| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.6 GWh | Jul 2022 | Dec 2025 | Wind |
| Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 329.2 GWh | Jul 2022 | Aug 2026 | Solar |
| Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 311.8 GWh | Jul 2022 | Aug 2026 | Solar |
| Wister Solar | Wister Solar | Niland, CA | Imperial Irrigation District (IID) | 33.0 GWh | Jun 2022 | Dec 2025 | Solar |
| 20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 2.8 GWh | Jun 2022 | Dec 2025 | Solar |
| CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 236.3 GWh | Jun 2022 | Dec 2025 | Geothermal |
| Abel Road Bioenergy | ACC Renewable Resources | Williams, CA | California Independent System Operator (CISO) | 22.7 GWh | Jun 2022 | Dec 2025 | Agricultural By-Products |
| Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 670.5 GWh | May 2022 | Aug 2026 | Solar |
| AVI Bakersfield | Anthony Vineyards, Inc. | Bakersfield, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2022 | Dec 2025 | Solar |
| Dover Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2022 | Dec 2025 | Solar |
| Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2022 | Dec 2025 | Solar |
| EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 10.6 GWh | Apr 2022 | Dec 2025 | Solar |
| Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 7.3 GWh | Apr 2022 | Dec 2025 | Solar |
| University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.4 GWh | Apr 2022 | Dec 2025 | Solar |
| West Village Solar - Array 2 Community S | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 619.0 MWh | Apr 2022 | Dec 2025 | Solar |
| West Village Solar - Array 1Community So | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 746.0 MWh | Apr 2022 | Dec 2025 | Solar |
| Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 138.1 GWh | Mar 2022 | Aug 2026 | Solar |
| Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 624.2 GWh | Feb 2022 | Aug 2026 | Solar |
| Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 80.0 GWh | Feb 2022 | Aug 2026 | Solar |
| Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 94.0 GWh | Feb 2022 | Aug 2026 | Solar |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 524.0 MWh | Feb 2022 | Dec 2025 | Solar |
| IGS KSBD | Altus Power America Management, LLC | Highland, CA | California Independent System Operator (CISO) | 9.1 GWh | Feb 2022 | Dec 2025 | Solar |
| Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2022 | Dec 2025 | Solar |
| Sierra Pacific Chinese Camp | Sierra Pacific Industries | Chinese Camp, CA | California Independent System Operator (CISO) | 4.5 GWh | Feb 2022 | Dec 2025 | Solar |
| CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 6.8 GWh | Feb 2022 | Dec 2025 | Solar |
| Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2022 | Dec 2025 | Solar |
| Bishop Ranch BR 1-X | Bollinger Canyon Road BR 1-X Solar Project 2020 | San Ramon, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2022 | Dec 2025 | Solar |
| BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 322.4 GWh | Jan 2022 | Aug 2026 | Solar |
| 8500 Balboa PV, LLC | 8500 Balboa PV, LLC | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 3.3 GWh | Jan 2022 | Dec 2025 | Solar |
| Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
| Blue Skies Solar, LLC | Headwater Energy, LLC | Arvin, CA | PacifiCorp West (PACW) | 2.0 GWh | Nov 2021 | Dec 2024 | Solar |
| 20333 Normandie PV, LLC | TRITEC Americas | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 289.4 GWh | Nov 2021 | Aug 2026 | Solar |
| Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 57.7 GWh | Nov 2021 | Aug 2026 | Solar |
| Deer Creek 2 | Altus Power America Management, LLC | Shingle Springs, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2021 | Dec 2025 | Solar |
| POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2021 | Dec 2025 | Solar |
| Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 286.3 GWh | Nov 2021 | Aug 2026 | Solar |
| Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 952.0 MWh | Nov 2021 | Dec 2025 | Solar |
| California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2021 | Dec 2025 | Solar |
| CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2025 | Solar |
| SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 509.8 GWh | Nov 2021 | Aug 2026 | Solar |
| POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 5.1 GWh | Nov 2021 | Dec 2025 | Solar |
| BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2021 | Dec 2025 | Solar |
| Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 396.7 GWh | Nov 2021 | Aug 2026 | Solar |
| Niagara Bottling - Rialto | SkyHigh 2 Solar | Rialto, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Canal Energy S23, LLC | Canal Energy S23, LLC | Hanford, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2021 | Dec 2025 | Solar |
| Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 8.0 GWh | Oct 2021 | Dec 2025 | Solar |
| Lerdo Detention Facility - Solar 2, 3 | County of Kern - (CA) | Bakersfield, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2021 | Dec 2025 | Solar |
| Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 227.9 GWh | Oct 2021 | Aug 2026 | Solar |
| Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 685.5 GWh | Oct 2021 | Aug 2026 | Solar |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.1 GWh | Sep 2021 | Dec 2025 | Solar |
| Amazon PSP1 | Greenbacker Renewable Energy Corporation | Beaumont, CA | California Independent System Operator (CISO) | 7.4 GWh | Sep 2021 | Dec 2025 | Solar |
| Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 11.5 GWh | Sep 2021 | Dec 2025 | Other Biomass Gas |
| Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2025 | Solar |
| Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 6.9 GWh | Aug 2021 | Dec 2025 | Natural Gas |
| Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 41.4 GWh | Aug 2021 | Dec 2025 | Solar |
| Danell Bros Inc | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Vallecitos Water District | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2021 | Dec 2025 | Solar |
| ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2021 | Dec 2025 | Solar |
| Aquamarine | Aqua | Lemoore, CA | California Independent System Operator (CISO) | 636.9 GWh | Aug 2021 | Aug 2026 | Solar |
| Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.4 GWh | Aug 2021 | Dec 2025 | Solar |
| Wonderful Huller & Shelling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 3.7 GWh | Jul 2021 | Dec 2025 | Solar |
| Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2021 | Dec 2025 | Solar |
| Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 13.2 GWh | Jul 2021 | Dec 2025 | Solar |
| Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.3 GWh | Jun 2021 | Dec 2025 | Solar |
| EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2021 | Dec 2025 | Solar |
| EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2025 | Solar |
| EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2021 | Dec 2025 | Solar |
| EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 8.2 GWh | Jun 2021 | Dec 2025 | Solar |
| Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 175.5 GWh | Jun 2021 | Aug 2026 | Wind |
| Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 2.5 GWh | Jun 2021 | Dec 2025 | Solar |
| POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2025 | Solar |
| POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2021 | Dec 2025 | Solar |
| Wonderful Nursery | Wonderful Renewable Energy, LLC. | Wasco, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2021 | Dec 2025 | Solar |
| San Manuel Central Plant Cogens | Yuhaaviatam of San Manuel Nation | Highland, CA | California Independent System Operator (CISO) | 18.0 GWh | May 2021 | Dec 2025 | Natural Gas |
| Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 8.6 GWh | May 2021 | Dec 2025 | Natural Gas |
| SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 8.1 GWh | May 2021 | Dec 2025 | Other Biomass Gas : 79.3% Natural Gas : 20.7% |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.2 GWh | May 2021 | Dec 2025 | Solar |
| Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 14.5 GWh | May 2021 | Dec 2025 | Natural Gas |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | May 2021 | Dec 2025 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara - (CA) | Goleta, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2021 | Dec 2025 | Other Biomass Gas |
| Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2021 | Dec 2025 | Solar |
| Five H Farms Solar Array | Maas Energy Works | Merced, CA | California Independent System Operator (CISO) | 2.2 GWh | Mar 2021 | Dec 2025 | Solar |
| Prairie | Altus Power America Management, LLC | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Mar 2021 | Dec 2025 | Solar |
| El Dorado Solar, LLC | Altus Power America Management, LLC | El Dorado Hills, CA | California Independent System Operator (CISO) | 3.3 GWh | Mar 2021 | Dec 2025 | Solar |
| Rancho Cordova Medical Offices | KP Rancho Cordova Medical Offices Solar, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 2.0 GWh | Mar 2021 | Dec 2025 | Solar |
| Gilead Foster City Solar Project | Gilead Sciences Inc. Foster City | Foster City, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2021 | Dec 2025 | Solar |
| Valencia 3 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 4.2 GWh | Mar 2021 | Dec 2025 | Solar |
| San Diego - EMDF at San Diego | California PV Energy 3, LLC | San Diego, CA | California Independent System Operator (CISO) | 4.9 GWh | Mar 2021 | Dec 2025 | Solar |
| Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 49.3 GWh | Mar 2021 | Dec 2025 | Wind |
| Palm Springs DAC PV | Palm Springs USD | Palm Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2021 | Dec 2025 | Solar |
| El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 2021 | Dec 2025 | Solar |
| Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 202.1 GWh | Feb 2021 | Aug 2026 | Wind |
| Google Moffett Park Solar Project | Google, Inc. | Sunnyvale, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2021 | Dec 2025 | Solar |
| San Diego - NCRC at Vista | California PV Energy 3, LLC | Vista, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2021 | Dec 2025 | Solar |
| Silveira Ranch Road Solar | Silveira Ranch Road Solar | Novato, CA | California Independent System Operator (CISO) | 5.2 GWh | Feb 2021 | Dec 2025 | Solar |
| Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 213.1 GWh | Feb 2021 | Aug 2026 | Wind |
| DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.7 GWh | Jan 2021 | Dec 2025 | Solar |
| Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 71.7 GWh | Jan 2021 | Aug 2026 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 28.8 GWh |
| Tehama County, CA | # 51 | 7 | 45.8 GWh |
| Napa County, CA | # 50 | 11 | 51.2 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.7 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 80.3 GWh |
| San Mateo County, CA | # 46 | 11 | 133.1 GWh |
| Yolo County, CA | # 45 | 15 | 196.6 GWh |
| Nevada County, CA | # 44 | 12 | 225.7 GWh |
| San Benito County, CA | # 43 | 6 | 266.2 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 292.9 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 450.0 GWh |
| Trinity County, CA | # 38 | 5 | 480.6 GWh |
| Merced County, CA | # 37 | 33 | 493.1 GWh |
| Calaveras County, CA | # 36 | 6 | 524.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 608.6 GWh |
| Ventura County, CA | # 33 | 33 | 719.4 GWh |
| Lake County, CA | # 32 | 10 | 892.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 53 | 1.6 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.8 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Orange County, CA | # 21 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.7 TWh |
| Alameda County, CA | # 19 | 52 | 2.8 TWh |
| Tuolumne County, CA | # 18 | 23 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.0 TWh |
| Solano County, CA | # 16 | 41 | 3.0 TWh |
| Santa Clara County, CA | # 15 | 76 | 3.4 TWh |
| Butte County, CA | # 14 | 25 | 3.5 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.0 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.0 TWh |
| Fresno County, CA | # 8 | 128 | 7.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.8 TWh |
| Contra Costa County, CA | # 5 | 59 | 11.8 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Los Angeles County, CA | # 3 | 325 | 17.3 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 333 | 35.3 TWh |