Sutter Home Winery TCC

8998 N River Road, Paso Robles, CA 93446

Plant Summary Information

Sutter Home Winery TCC is ranked #769 out of 917 solar farms in California in terms of total annual net electricity generation.

Sutter Home Winery TCC generated 263.0 MWh during the 3-month period between September 2025 to December 2025.

Plant NameSutter Home Winery TCC
Utility NameREC SHW, LLC
LocationSan Luis Obispo County, CA
Initial Operation DateMay 2024
Last Update Dec 2025
Annual Generation 1.7 GWh
Annual Consumption 5.9 k MMBtu
Ranked #11,517 out of 13,301 Power Plants Nationwide
Ranked #6,308 out of 7,209 Solar Power Plants Nationwide
Ranked #1,457 out of 1,641 California Power Plants
Ranked #769 out of 917 California Solar Power Plants
Fuel Types Solar

Map of Sutter Home Winery TCC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sutter Home Winery TCC.

Create Your Account Today

Monthly Net Generation for Sutter Home Winery TCC

Monthly Plant Fuel Consumption for Sutter Home Winery TCC

Sutter Home Winery TCC Details

Summary Information
Plant NameSutter Home Winery TCC (68630)
Plant Address8998 N River Road, Paso Robles, CA 93446
UtilityREC SHW, LLC (67006)
Latitude, Longitude35.73561, -120.68527
Generation Dates on FileMay 2024 to Dec 2025
Initial Operation DateMay 2024
Annual Generation 1.7 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator SHTCC Details Operating May 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.1 MW
Summer Capacity1.1 MW
Winter Capacity1.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2024
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity1.2 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.4 MW
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity0.7 MW

Sutter Home Winery TCC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6298Clinton SolarGriswold, CT1.7 GWh
#6299BPU Solar FarmKansas City, KS1.7 GWh
#6300WMATA - Anacostia CSGWashington, DC1.7 GWh
#6301Medin 2 Community Solar LLC CSGCenter City, MN1.7 GWh
#6302Santa Rosa Junior College Petaluma SolarPetaluma, CA1.7 GWh
#6303FastSun 4 CSGHugo, MN1.7 GWh
#6304Epic VeronaVerona, WI1.8 GWh
#6305Niagara Bottling StocktonStockton, CA1.7 GWh
#6306Roberds Garden CSGFaribault, MN1.7 GWh
#6307Huneke CSG 1, LLCZumbrota, MN1.7 GWh
#6309Cannon Garden SolarFaribault, MN1.7 GWh
#6310Park StRutland, VT1.7 GWh
#6311Bishop Ranch - BR 1-YSan Ramon, CA1.7 GWh
#6312Sturbridge BarnCharlton, MA1.7 GWh
#6313Heinsohn Solar 1A, LLCKirkland, IL1.7 GWh
#6314Marion Solar 2Sandoval, IL1.7 GWh
#6315Hormel CSG SolarMontevideo, MN1.7 GWh
#6316Greenwood Solar FarmAvoca, MI1.7 GWh
#6317Falls Creek GardenFaribault, MN1.7 GWh
#6318Town of Norfolk MA at Medway BranchNorfolk, MA1.7 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Sutter Home Winery TCC.

Plant NamePlant LocationAnnual GenerationDistance
Aera San Ardo Cogen FacilitySan Ardo, CA19.6 GWh17.9 mi
Atascadero State HospitalAtascadero, CA2.8 GWh19 mi
Blackjack SolarKing City, CA9.0 GWh36.2 mi
CA Flats Solar 130, LLCShandon, CA258.0 GWh17.8 mi
CA Flats Solar 150, LLCShandon, CA279.0 GWh17.8 mi
CA-DGS RFP-Pleasant Valley State PrisonCoalinga, CA4.0 GWh36.5 mi
CA-DGS-California Men's ColonySan Luis Obispo, CA4.5 GWh28.3 mi
Camp San Luis ObispoSan Luis Obispo, CA2.4 GWh28.7 mi
CED AvenalAvenal, CA16.0 GWh34.9 mi
Coalinga 25D CogenCoalinga, CA38.9 GWh33.2 mi
Coalinga Cogeneration FacilityCoalinga, CA42.0 GWh35 mi
Firestone Walker Brewery - Phase 1Paso Robles, CA3.9 GWh9.7 mi
Meridian VineyardsPaso Robles, CA1.1 GWh8 mi
Nacimiento Hydro ProjectBradley, CA11.8 GWh11.9 mi
Paso Robles - Municipal AirportPaso Robles, CA7.6 GWh4.8 mi
Salinas River CogenerationSan Ardo, CA256.0 GWh18.1 mi
Sand Drag LLCAvenal, CA31.9 GWh36.4 mi
Stenner Creek SolarSan Luis Obispo, CA9.6 GWh28.7 mi
Sun City Project LLCAvenal, CA33.4 GWh36.5 mi
Vintner SolarTempleton, CA4.0 GWh12.3 mi