Bishop Ranch - BR 8-Q
3000 Executive Pkwy, San Ramon, CA 94583Plant Summary Information
Bishop Ranch - BR 8-Q is ranked #863 out of 914 solar farms in California in terms of total annual net electricity generation.
Bishop Ranch - BR 8-Q generated 169.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Bishop Ranch - BR 8-Q |
|---|---|
| Utility Name | Executive Parkway BR8-Q Solar Project 2020 LLC |
| Location | Contra Costa County, CA |
| Initial Operation Date | April 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 871.0 MWh |
| Annual Consumption | 3.0 k MMBtu |
| Ranked #12,187 out of 13,269 Power Plants Nationwide | |
| Ranked #6,870 out of 7,183 Solar Power Plants Nationwide | |
| Ranked #1,567 out of 1,637 California Power Plants | |
| Ranked #863 out of 914 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Bishop Ranch - BR 8-Q
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bishop Ranch - BR 8-Q.
Monthly Net Generation for Bishop Ranch - BR 8-Q
Monthly Plant Fuel Consumption for Bishop Ranch - BR 8-Q
Bishop Ranch - BR 8-Q Details
| Summary Information | |
|---|---|
| Plant Name | Bishop Ranch - BR 8-Q (68523) |
| Plant Address | 3000 Executive Pkwy, San Ramon, CA 94583 |
| Utility | Executive Parkway BR8-Q Solar Project 2020 LLC (66894) |
| Latitude, Longitude | 37.76871, -121.96838 |
| Generation Dates on File | Apr 2025 to Dec 2025 |
| Initial Operation Date | April 2025 |
| Annual Generation | 871.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 22-862-000, 22-862-001, 22-862-002 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | Yes |
Generator 4977B Details Operating April 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 1.1 |
|---|---|
| Maximum Charge Rate | 0.5 MW |
| Maximum Discharge Rate | 0.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.1 |
| Storage Enclosure Type | CS |
| System Peak Shaving | Yes |
| Load Management | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 68523 |
| Direct Support Gen Id | 4977C |
| Support T D Asset | No |
Generator 4977C Details Operating April 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 153 |
| Tilt Angle | 5 |
| DC Net Capacity | 0.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.9 MW |
| Virtual Net Metering Agreement | No |
Bishop Ranch - BR 8-Q Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6860 | Atlanta Falcons Solar | Atlanta, GA | 896.0 MWh |
| #6861 | Delano Land 1 | Delano, CA | 892.0 MWh |
| #6862 | Stockbridge | Munnsville, NY | 892.0 MWh |
| #6863 | Oneida East | Holland Patent, NY | 891.0 MWh |
| #6864 | HCE Moore I | Aberdeen, NC | 886.0 MWh |
| #6865 | Hamlet Solar Energy Storage | Hamlet, NC | 867.0 MWh |
| #6866 | 2127 Harris Solar Project | Live Oak, CA | 885.0 MWh |
| #6867 | Manchester Community College North | Great Path, CT | 885.0 MWh |
| #6868 | IMPA Richmond Solar Park | Richmond, IN | 884.0 MWh |
| #6869 | Tioga Solar Morris County 1 LLC | Morristown, NJ | 876.0 MWh |
| #6871 | Wilson Solar (MA) | Spencer, MA | 870.0 MWh |
| #6872 | State Route 64N Community Solar Farm | East Bloomfield, NY | 870.0 MWh |
| #6873 | East Windsor | East Windsor, CT | 869.0 MWh |
| #6874 | NL IL - Maples Road | Dixon, IL | 867.0 MWh |
| #6875 | DIVOCSG 14 LLC | Wabasha, MN | 862.0 MWh |
| #6876 | SCV Water - Gladbach Water Treatment Plant Phases I and II | Santa Clara, CA | 858.0 MWh |
| #6877 | Sonora 1 | Jamestown, CA | 858.0 MWh |
| #6878 | South River H4 Solar Energy Storage | Autryville, NC | 834.0 MWh |
| #6879 | OR - Green Key - Buckner CSG | Oregon, OR | 847.0 MWh |
| #6880 | Shissler Solar | Brimfield, IL | 847.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bishop Ranch - BR 8-Q.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Vasco Road | Livermore, CA | 32.7 GWh | 13.1 mi |
| AT&T - Hayward | Hayward, CA | 7.6 GWh | 10.3 mi |
| Bishop Ranch - BR 1-Y | San Ramon, CA | 1.7 GWh | 0.7 mi |
| Bishop Ranch - BR 15-AA | San Ramon, CA | 766.0 MWh | 0.6 mi |
| Bishop Ranch - BR 15-CC | San Ramon, CA | 950.0 MWh | 0.5 mi |
| Bishop Ranch - BR 15-DD | San Ramon, CA | 62.0 MWh | 0.6 mi |
| Bishop Ranch - BR 2600 | San Ramon, CA | 764.0 MWh | 0.4 mi |
| Bishop Ranch - BR 8-O | San Ramon, CA | 1.4 GWh | 0.1 mi |
| Bishop Ranch - BR 8-P | San Ramon, CA | 1.3 GWh | 0.1 mi |
| Bishop Ranch BR 1-X | San Ramon, CA | 1.5 GWh | 0.9 mi |
| City of Hayward WWTP | Hayward, CA | 10.5 GWh | 13.2 mi |
| Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.9 GWh | 6.3 mi |
| KSR028 Merced Fuel Cell | San Leandro, CA | 16.4 GWh | 11.6 mi |
| Las Positas College | Livermore, CA | 1.7 GWh | 10 mi |
| Life Technologies - Pleasanton | Pleasanton, CA | 8.3 GWh | 9.8 mi |
| Preferred Freezer San Leandro | San Leandro, CA | 3.0 GWh | 10.7 mi |
| Russell City Energy Center | Hayward, CA | 1.6 TWh | 12.9 mi |
| Santa Rita Jail Fuel Cell | Dublin, CA | 8.1 GWh | 5.6 mi |
| Santa Rita Jail Hybrid | Dublin, CA | 10.4 GWh | 5.6 mi |
| Thermo Fisher Pleasanton | Pleasanton, CA | 1.5 GWh | 9.7 mi |