Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| NLP Granger | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.5 GWh | Aug 2016 | Dec 2025 | Solar |
| AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2016 | Dec 2025 | Natural Gas |
| Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 170.4 GWh | Jul 2016 | Dec 2025 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.8 GWh | Jul 2016 | Dec 2025 | Solar |
| Riverside RWQCP Fuel Cell | Riverside Fuel Cell, LLC | Riverside, CA | California Independent System Operator (CISO) | 8.5 GWh | Jul 2016 | Dec 2024 | Other Biomass Gas : 83.8% Natural Gas : 16.2% |
| SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 946.0 MWh | Jul 2016 | Dec 2025 | Solar |
| Rancho Seco Solar, LLC | Rancho Seco Solar, LLC | Herald, CA | Balancing Authority of Northern California (BANC) | 18.0 GWh | Jul 2016 | Dec 2025 | Solar |
| Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.9 GWh | Jul 2016 | Dec 2025 | Solar |
| RE Barren Ridge 1 | RE Barren Ridge 1, LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 164.4 GWh | Jul 2016 | Dec 2025 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2016 | Dec 2025 | Solar |
| Springbok Solar Farm 1 | 62SK 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 280.4 GWh | Jun 2016 | Dec 2025 | Solar |
| RE Tranquillity | Southern Power Co | Cantua Creek, CA | California Independent System Operator (CISO) | 484.8 GWh | Jun 2016 | Dec 2025 | Solar |
| Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 329.1 GWh | Jun 2016 | May 2026 | Solar |
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 55.9 GWh | Jun 2016 | Dec 2025 | Solar |
| SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 52.7 GWh | May 2016 | Dec 2025 | Solar |
| Frontier Solar LLC | Boralex US Operations LLC | Newman, CA | California Independent System Operator (CISO) | 47.9 GWh | May 2016 | Dec 2025 | Solar |
| Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 3.3 GWh | May 2016 | Dec 2025 | Solar |
| RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 8.3 GWh | May 2016 | Dec 2025 | Solar |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2016 | Dec 2025 | Natural Gas |
| Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.1 GWh | Apr 2016 | Dec 2025 | Solar |
| Central Antelope Dry Ranch C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 38.9 GWh | Apr 2016 | Dec 2025 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 151.4 GWh | Mar 2016 | Dec 2025 | Landfill Gas |
| Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 38.2 GWh | Mar 2016 | Dec 2025 | Solar |
| Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 55.9 GWh | Mar 2016 | Dec 2025 | Landfill Gas |
| Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.2 GWh | Mar 2016 | Dec 2025 | Solar |
| Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2016 | Dec 2024 | Solar |
| Intel Folsom Phase 3 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 9.1 GWh | Mar 2016 | Dec 2025 | Solar |
| Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 357.0 GWh | Mar 2016 | Dec 2025 | Solar |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 701.0 MWh | Mar 2016 | Dec 2025 | Solar |
| SunE- E Philadelphia Ontario | SunEdison LLC | Ontario, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2016 | Dec 2025 | Solar |
| Adapture CA2, LLC | Adapture Renewables, Inc. | Orland, CA | PacifiCorp West (PACW) | 3.2 GWh | Feb 2016 | Dec 2025 | Solar |
| Blythe Solar 110, LLC | Blythe Solar 110, LLC | Blythe, CA | California Independent System Operator (CISO) | 283.6 GWh | Feb 2016 | Dec 2025 | Solar |
| CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2016 | Dec 2025 | Natural Gas |
| AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2016 | Dec 2025 | Natural Gas |
| Calipatria Solar Farm | Southern Power Co | Calipatria, CA | Imperial Irrigation District (IID) | 36.1 GWh | Jan 2016 | Dec 2025 | Solar |
| Corcoran Solar 3 | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 48.1 GWh | Jan 2016 | Dec 2025 | Solar |
| Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Sep 2025 | Solar |
| Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 4.5 GWh | Jan 2016 | Dec 2025 | Solar |
| Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 52.7 GWh | Dec 2015 | Dec 2025 | Solar |
| SEPV 18 | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 4.3 GWh | Dec 2015 | Dec 2025 | Solar |
| Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 640.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Woodmere Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 28.6 GWh | Nov 2015 | Dec 2025 | Solar |
| Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 47.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 50.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 53.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Seville 2 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 78.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Citizen B | AES Distributed Energy | Mendota, CA | California Independent System Operator (CISO) | 8.6 GWh | Nov 2015 | Dec 2025 | Solar |
| Colon PV | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2015 | Dec 2024 | Solar |
| Little Rock Pham Solar | Terraform Arcadia | Palmdale, CA | Los Angeles Department of Water and Power (LDWP) | 9.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Adera Solar | AES Distributed Energy | Chowchilla, CA | California Independent System Operator (CISO) | 32.7 GWh | Nov 2015 | Dec 2025 | Solar |
| Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 253.3 GWh | Nov 2015 | Dec 2025 | Wind |
| USG 2 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 2.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 242.5 GWh | Oct 2015 | Dec 2025 | Solar |
| Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Morelos del Sol | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 31.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.0 GWh | Oct 2015 | Dec 2025 | Natural Gas |
| Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 34.4 GWh | Sep 2015 | Dec 2025 | Solar |
| Columbia Solar Energy, LLC | Columbia Solar Energy LLC | Pittsburg, CA | California Independent System Operator (CISO) | 11.9 GWh | Sep 2015 | Dec 2025 | Solar |
| Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 10.8 GWh | Sep 2015 | Dec 2025 | Solar |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2015 | Aug 2025 | Solar |
| Port of LA Solar FiT Project | Los Angeles Department of Water & Power | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Sep 2015 | Dec 2025 | Solar |
| Central Utilities Plant LAX 2 | LAX Airport | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 31.8 GWh | Sep 2015 | May 2026 | Natural Gas |
| Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 59.3 GWh | Aug 2015 | Dec 2025 | Solar |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 818.0 MWh | Aug 2015 | Dec 2025 | Solar |
| Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2015 | Dec 2024 | Solar |
| SEPV Palmdale East | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 24.2 GWh | Jul 2015 | Dec 2025 | Solar |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 55.4 GWh | Jul 2015 | Dec 2025 | Solar |
| AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 45.7 GWh | Jul 2015 | Dec 2025 | Solar |
| SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 122.1 GWh | Jul 2015 | Dec 2025 | Wood/Wood Waste Solids : 99.3% Natural Gas : 0.7% |
| McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 638.7 GWh | Jul 2015 | Dec 2025 | Solar |
| Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 18.0 GWh | Jun 2015 | Dec 2025 | Solar |
| Kettleman Solar -Centaurus | Boralex US Operations LLC | Kettleman City, CA | California Independent System Operator (CISO) | 42.9 GWh | Jun 2015 | Dec 2025 | Solar |
| Bakersfield 111 | Bakersfield 111 LLC | Bakersfield, CA | PacifiCorp West (PACW) | 1.9 GWh | Jun 2015 | Dec 2024 | Solar |
| North Star Solar | Southern Power Co | Mendota, CA | California Independent System Operator (CISO) | 133.2 GWh | May 2015 | Dec 2025 | Solar |
| Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 260.1 GWh | May 2015 | Dec 2025 | Wind |
| Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 4.1 GWh | May 2015 | Dec 2025 | Solar |
| Imperial Valley Solar Co (IVSC) 2, LLC | Onward Energy | Niland, CA | Imperial Irrigation District (IID) | 43.9 GWh | May 2015 | Dec 2025 | Solar |
| National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.6 GWh | May 2015 | Dec 2025 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2025 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.9 GWh | May 2015 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 29.9 GWh | Apr 2015 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 20.6 GWh | Apr 2015 | Dec 2025 | Solar |
| Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 41.2 GWh | Apr 2015 | Dec 2025 | Solar |
| Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 40.5 GWh | Apr 2015 | Dec 2025 | Solar |
| Corcoran Solar 2 | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 46.8 GWh | Apr 2015 | Dec 2025 | Solar |
| Atwell Island West Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 51.9 GWh | Apr 2015 | Dec 2025 | Solar |
| Alamo Solar | Onward Energy | Oro Grande, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2015 | Dec 2025 | Solar |
| Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 35.4 GWh | Apr 2015 | Dec 2025 | Solar |
| Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 2.8 GWh | Apr 2015 | Dec 2025 | Solar |
| Lost Hills/Blackwell | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 58.9 GWh | Mar 2015 | Dec 2025 | Solar |
| Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2015 | Dec 2025 | Solar |
| Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 789.0 MWh | Mar 2015 | Dec 2025 | Solar |
| Venable Solar 1 | Madison Energy Investments LLC | Blythe, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2015 | Dec 2025 | Solar |
| Venable Solar 2 | Madison Energy Investments LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Sep 2025 | Solar |
| Santa Fe Springs Rooftop Solar BLDG M | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 2015 | Dec 2025 | Solar |
| Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.4 GWh | Feb 2015 | Dec 2025 | Solar |
| Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 2015 | Dec 2025 | Solar |
| Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2015 | Dec 2025 | Solar |
| Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 49.3 GWh | Feb 2015 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |