Foster Clean Power B
2428 Foster Ave, Arcata, CA 95521Plant Summary Information
Foster Clean Power B is ranked #842 out of 885 solar farms in California in terms of total annual net electricity generation.
Foster Clean Power B generated 650.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Foster Clean Power B |
|---|---|
| Utility Name | Foster Clean Power B LLC |
| Location | Humboldt County, CA |
| Initial Operation Date | September 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 901.0 MWh |
| Annual Consumption | 3.1 k MMBtu |
| Ranked #12,044 out of 13,081 Power Plants Nationwide | |
| Ranked #6,741 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,544 out of 1,606 California Power Plants | |
| Ranked #842 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Foster Clean Power B, LLC (2023 to 2024) Foster Clean Power B LLC (2025 to 2025) |
Map of Foster Clean Power B
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Foster Clean Power B.
Monthly Net Generation for Foster Clean Power B
Monthly Plant Fuel Consumption for Foster Clean Power B
Foster Clean Power B Details
| Summary Information | |
|---|---|
| Plant Name | Foster Clean Power B (67859) |
| Plant Address | 2428 Foster Ave, Arcata, CA 95521 |
| Utility | Foster Clean Power B LLC (67319) |
| Latitude, Longitude | 40.8823, -124.10119 |
| Generation Dates on File | Sep 2025 to Dec 2025 |
| Initial Operation Date | September 2025 |
| Annual Generation | 901.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | Yes |
Generator BESSB Details Operating September 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 5.4 |
|---|---|
| Maximum Charge Rate | 1.2 MW |
| Maximum Discharge Rate | 1.2 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 1.4 |
| Storage Enclosure Type | CS |
| Load Following | Yes |
| Excess Wind And Solar Generation | P |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 67859 |
| Direct Support Gen Id | FOSTB |
| Support T D Asset | No |
Generator FOSTB Details Operating September 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4 MW |
| Summer Capacity | 4 MW |
| Winter Capacity | 4 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 195 |
| Tilt Angle | 52 |
| DC Net Capacity | 4.9 MW |
| Other Materials | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Foster Clean Power B Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6731 | Novel Swenson Solar LLC CSG | North Branch, MN | 922.0 MWh |
| #6732 | McKee City Solar Phase 2 | Egg Harbor Township, NJ | 922.0 MWh |
| #6733 | Western Branch High School | Chesapeake, VA | 921.0 MWh |
| #6734 | 3100 Valleyview Drive | Columbus, OH | 916.0 MWh |
| #6735 | Cedarville CSG | Plymouth, MA | 914.0 MWh |
| #6736 | CPA 2132 E Dominguez | Carson, CA | 913.0 MWh |
| #6737 | Franklin CSG 1 | Franklin, MN | 913.0 MWh |
| #6738 | Rockville Solar II, LLC | Indianapolis, IN | 912.0 MWh |
| #6739 | Samuel Mickle School | Mickleton, NJ | 912.0 MWh |
| #6740 | Princeton Solar | Princeton, IL | 903.9 MWh |
| #6742 | Kelso Community Solar II | Essex, MD | 901.0 MWh |
| #6743 | FFP - NY Game Farm CSG | Dexter, NY | 901.0 MWh |
| #6744 | PCIP Solar | Timberlake, NC | 898.0 MWh |
| #6745 | Atlanta Falcons Solar | Atlanta, GA | 896.0 MWh |
| #6746 | Delano Land 1 | Delano, CA | 892.0 MWh |
| #6747 | Stockbridge | Munnsville, NY | 892.0 MWh |
| #6748 | Oneida East | Holland Patent, NY | 891.0 MWh |
| #6749 | Hamlet Solar Energy Storage | Hamlet, NC | 867.0 MWh |
| #6750 | HCE Moore I | Aberdeen, NC | 886.0 MWh |
| #6751 | IMPA Richmond Solar Park | Richmond, IN | 884.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Foster Clean Power B.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Baker Creek Hydroelectric | Bridgeville, CA | 2.6 GWh | 31.5 mi |
| Big Creek Water Works | Hyampom, CA | 5.5 GWh | 35.5 mi |
| Box Canyon Dam | Mount Shasta, CA | 22.5 GWh | 96.3 mi |
| Foster Clean Power A | Arcata, CA | 846.0 MWh | 0 mi |
| Gosselin Hydro Plant | Ruth, CA | 4.6 GWh | 49.7 mi |
| Humboldt Bay | Eureka, CA | 320.0 GWh | 11.3 mi |
| Humboldt Sawmill Company | Scotia, CA | 118.0 GWh | 28.3 mi |
| Judge F Carr | French Gulch, CA | 383.9 GWh | 78.8 mi |
| Keswick | Redding, CA | 401.1 GWh | 88.6 mi |
| OR - Chapman Creek - Greenkey CSG | Cave Junction, OR | 4.7 GWh | 91.2 mi |
| Redding Power | Redding, CA | 161.8 GWh | 91.6 mi |
| Roseburg Forest Products Biomass | Weed, CA | 48.9 GWh | 97.5 mi |
| Shasta | Redding, CA | 2.0 TWh | 88.5 mi |
| Slate Creek | Lakehead, CA | 12.2 GWh | 86.1 mi |
| SPI Anderson 2 | Anderson, CA | 122.1 GWh | 97.3 mi |
| Spring Creek | Redding, CA | 444.5 GWh | 87.3 mi |
| Three Forks Water Power Project | Zenia, CA | 2.6 GWh | 56.1 mi |
| Trinity | Weaverville, CA | 475.6 GWh | 70.2 mi |
| Wheelabrator Shasta | Anderson, CA | 289.7 GWh | 100.5 mi |
| Whiskeytown | Whiskeytown, CA | 10.5 GWh | 84.1 mi |