4930 Allbaugh Drive, Sacramento, CA 95837Plant Summary Information
CA - Amazon - SMF6 is ranked #896 out of 914 solar farms in California in terms of total annual net electricity generation.
CA - Amazon - SMF6 generated 361.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | CA - Amazon - SMF6 |
|---|---|
| Utility Name | Forefront Power, LLC |
| Location | Sacramento County, CA |
| Initial Operation Date | October 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 361.0 MWh |
| Annual Consumption | 1.2 k MMBtu |
| Ranked #12,503 out of 13,269 Power Plants Nationwide | |
| Ranked #7,022 out of 7,183 Solar Power Plants Nationwide | |
| Ranked #1,611 out of 1,637 California Power Plants | |
| Ranked #896 out of 914 California Solar Power Plants | |
| Fuel Types | Solar |
Map of CA - Amazon - SMF6
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CA - Amazon - SMF6.
Monthly Net Generation for CA - Amazon - SMF6
Monthly Plant Fuel Consumption for CA - Amazon - SMF6
CA - Amazon - SMF6 Details
| Summary Information | |
|---|---|
| Plant Name | CA - Amazon - SMF6 (65616) |
| Plant Address | 4930 Allbaugh Drive, Sacramento, CA 95837 |
| Utility | Forefront Power, LLC (62856) |
| Latitude, Longitude | 38.75, -121.55 |
| Generation Dates on File | Oct 2025 to Dec 2025 |
| Initial Operation Date | October 2025 |
| Annual Generation | 361.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 23-117-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
Generator 20031 Details Operating October 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.6 MW |
| Summer Capacity | 2.6 MW |
| Winter Capacity | 2.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 211 |
| Tilt Angle | 10 |
| DC Net Capacity | 3.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
CA - Amazon - SMF6 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #7012 | Water Lily Solar LLC | Minooka, IL | 388.0 MWh |
| #7013 | Tazewell County IL S1 | Delavan, IL | 386.0 MWh |
| #7014 | South Belleville Solar, LLC | Smithton Township, IL | 385.0 MWh |
| #7015 | Triple S Solar I LLC CSG | Kansas, IL | 381.0 MWh |
| #7016 | USS Golden Spike Solar LLC CSG | Sauk Rapids, MN | 379.0 MWh |
| #7017 | Hannibal | Gillman, WI | 378.0 MWh |
| #7018 | Lanesville Solar RES | Lanesville, IN | 374.0 MWh |
| #7019 | Mountain View Ind Park 1-sline001 | Fontana, CA | 371.0 MWh |
| #7020 | SV CSG Prophetstown 1 | Prophetstown, IL | 370.0 MWh |
| #7021 | AES Bend Solar I, LLC CSG | Rockford, IL | 369.0 MWh |
| #7023 | Bright Future | Hammond, WI | 361.0 MWh |
| #7024 | Vermilion Solar II LLC CSG | Pontiac, IL | 357.0 MWh |
| #7025 | Stafford Hill Solar Hybrid | Rutland, VT | 355.0 MWh |
| #7026 | Verizon Comms Garage Top Solar Project | San Jose, CA | 348.0 MWh |
| #7027 | Romeoville 34 - SLCHI234 - BSCHI234 | Romeoville, IL | 348.0 MWh |
| #7028 | Walnut Unified School District Walnut HS | Walnut, CA | 327.0 MWh |
| #7029 | Bowie State Solar | Bowie, MD | 342.0 MWh |
| #7030 | Pilot Rock Solar 2 | Pilot Rock, OR | 340.0 MWh |
| #7031 | SL JAMESTOWN ARRAY 1 | Jamestown, NY | 337.0 MWh |
| #7032 | Magruder Solar Community Solar | Shawangunk, NY | 335.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CA - Amazon - SMF6.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| CA- US Foods- Sacramento (McClellan) | McClellan, CA | 1.4 GWh | 10.2 mi |
| Chambers 4 - Sacramento SMF1 | Sacramento, CA | 2.9 GWh | 4.8 mi |
| Department of Justice | Sacramento, CA | 3.5 GWh | 15 mi |
| Lincoln Landfill | Lincoln, CA | 29.4 GWh | 12.7 mi |
| Lincoln WWTF Hybrid | Lincoln, CA | 6.3 GWh | 13.3 mi |
| McClellan (CA) | Sacramento, CA | 1.2 GWh | 10.8 mi |
| MM Yolo Power | Woodland, CA | 16.2 GWh | 13 mi |
| Rio Bravo Rocklin | Lincoln, CA | 147.0 GWh | 13.9 mi |
| Roseville Energy Park | Roseville, CA | 329.9 GWh | 9.6 mi |
| Roseville Power Plant #2 | Rocklin, CA | 569.0 MWh | 12.9 mi |
| Sacramento (SMUD) | Sacramento, CA | 2.3 GWh | 12.3 mi |
| Sacramento Point West Medical Offices | Sacramento, CA | 2.2 GWh | 12.5 mi |
| SCDA Solar 1 | Sacramento, CA | 14.2 GWh | 4.6 mi |
| Strata Roof 1 | Sacramento, CA | 1.4 GWh | 7.7 mi |
| Target Woodland Solar Project | Woodland, CA | 2.8 GWh | 10.4 mi |
| US GSA - Sacramento | Sacramento, CA | 1.5 GWh | 13.1 mi |
| Walgreens Woodland Distribution Center | Woodland, CA | 432.0 MWh | 10.2 mi |
| Wildflower Solar 1 | Elverta, CA | 28.1 GWh | 5 mi |
| Woodland Biomass Power Ltd | Woodland, CA | 161.9 GWh | 10.9 mi |
| Yolo County Solar Project | Woodland, CA | 446.5 MWh | 11.5 mi |