Edwards Sanborn 1C
1167 Purdy Ave, Mojave, CA 93501Plant Summary Information
Edwards Sanborn 1C is ranked #97 out of 885 solar farms in California in terms of total annual net electricity generation.
Edwards Sanborn 1C generated 124.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Edwards Sanborn 1C |
|---|---|
| Utility Name | Terra-Gen Operating Co-Hybrid |
| Location | Kern County, CA |
| Initial Operation Date | November 2025 |
| Last Update | May 2026 |
| Annual Generation | 205.9 GWh |
| Annual Consumption | 702.6 k MMBtu |
| Ranked #2,497 out of 13,081 Power Plants Nationwide | |
| Ranked #458 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #256 out of 1,606 California Power Plants | |
| Ranked #97 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Edwards Sanborn 1C
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Edwards Sanborn 1C.
Monthly Net Generation for Edwards Sanborn 1C
Monthly Plant Fuel Consumption for Edwards Sanborn 1C
Edwards Sanborn 1C Details
| Summary Information | |
|---|---|
| Plant Name | Edwards Sanborn 1C (68846) |
| Plant Address | 1167 Purdy Ave, Mojave, CA 93501 |
| Utility | Terra-Gen Operating Co-Hybrid (64366) |
| Latitude, Longitude | 35.02618, -118.15292 |
| Generation Dates on File | Nov 2025 to May 2026 |
| Initial Operation Date | November 2025 |
| Annual Generation | 205.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator S5 Details Operating November 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | PHSP15 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | PHSP15 |
| Nameplate Capacity | 46 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 46 MW |
|---|---|
| Winter Capacity | 46 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 57.5 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator S6 Details Operating November 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | PHSP15 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | PHSP15 |
| Nameplate Capacity | 102 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 102 MW |
|---|---|
| Winter Capacity | 102 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 127.6 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Edwards Sanborn 1C Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| EdSan 1C Solar, LLC | 437 Madison Ave, Fl 22, New York, NY 10022 | Generator S5 | 100.00% |
| EdSan 1C Solar, LLC | 437 Madison Ave, Fl 22, New York, NY 10022 | Generator S6 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #448 | Alamo 6 | Fort Stockton, TX | 211.6 GWh |
| #449 | Coniglio Solar | Wolfe City, TX | 211.1 GWh |
| #450 | Sigurd Solar LLC | Sigurd, UT | 210.4 GWh |
| #451 | Yuma Solar + Storage | Fortuna Foothills, AZ | 201.3 GWh |
| #452 | BPL Sol Solar LLC | Chilton, TX | 208.9 GWh |
| #453 | Waverly Solar, LLC | Waverly, VA | 208.4 GWh |
| #454 | Utah Red Hills Renewable Energy Park | Parowan, UT | 207.9 GWh |
| #455 | Amite Solar, LLC | Roseland, LA | 207.8 GWh |
| #456 | Crossett Solar | Crossett, AR | 207.0 GWh |
| #457 | Springfield Solar (WI) | Lomira, WI | 206.2 GWh |
| #459 | Walnut Bend Solar Station PV | Moro, AR | 205.5 GWh |
| #460 | Holliday Creek Solar | Fort Dodge, IA | 204.8 GWh |
| #461 | Ivanpah 3 | Nipton, CA | 211.3 GWh |
| #462 | Maplewood Solar | Climax, VA | 203.0 GWh |
| #463 | Solverde 1 | Lancaster, CA | 202.9 GWh |
| #464 | Robins Air Force Base Solar | Macon, GA | 200.8 GWh |
| #465 | Appaloosa Solar I | Cedar City, UT | 200.8 GWh |
| #466 | Badger Hollow I | Montfort, WI | 200.7 GWh |
| #467 | Optimist | West Point, MS | 198.2 GWh |
| #468 | Wildflower Solar, LLC (MS) | DeSoto, MS | 199.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Edwards Sanborn 1C.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind Energy Center IV | Mojave, CA | 167.5 GWh | 5.2 mi |
| Alta Wind Energy Center V | Mojave, CA | 253.7 GWh | 5.2 mi |
| Alta Wind VIII | Mojave, CA | 219.2 GWh | 4.6 mi |
| Alta Wind X | Mojave, CA | 361.1 GWh | 3.5 mi |
| Bellefield Solar and Energy Storage Farm | Mojave, CA | 381.8 GWh | 4.5 mi |
| Brookfield Tehachapi 1 | Mojave, CA | 164.5 GWh | 5.2 mi |
| Difwind Farms Ltd VI | Mojave, CA | 12.6 GWh | 2 mi |
| Edwards Sanborn E1A | Mojave, CA | 317.5 GWh | 4.7 mi |
| Edwards Sanborn E1B | Mojave, CA | 354.4 GWh | 5.4 mi |
| Edwards Sanborn S1 | Mojave, CA | 97.6 GWh | 1.1 mi |
| Edwards Sanborn S3 | Mojave, CA | 81.1 GWh | 1.8 mi |
| Edwards Sanborn S4 | Mojave, CA | 93.0 GWh | 2.1 mi |
| Pinyon Pine I | Mojave, CA | 283.1 GWh | 3.5 mi |
| Pinyon Pine II | Mojave, CA | 204.3 GWh | 4 mi |
| RE Camelot LLC | Mojave, CA | 121.0 GWh | 1.8 mi |
| RE Columbia 3 LLC | Mojave, CA | 23.1 GWh | 0.6 mi |
| RE Columbia Two, LLC | Mojave, CA | 41.5 GWh | 1.8 mi |
| RE Rio Grande Solar LLC | Mojave, CA | 10.3 GWh | 1.5 mi |
| Rising Tree Wind Farm | Mojave, CA | 250.4 GWh | 5.1 mi |
| Rising Tree Wind Farm II | Mojave, CA | 53.7 GWh | 5.3 mi |