert Materials-Teichert Vernalis | San Joaquin, CA | 1.6 GWh | 17.6 mi |
| Tracy 18 - SLCVA418 | Tracy, CA | 182.0 MWh | 26 mi |
| Walnut Energy Center | Turlock, CA | 1.5 TWh | 13.4 mi |
| West Tambo Clean Power II | Livingston, CA | 4.3 GWh | 23.2 mi |
| Woodland | Modesto, CA | 283.1 GWh | 16.2 mi |