Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
| US GSA - Sacramento | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.0 GWh | Feb 2018 | Dec 2024 | Solar |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 52.6 GWh | Feb 2018 | Dec 2024 | Solar |
| Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2018 | Dec 2024 | Solar |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.9 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| Midway Solar Farm 1 | 83WI 8ME, LLC | Calipatria, CA | Imperial Irrigation District (IID) | 107.9 GWh | Dec 2017 | Sep 2025 | Solar |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2017 | Dec 2024 | Solar |
| Niagara Bottling Stockton | ClearGen LLC | Stockton, CA | California Independent System Operator (CISO) | 870.0 MWh | Dec 2017 | Dec 2024 | Solar |
| EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.6 GWh | Dec 2017 | Dec 2024 | Natural Gas |
| Panoche Valley Solar Farm | Consolidated Edison Development Inc. | Paicines, CA | California Independent System Operator (CISO) | 285.9 GWh | Dec 2017 | Sep 2025 | Solar |
| Tule Wind LLC | Avangrid Power LLC | Boulevard, CA | California Independent System Operator (CISO) | 351.7 GWh | Nov 2017 | Sep 2025 | Wind |
| Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 90.4 GWh | Nov 2017 | Sep 2025 | Solar |
| Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 113.9 GWh | Nov 2017 | Sep 2025 | Solar |
| Great Valley Solar Portfolio Holdings, L | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 522.3 GWh | Nov 2017 | Sep 2025 | Solar |
| Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 21.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2017 | Dec 2024 | Wind |
| Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 963.0 MWh | Nov 2017 | Dec 2024 | Solar |
| Bakersfield PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 5.2 GWh | Nov 2017 | Dec 2024 | Solar |
| Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2017 | Dec 2024 | Solar |
| Sacramento Regional County Sanitation PV | Tesla Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 7.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.7 GWh | Nov 2017 | Dec 2024 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2024 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.3 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2024 | Solar |
| CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 262.5 GWh | Oct 2017 | Sep 2025 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 57.5 GWh | Oct 2017 | Sep 2025 | Solar |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 149.2 GWh | Oct 2017 | Sep 2025 | Wind |
| Westmont 301 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Oct 2017 | Dec 2024 | Solar |
| Westmont 401 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 4.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 75.4 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 228.2 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 13.4 GWh | Sep 2017 | Dec 2024 | Solar |
| Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 21.3 GWh | Aug 2017 | Dec 2024 | Solar |
| Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Solar |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2017 | Dec 2024 | Wind |
| Valencia 1 Solar CA | Altus Power America Management, LLC | Westmorland, CA | Imperial Irrigation District (IID) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 6.1 GWh | Aug 2017 | Dec 2024 | Solar |
| Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 18.1 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.3 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
| Dept of General Services -FTB | California PV Energy 2, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 5.1 GWh | Jun 2017 | Dec 2024 | Solar |
| Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 48.3 GWh | Jun 2017 | Dec 2024 | Solar |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.1 GWh | Jun 2017 | Dec 2024 | Solar |
| Westmont 400A | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.3 GWh | Jun 2017 | Dec 2024 | Solar |
| Westmont 400B | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.6 GWh | Jun 2017 | Dec 2024 | Solar |
| ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.6 GWh | Jun 2017 | Dec 2024 | Natural Gas |
| Preferred Freezer San Leandro | Powerflex | San Leandro, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2017 | Dec 2023 | Solar |
| Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 17.4 GWh | May 2017 | Dec 2024 | Solar |
| Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 19.3 GWh | May 2017 | Dec 2024 | Solar |
| Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 29.6 GWh | May 2017 | Dec 2024 | Landfill Gas |
| PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2017 | Dec 2024 | Solar |
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 37.6 GWh | May 2017 | Dec 2024 | Natural Gas |
| Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 13.1 GWh | Apr 2017 | Dec 2024 | Landfill Gas |
| Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 34.2 GWh | Apr 2017 | Sep 2025 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| Amazon - Patterson PV | AES Distributed Energy | Patterson, CA | Balancing Authority of Northern California (BANC) | 4.8 GWh | Apr 2017 | Dec 2024 | Solar |
| APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 27.1 GWh | Apr 2017 | Dec 2023 | Natural Gas |
| Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 130.7 GWh | Mar 2017 | Sep 2025 | Solar |
| Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.5 GWh | Mar 2017 | Dec 2024 | Solar |
| Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 38.1 GWh | Mar 2017 | Dec 2024 | Solar |
| Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 149.0 GWh | Mar 2017 | Sep 2025 | Other Biomass Gas : 67.8% Natural Gas : 32.2% |
| Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2017 | Dec 2024 | Solar |
| ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 8.0 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 11.2 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| Maclay Solar Project | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Mar 2017 | Dec 2024 | Solar |
| Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 44.4 GWh | Feb 2017 | Dec 2024 | Solar |
| NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 40.6 GWh | Feb 2017 | Dec 2024 | Solar |
| Westmont 300A | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Feb 2017 | Dec 2024 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Feb 2017 | Dec 2024 | Solar |
| Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 8.5 GWh | Feb 2017 | Dec 2024 | Natural Gas |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Jan 2017 | Dec 2024 | Solar |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 25.3 GWh | Jan 2017 | Dec 2024 | Solar |
| Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2017 | Dec 2024 | Solar |
| Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 6.6 GWh | Jan 2017 | Dec 2024 | Solar |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Jan 2017 | Dec 2024 | Natural Gas |
| Wildwood Solar II | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 38.5 GWh | Dec 2016 | Dec 2024 | Solar |
| Oro Loma | Consolidated Edison Development Inc. | Oro Loma, CA | California Independent System Operator (CISO) | 25.5 GWh | Dec 2016 | Dec 2024 | Solar |
| CED Avenal | Consolidated Edison Development Inc. | Avenal, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2016 | Dec 2024 | Solar |
| Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 14.8 GWh | Dec 2016 | Dec 2024 | Solar |
| CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2024 | Solar |
| Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 21.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 52.3 GWh | Nov 2016 | Dec 2024 | Solar |
| Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 50.8 GWh | Nov 2016 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |