Sutter Home Winery TCC

8998 N River Road, Paso Robles, CA 93446

Plant Summary Information

Sutter Home Winery TCC is ranked #750 out of 885 solar farms in California in terms of total annual net electricity generation.

Sutter Home Winery TCC generated 263.0 MWh during the 3-month period between September 2025 to December 2025.

Plant NameSutter Home Winery TCC
Utility NameREC SHW, LLC
LocationSan Luis Obispo County, CA
Initial Operation DateMay 2024
Last Update Dec 2025
Annual Generation 1.7 GWh
Annual Consumption 5.9 k MMBtu
Ranked #11,377 out of 13,081 Power Plants Nationwide
Ranked #6,184 out of 7,015 Solar Power Plants Nationwide
Ranked #1,437 out of 1,606 California Power Plants
Ranked #750 out of 885 California Solar Power Plants
Fuel Types Solar

Map of Sutter Home Winery TCC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sutter Home Winery TCC.

Create Your Account Today

Monthly Net Generation for Sutter Home Winery TCC

Monthly Plant Fuel Consumption for Sutter Home Winery TCC

Sutter Home Winery TCC Details

Summary Information
Plant NameSutter Home Winery TCC (68630)
Plant Address8998 N River Road, Paso Robles, CA 93446
UtilityREC SHW, LLC (67006)
Latitude, Longitude35.73561, -120.68527
Generation Dates on FileMay 2024 to Dec 2025
Initial Operation DateMay 2024
Annual Generation 1.7 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator SHTCC Details Operating May 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.1 MW
Summer Capacity1.1 MW
Winter Capacity1.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity1.2 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.4 MW
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity0.7 MW

Sutter Home Winery TCC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6174Clinton SolarGriswold, CT1.7 GWh
#6175BPU Solar FarmKansas City, KS1.7 GWh
#6176WMATA - Anacostia CSGWashington, DC1.7 GWh
#6177Medin 2 Community Solar LLC CSGCenter City, MN1.7 GWh
#6178FastSun 4 CSGHugo, MN1.7 GWh
#6179Santa Rosa Junior College Petaluma SolarPetaluma, CA1.7 GWh
#6180Epic VeronaVerona, WI1.8 GWh
#6181Niagara Bottling StocktonStockton, CA1.7 GWh
#6182Huneke CSG 1, LLCZumbrota, MN1.7 GWh
#6183Cranbury 0210 SolarCranbury, NJ1.7 GWh
#6185Cannon Garden SolarFaribault, MN1.7 GWh
#6186Park StRutland, VT1.7 GWh
#6187Bishop Ranch - BR 1-YSan Ramon, CA1.7 GWh
#6188Sturbridge BarnCharlton, MA1.7 GWh
#6189Marion Solar 2Sandoval, IL1.7 GWh
#6190Hormel CSG SolarMontevideo, MN1.7 GWh
#6191Falls Creek GardenFaribault, MN1.7 GWh
#6192Town of Norfolk MA at Medway BranchNorfolk, MA1.7 GWh
#6193Downsville DPC SolarMenomonee, WI1.7 GWh
#6194Howard Lane SolarGlocester, RI1.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Sutter Home Winery TCC.

Plant NamePlant LocationAnnual GenerationDistance
Aera San Ardo Cogen FacilitySan Ardo, CA19.6 GWh17.9 mi
Atascadero State HospitalAtascadero, CA2.8 GWh19 mi
Blackjack SolarKing City, CA9.0 GWh36.2 mi
CA Flats Solar 130, LLCShandon, CA255.2 GWh17.8 mi
CA Flats Solar 150, LLCShandon, CA288.3 GWh17.8 mi
CA-DGS RFP-Pleasant Valley State PrisonCoalinga, CA4.0 GWh36.5 mi
CA-DGS-California Men's ColonySan Luis Obispo, CA4.6 GWh28.3 mi
Camp San Luis ObispoSan Luis Obispo, CA2.4 GWh28.7 mi
CED AvenalAvenal, CA16.0 GWh34.9 mi
Coalinga 25D CogenCoalinga, CA38.9 GWh33.2 mi
Coalinga Cogeneration FacilityCoalinga, CA42.0 GWh35 mi
Firestone Walker Brewery - Phase 1Paso Robles, CA3.9 GWh9.7 mi
Meridian VineyardsPaso Robles, CA1.0 GWh8 mi
Nacimiento Hydro ProjectBradley, CA11.8 GWh11.9 mi
Paso Robles - Municipal AirportPaso Robles, CA7.6 GWh4.8 mi
Salinas River CogenerationSan Ardo, CA255.4 GWh18.1 mi
Sand Drag LLCAvenal, CA31.9 GWh36.4 mi
Stenner Creek SolarSan Luis Obispo, CA9.6 GWh28.7 mi
Sun City Project LLCAvenal, CA33.4 GWh36.5 mi
Vintner SolarTempleton, CA4.0 GWh12.3 mi