Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 8.0 GWh | Nov 2018 | Dec 2025 | Solar |
| County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2025 | Solar |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2018 | Dec 2025 | Solar |
| Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2025 | Solar |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Mar 2025 | Solar |
| Xebec 1 | AES Distributed Energy | Sun Valley, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Nov 2018 | Dec 2025 | Solar |
| Francisco St. Solar | AES Distributed Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Nov 2018 | Dec 2025 | Solar |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 465.0 MWh | Nov 2018 | Dec 2025 | Solar |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.4 GWh | Nov 2018 | Dec 2025 | Natural Gas |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.9 GWh | Nov 2018 | Dec 2025 | Solar |
| SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2018 | Dec 2024 | Solar |
| SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 12.3 GWh | Nov 2018 | Dec 2025 | Natural Gas |
| Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2018 | Dec 2025 | Solar |
| Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 638.8 GWh | Oct 2018 | May 2026 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2018 | Dec 2025 | Solar |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2018 | Dec 2024 | Solar |
| Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.0 GWh | Sep 2018 | Dec 2025 | Solar |
| Midway Solar Farm III | Greenbacker Renewable Energy Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 40.4 GWh | Aug 2018 | Dec 2025 | Solar |
| Guadalupe Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2018 | Dec 2025 | Solar |
| PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2018 | Dec 2025 | Solar |
| AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 17.4 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 31.2 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 19.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2018 | Dec 2025 | Solar |
| Keysight - Santa Rosa | Bloom Energy | Santa Rosa, CA | California Independent System Operator (CISO) | 34.5 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Aug 2018 | Dec 2024 | Solar |
| Green Beanworks C PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 8.3 GWh | Jul 2018 | Dec 2025 | Solar |
| Green Beanworks D PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2018 | Dec 2025 | Solar |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.7 GWh | Jul 2018 | Dec 2025 | Wind |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.9 GWh | Jul 2018 | Dec 2025 | Wind |
| Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2018 | Dec 2025 | Solar |
| Prologis L.P | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 5.9 GWh | Jul 2018 | Dec 2025 | Solar |
| Las Positas College | Chabot Las Positas Community College District | Livermore, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2018 | Dec 2025 | Solar |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 24.8 GWh | Jun 2018 | Dec 2025 | Natural Gas |
| California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2018 | Dec 2025 | Solar |
| RPUWD Scheuer Well Solar Project | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2018 | Dec 2025 | Solar |
| San Joaquin Solar | GASNA 6P, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 22.4 GWh | Apr 2018 | Dec 2025 | Solar |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.6 GWh | Apr 2018 | Dec 2025 | Solar |
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2018 | Dec 2025 | Solar |
| Central CA Fuel Cell 1, LLC | Cordia | Tulare, CA | California Independent System Operator (CISO) | 13.2 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 12.5 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 6.0 GWh | Mar 2018 | Dec 2025 | Solar |
| Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2025 | Solar |
| Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2018 | Dec 2025 | Solar |
| Medline Ind. Phase 2 Tracy | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Aug 2025 | Solar |
| KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 16.4 GWh | Mar 2018 | Dec 2025 | Natural Gas |
| Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2018 | Dec 2025 | Solar |
| Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2025 | Solar |
| US GSA - Sacramento | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Feb 2018 | Dec 2025 | Solar |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 55.6 GWh | Feb 2018 | Dec 2025 | Solar |
| Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2018 | Dec 2025 | Solar |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.1 GWh | Jan 2018 | Dec 2025 | Other Biomass Gas |
| ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 5.5 GWh | Jan 2018 | Dec 2025 | Other Biomass Gas |
| ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.4 GWh | Jan 2018 | Dec 2025 | Other Biomass Gas |
| Midway Solar Farm 1 | 83WI 8ME, LLC | Calipatria, CA | Imperial Irrigation District (IID) | 100.6 GWh | Dec 2017 | May 2026 | Solar |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2017 | Dec 2025 | Solar |
| Niagara Bottling Stockton | ClearGen LLC | Stockton, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2017 | Dec 2025 | Solar |
| EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 31.1 GWh | Dec 2017 | Dec 2025 | Natural Gas |
| Panoche Valley Solar Farm | RWE Clean Energy | Paicines, CA | California Independent System Operator (CISO) | 239.9 GWh | Dec 2017 | May 2026 | Solar |
| Tule Wind LLC | Avangrid Power LLC | Boulevard, CA | California Independent System Operator (CISO) | 338.8 GWh | Nov 2017 | May 2026 | Wind |
| Beacon Solar Plant Site 5 | Sune Beacon Site 5, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 84.8 GWh | Nov 2017 | May 2026 | Solar |
| Beacon Solar Plant Site 2 | Sune Beacon Site 2, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 107.0 GWh | Nov 2017 | May 2026 | Solar |
| Great Valley Solar Portfolio Holdings, L | RWE Clean Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 491.5 GWh | Nov 2017 | May 2026 | Solar |
| Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.7 GWh | Nov 2017 | Dec 2025 | Solar |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 44.4 GWh | Nov 2017 | Dec 2025 | Solar |
| Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 18.9 GWh | Nov 2017 | Dec 2025 | Solar |
| Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 21.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2017 | Dec 2025 | Wind |
| Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 892.0 MWh | Nov 2017 | Dec 2025 | Solar |
| Bakersfield PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 5.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2017 | Oct 2025 | Solar |
| Sacramento Regional County Sanitation PV | Tesla Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 7.4 GWh | Nov 2017 | Dec 2025 | Solar |
| Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.5 GWh | Nov 2017 | Dec 2025 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2017 | Dec 2025 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 7.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.7 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 36.3 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.8 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2017 | Dec 2025 | Solar |
| Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2025 | Solar |
| CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 255.2 GWh | Oct 2017 | May 2026 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 59.3 GWh | Oct 2017 | May 2026 | Solar |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 129.6 GWh | Oct 2017 | May 2026 | Wind |
| Westmont 301 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Oct 2017 | Dec 2025 | Solar |
| Westmont 401 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 4.6 GWh | Oct 2017 | Dec 2025 | Solar |
| Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 75.7 GWh | Oct 2017 | Dec 2025 | Natural Gas |
| Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 211.3 GWh | Oct 2017 | Dec 2025 | Natural Gas |
| SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 14.2 GWh | Sep 2017 | Dec 2025 | Solar |
| Malech Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.6 GWh | Sep 2017 | Dec 2025 | Solar |
| Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 21.1 GWh | Aug 2017 | Dec 2025 | Solar |
| Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.0 GWh | Aug 2017 | Dec 2025 | Solar |
| SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |