Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| CFF Rice Mill Solar Plant | California Family Foods | Arbuckle, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 145.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Arrowleaf Solar and Storage | ORNI 30 LLC | Brawley, CA | Imperial Irrigation District (IID) | 38.8 GWh | Nov 2025 | May 2026 | Solar |
| SF Azalea, LLC | Idemitsu Renewables | Lost Hills, CA | California Independent System Operator (CISO) | 68.4 GWh | Nov 2025 | May 2026 | Solar |
| Bellefield Solar and Energy Storage Farm | 50LW 8me LLC | Mojave, CA | California Independent System Operator (CISO) | 381.8 GWh | Nov 2025 | May 2026 | Solar |
| Amazon - SAN5 | Onyx Asset Services Group | San Diego, CA | California Independent System Operator (CISO) | 530.0 MWh | Oct 2025 | Dec 2025 | Solar |
| BCE Seal Beach | BCE Seal Beach | Seal Beach, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2025 | Apr 2026 | Solar |
| Edwards Sanborn 1C | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 205.9 GWh | Oct 2025 | May 2026 | Solar |
| Tracy 18 - SLCVA418 | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 182.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Chatsworth Industrial Center 1-SLLAX601 | Prologis Logistics Services Incorporated | Chatsworth, CA | California Independent System Operator (CISO) | 132.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Sutter Home Winery Westside | REC SHW, LLC | Lodi, CA | California Independent System Operator (CISO) | 295.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Foster Clean Power A | Foster Clean Power A, LLC | Arcata, CA | California Independent System Operator (CISO) | 846.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Foster Clean Power B | Foster Clean Power B LLC | Arcata, CA | California Independent System Operator (CISO) | 901.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Rosamond South 1 | Golden Fields Solar IV, LLC | Rosamond, CA | California Independent System Operator (CISO) | 324.0 GWh | Jul 2025 | May 2026 | Solar |
| Luna Valley | Luna Valley Solar I, LLC | Mendota, CA | California Independent System Operator (CISO) | 266.8 GWh | Jul 2025 | May 2026 | Solar |
| CPA Wilmington 1 | Prologis Logistics Services Incorporated | Carson, CA | California Independent System Operator (CISO) | 1.1 GWh | Jul 2025 | Dec 2025 | Solar |
| CPA 2132 E Dominguez | Prologis Logistics Services Incorporated | Carson, CA | California Independent System Operator (CISO) | 913.0 MWh | Jul 2025 | Dec 2025 | Solar |
| Northern Orchard Solar PV, LLC | RWE Clean Energy | Taft, CA | California Independent System Operator (CISO) | 366.4 GWh | Jun 2025 | May 2026 | Solar |
| SloughHouse Solar, LLC | SloughHouse Solar, LLC | SloughHouse, CA | Balancing Authority of Northern California (BANC) | 97.9 GWh | Jun 2025 | May 2026 | Solar |
| Eland Solar & Storage Center, Phase 2 Hy | 69SV 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 512.9 GWh | Jun 2025 | May 2026 | Solar |
| Thermo Fisher Pleasanton | TotalEnergies Renewables USA LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.5 GWh | Jun 2025 | Dec 2025 | Solar |
| CA OXNARD 2600 Sakioka Dr | Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC | Oxnard, CA | California Independent System Operator (CISO) | 2.7 GWh | Jun 2025 | Dec 2025 | Solar |
| Visalia - (CA) | CleanCapital Holdings | Visalia, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2025 | Dec 2025 | Solar |
| Legoland CA Phase I | Onyx Asset Services Group | Carlsbad, CA | California Independent System Operator (CISO) | 1.4 GWh | May 2025 | Dec 2025 | Solar |
| Allied Potato | Renewable Solar, Inc | Bakersfield, CA | California Independent System Operator (CISO) | 309.9 MWh | Apr 2025 | Dec 2025 | Solar |
| Oaks HOA | Onyx Asset Services Group | Ione, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2025 | Dec 2025 | Solar |
| Pacific Aviation | Onyx Asset Services Group | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Mar 2025 | Dec 2025 | Solar |
| Rio Vista Solar | Rio Vista Executive Boat & RV Storage, LLC | Rio Vista, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2025 | Dec 2025 | Solar |
| CA- US Foods- Sacramento (McClellan) | USF McClellan, LLC | McClellan, CA | Balancing Authority of Northern California (BANC) | 1.4 GWh | Mar 2025 | Dec 2025 | Solar |
| Camino Solar Hybrid | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 133.1 GWh | Mar 2025 | May 2026 | Solar |
| Chaparral Springs | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 410.3 GWh | Mar 2025 | May 2026 | Solar |
| Dos Palos Clean Power | Dos Palos Clean Power LLC | Dos Palos, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2025 | Dec 2025 | Solar |
| Bishop Ranch - BR 15-DD | Alcosta Boulevard BR 15-DD Solar Project 2020, LLC | San Ramon, CA | California Independent System Operator (CISO) | 62.0 MWh | Feb 2025 | May 2025 | Solar |
| AM Wind Repower | AM Wind Repower LLC | Whitewater, CA | California Independent System Operator (CISO) | 76.5 GWh | Feb 2025 | May 2026 | Wind |
| Community Solar Utica 1, LLC | AETS OpCo Holdings LLC | Kettleman, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2025 | Dec 2025 | Solar |
| East Cleveland Road Solar | RPCA Solar 7, LLC | El Nido, CA | California Independent System Operator (CISO) | 5.9 GWh | Jan 2025 | Dec 2025 | Solar |
| Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 707.8 GWh | Jan 2025 | May 2026 | Solar |
| Central San | REC CSD, LLC | Martinez, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2024 | Dec 2025 | Solar |
| Tipton 1 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| RB Inyokern Solar WDAT 1203 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 58.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Tipton 2 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Kern Del Oro | REC KDO, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2024 | Dec 2025 | Solar |
| KP Ontario Vineyard Solar | KP Ontario Vineyard O.P. Surgicenter B Solar LLC | Ontario, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| PAC Aviation Solar | PAC Aviation | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1281 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 34.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2024 | Dec 2025 | Solar |
| City of Atwater NEM | SoCore Energy LLC | Atwater, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Scarlet II Hybrid | EDPR Scarlet II LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 387.0 GWh | Nov 2024 | May 2026 | Solar |
| Baldy Mesa 2_Silver Peak Hybrid | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 119.0 GWh | Nov 2024 | May 2026 | Solar |
| Kings CSG 3 LLC Community Solar | Dimension Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 855.4 GWh | Nov 2024 | May 2026 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 445.3 GWh | Nov 2024 | May 2026 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 254.0 GWh | Nov 2024 | May 2026 | Solar |
| Avenue 26 Solar | RPCA Solar 1, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 13.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Bishop Ranch - BR 8-P | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Enchanted Rock Lodi | Enchanted Rock | Lodi, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2024 | Dec 2025 | Natural Gas |
| West Tambo Clean Power II | West Tambo Clean Power II | Livingston, CA | California Independent System Operator (CISO) | 4.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Eland Solar & Storage Center, Phase 1 Hy | 68SF 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 717.3 GWh | Oct 2024 | May 2026 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2024 | Dec 2025 | Solar |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Pivot Energy PPA 22 | Pivot Energy | Visalia, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Tulare CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 6.4 GWh | Sep 2024 | Dec 2025 | Solar |
| Waterman Turnout Hydroelectric | San Bernardino Valley Mun. Water Dist. | San Bernardino, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2024 | Dec 2025 | Water |
| CA Manteca 730 Spreckels Ave | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC | Manteca, CA | California Independent System Operator (CISO) | 100.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Avalon Dairy | Renewable Solar, Inc | Wasco, CA | California Independent System Operator (CISO) | 792.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Superior Almond Hulling | Renewable Solar, Inc | Cantua Creek, CA | California Independent System Operator (CISO) | 472.0 MWh | Aug 2024 | Dec 2025 | Solar |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2024 | Dec 2025 | Solar |
| Blue Moon Farms | Bravo REC Management LLC | Tipton, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2024 | Dec 2025 | Solar |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 2.2 GWh | Jul 2024 | Dec 2025 | Solar |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2024 | Dec 2025 | Solar |
| IGS OXR1 | Greenbacker Renewable Energy Corporation | Oxnard, CA | California Independent System Operator (CISO) | 9.3 GWh | Jul 2024 | Dec 2025 | Solar |
| IPC 25 Solar | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 4.9 GWh | Jun 2024 | Dec 2025 | Solar |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 418.8 MWh | Jun 2024 | Dec 2025 | Solar |
| Dixie Creek Dairy Solar | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Jun 2024 | Dec 2025 | Solar |
| Open Sky Ranch Inc | Bravo REC Management LLC | Riverdale, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2024 | Dec 2025 | Solar |
| North Kern 2 | Madison Energy Investments LLC | City of Shafter, CA | California Independent System Operator (CISO) | 6.1 GWh | Jun 2024 | Dec 2025 | Solar |
| Costa View Farms | 127 CVF, LLC | Madera, CA | California Independent System Operator (CISO) | 5.1 GWh | May 2024 | Dec 2024 | Solar |
| River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 995.0 MWh | May 2024 | Dec 2025 | Solar |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| Mesa Wind Repower | Mesa Wind Repower | Whitewater, CA | California Independent System Operator (CISO) | 80.1 GWh | May 2024 | Dec 2024 | Wind |
| Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 47.5 GWh | May 2024 | May 2026 | Solar |
| Fresno Community Solar | Agilitas Energy, Inc. | Fresno, CA | California Independent System Operator (CISO) | 16.9 GWh | May 2024 | Dec 2025 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 482.6 GWh | May 2024 | May 2026 | Solar |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2024 | Dec 2024 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 361.7 GWh | Apr 2024 | May 2026 | Solar |
| Enchanted Rock Turlock Irrigation Distri | Enchanted Rock | Patterson, CA | Turlock Irrigation District (TIDC) | 2.5 GWh | Apr 2024 | Dec 2025 | Natural Gas |
| Baldy Mesa Solar & Storage | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 313.3 GWh | Apr 2024 | May 2026 | Solar |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 295.0 GWh | Apr 2024 | May 2026 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2024 | Dec 2025 | Solar |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 651.0 MWh | Mar 2024 | Dec 2025 | Solar |
| ERock MID Claribel Generation Station | Enchanted Rock | Modesto, CA | Balancing Authority of Northern California (BANC) | 3.4 GWh | Mar 2024 | Dec 2025 | Natural Gas |
| CA Jurupa Valley 3251 De Forest Circle | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 8.5 GWh | Mar 2024 | Dec 2025 | Solar |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 464.5 GWh | Mar 2024 | May 2026 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2024 | Dec 2024 | Solar |
| Visalia CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 7.7 GWh | Feb 2024 | Dec 2025 | Solar |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2024 | Dec 2024 | Solar |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 740.4 GWh | Feb 2024 | May 2026 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 568.8 GWh | Feb 2024 | May 2026 | Solar |
| CA-DGS- RFP-Correctional Training Fac | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2024 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |