Tejon Castac Water District Solar
Laval Road, Arvin, CA 93203Plant Summary Information
Tejon Castac Water District Solar is ranked #535 out of 917 solar farms in California in terms of total annual net electricity generation.
Tejon Castac Water District Solar generated 617.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Tejon Castac Water District Solar |
|---|---|
| Utility Name | CTMW Solar, LLC |
| Location | Kern County, CA |
| Initial Operation Date | May 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 3.8 GWh |
| Annual Consumption | 13.7 k MMBtu |
| Ranked #9,147 out of 13,301 Power Plants Nationwide | |
| Ranked #4,259 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,172 out of 1,641 California Power Plants | |
| Ranked #535 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Tejon Castac Water District Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tejon Castac Water District Solar.
Monthly Net Generation for Tejon Castac Water District Solar
Monthly Plant Fuel Consumption for Tejon Castac Water District Solar
Tejon Castac Water District Solar Details
| Summary Information | |
|---|---|
| Plant Name | Tejon Castac Water District Solar (67365) |
| Plant Address | Laval Road, Arvin, CA 93203 |
| Utility | CTMW Solar, LLC (66065) |
| Latitude, Longitude | 35.0009, -118.8983 |
| Generation Dates on File | May 2024 to Dec 2025 |
| Initial Operation Date | May 2024 |
| Annual Generation | 3.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Water Supply and Irrigation Systems (22131) |
| Sector | Commercial Non-CHP (4) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 17180 Details Operating May 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 0.9 MW |
| Minimum Load | 1.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2024 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.3 MW |
| Virtual Net Metering Agreement | No |
Tejon Castac Water District Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4249 | Rounseville Solar | Rochester, MA | 3.8 GWh |
| #4250 | Adams Ave MS and HS | Egg Harbor Township, NJ | 3.8 GWh |
| #4251 | VA Sepulveda Ambulatory Care Center | North Hills, CA | 3.8 GWh |
| #4252 | Bloom Solar | Summerton, SC | 3.8 GWh |
| #4253 | Willis Solar | Pamplico, SC | 3.8 GWh |
| #4254 | USS Itasca Clean Energy Solar LLC | Grand Rapids, MN | 3.8 GWh |
| #4255 | Monee Solar 1, LLC | Peotone, IL | 3.8 GWh |
| #4256 | Blue Goose Solar CSG | Morrison, IL | 3.8 GWh |
| #4257 | Bullock Road Solar 1 | Freetown, MA | 3.8 GWh |
| #4258 | Univ of California San Diego Solar | La Jolla, CA | 3.8 GWh |
| #4260 | Mt Hope Solar | Molalla, OR | 3.8 GWh |
| #4261 | Grinnell College | Grinnell, IA | 3.8 GWh |
| #4262 | 205 Sturbridge A | Brimfield, MA | 3.8 GWh |
| #4263 | Clay FC | Louisville, IL | 3.8 GWh |
| #4264 | Abbot Solar | Manning, SC | 3.8 GWh |
| #4265 | Selective Insurance | Branchville, NJ | 3.8 GWh |
| #4266 | Scarlet Solar | La Grange, NC | 3.8 GWh |
| #4267 | Red Toad 1425 A Powatan Road, LLC | Clayton, NC | 3.8 GWh |
| #4268 | Big Boy | Gibsonville, NC | 3.8 GWh |
| #4269 | Broadway Road Solar, LLC | Sanford, NC | 3.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tejon Castac Water District Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABEC #4 dba CE&S Dairy | Bakersfield, CA | 7.4 GWh | 17.1 mi |
| ABEC Bidart-Old River LLC | Bakersfield, CA | 15.6 GWh | 16.5 mi |
| Adobe Solar | Arvin, CA | 36.4 GWh | 7.7 mi |
| Alamo | Pearblossom, CA | 65.7 GWh | 17.5 mi |
| Allied Potato | Bakersfield, CA | 309.9 MWh | 17.9 mi |
| AVI Bakersfield | Bakersfield, CA | 2.8 GWh | 5.5 mi |
| Blue Skies Solar, LLC | Arvin, CA | 2.0 GWh | 1.1 mi |
| CA-DGS-California Correctional Inst | Tehachapi, CA | 3.8 GWh | 20.2 mi |
| Cawelo Water District Solar | Famoso, CA | 6.9 GWh | 16.3 mi |
| Kern Oil & Refining Co | Bakersfield, CA | 36.3 GWh | 20.4 mi |
| Kern Sunset 1886-WD | Bakersfield, CA | 4.5 GWh | 15.2 mi |
| Orion Solar I | Arvin, CA | 27.4 GWh | 10.4 mi |
| Orion Solar II | Arvin, CA | 16.0 GWh | 10.4 mi |
| Pastoria Energy Facility, LLC | Lebec, CA | 3.3 TWh | 4.4 mi |
| Pastoria Solar | Lebec, CA | 61.3 GWh | 3.7 mi |
| RE Old River One, LLC | Bakersfield, CA | 37.5 GWh | 18.8 mi |
| Sandrini Solar 100 | Mettler, CA | 246.8 GWh | 14.3 mi |
| Sandrini Solar 200 | Mettler, CA | 500.0 GWh | 11.3 mi |
| Vulcan San Emidio Solar | Bakersfield, CA | 3.7 GWh | 16.3 mi |
| Wheeler Ridge 2 | Arvin, CA | 13.8 GWh | 1.3 mi |