Bishop Ranch - BR 2600
2700 Camino Ramon, San Ramon, CA 94583Plant Summary Information
Bishop Ranch - BR 2600 is ranked #874 out of 914 solar farms in California in terms of total annual net electricity generation.
Bishop Ranch - BR 2600 generated 321.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Bishop Ranch - BR 2600 |
|---|---|
| Utility Name | Camino Ramon BR 2600 Solar Project 2020, LLC |
| Location | Contra Costa County, CA |
| Initial Operation Date | July 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 764.0 MWh |
| Annual Consumption | 2.6 k MMBtu |
| Ranked #12,247 out of 13,269 Power Plants Nationwide | |
| Ranked #6,907 out of 7,183 Solar Power Plants Nationwide | |
| Ranked #1,580 out of 1,637 California Power Plants | |
| Ranked #874 out of 914 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Bishop Ranch - BR 2600
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bishop Ranch - BR 2600.
Monthly Net Generation for Bishop Ranch - BR 2600
Monthly Plant Fuel Consumption for Bishop Ranch - BR 2600
Bishop Ranch - BR 2600 Details
| Summary Information | |
|---|---|
| Plant Name | Bishop Ranch - BR 2600 (67278) |
| Plant Address | 2700 Camino Ramon, San Ramon, CA 94583 |
| Utility | Camino Ramon BR 2600 Solar Project 2020, LLC (66144) |
| Latitude, Longitude | 37.76631, -121.96169 |
| Generation Dates on File | Jul 2025 to Dec 2025 |
| Initial Operation Date | July 2025 |
| Annual Generation | 764.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 22-864 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | Yes |
Generator 4146B Details Operating July 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Summer Capacity | 1.1 MW |
| Winter Capacity | 1.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 2.1 |
|---|---|
| Maximum Charge Rate | 1.1 MW |
| Maximum Discharge Rate | 1.1 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.5 |
| Storage Enclosure Type | CS |
| System Peak Shaving | Yes |
| Load Management | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 67278 / 67278 |
| Direct Support Gen Id | 4146C / 4147R |
| Support T D Asset | No |
Generator 4146C Details Operating July 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 243 |
| Tilt Angle | 5 |
| DC Net Capacity | 0.52 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.5 MW |
| Virtual Net Metering Agreement | No |
Generator 4147R Details Operating July 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 152.7 |
| Tilt Angle | 10 |
| DC Net Capacity | 1.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.4 MW |
| Virtual Net Metering Agreement | No |
Bishop Ranch - BR 2600 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6897 | Brimfield Solar | Brimfield, IL | 798.0 MWh |
| #6898 | Wake RJ3 Solar Energy Storage | Wake Forest, NC | 774.0 MWh |
| #6899 | Avalon Dairy | Wasco, CA | 792.0 MWh |
| #6900 | 500 Virginia Solar | Ft. Washington, PA | 789.0 MWh |
| #6901 | Colton Solar Two, LLC | Colton, CA | 789.0 MWh |
| #6902 | Phoenix Airport East Economy Lot | Phoenix, AZ | 777.0 MWh |
| #6903 | Water Line Solar, LLC | North Yarmouth, ME | 773.0 MWh |
| #6904 | Google Bayhill Solar PV and Microgrid | San Bruno, CA | 651.0 MWh |
| #6905 | Bishop Ranch - BR 15-AA | San Ramon, CA | 766.0 MWh |
| #6906 | O'Brien 1 | Hartford, NY | 769.0 MWh |
| #6908 | IKEA New Haven Rooftop PV & Fuel Cell | New Haven, CT | 2.7 GWh |
| #6909 | Castor Solar | Dustin Acres, CA | 766.0 MWh |
| #6910 | IL Bolingbrook 279 Marquette Dr | Bolingbrook, IL | 762.0 MWh |
| #6911 | MSC-Scott01 LLC | Jordan, MN | 754.0 MWh |
| #6912 | Freeport 18th Solar | Freeport, IL | 753.0 MWh |
| #6913 | Pluma - SLT Las Cruces | Las Cruces, NM | 751.0 MWh |
| #6914 | Fort Polk (fka Johnson) - Chaffee West | Fort Polk North, LA | 750.0 MWh |
| #6915 | East Windsor Solar Two | East Windsor, CT | 749.0 MWh |
| #6916 | FTF-PackingShed | Reedley, CA | 747.6 MWh |
| #6917 | Kelso Community Solar I | Essex, MD | 747.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bishop Ranch - BR 2600.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Vasco Road | Livermore, CA | 32.7 GWh | 12.7 mi |
| AT&T - Hayward | Hayward, CA | 7.6 GWh | 10.4 mi |
| Bishop Ranch - BR 1-Y | San Ramon, CA | 1.7 GWh | 0.4 mi |
| Bishop Ranch - BR 15-AA | San Ramon, CA | 766.0 MWh | 0.6 mi |
| Bishop Ranch - BR 15-CC | San Ramon, CA | 950.0 MWh | 0.5 mi |
| Bishop Ranch - BR 15-DD | San Ramon, CA | 62.0 MWh | 0.5 mi |
| Bishop Ranch - BR 8-O | San Ramon, CA | 1.4 GWh | 0.3 mi |
| Bishop Ranch - BR 8-P | San Ramon, CA | 1.3 GWh | 0.3 mi |
| Bishop Ranch - BR 8-Q | San Ramon, CA | 871.0 MWh | 0.4 mi |
| Bishop Ranch BR 1-X | San Ramon, CA | 1.5 GWh | 0.6 mi |
| City of Hayward WWTP | Hayward, CA | 10.5 GWh | 13.4 mi |
| Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.9 GWh | 5.9 mi |
| KSR028 Merced Fuel Cell | San Leandro, CA | 16.4 GWh | 11.8 mi |
| Las Positas College | Livermore, CA | 1.7 GWh | 9.6 mi |
| Life Technologies - Pleasanton | Pleasanton, CA | 8.3 GWh | 9.5 mi |
| Preferred Freezer San Leandro | San Leandro, CA | 3.0 GWh | 11 mi |
| Russell City Energy Center | Hayward, CA | 1.6 TWh | 13.1 mi |
| Santa Rita Jail Fuel Cell | Dublin, CA | 8.1 GWh | 5.2 mi |
| Santa Rita Jail Hybrid | Dublin, CA | 10.4 GWh | 5.2 mi |
| Thermo Fisher Pleasanton | Pleasanton, CA | 1.5 GWh | 9.4 mi |