BCE Seal Beach
800 Seal Beach Blvd, Seal Beach, CA 90740Plant Summary Information
BCE Seal Beach is ranked #814 out of 851 solar farms in California in terms of total annual net electricity generation.
BCE Seal Beach generated 824.0 MWh during the 3-month period between August 2025 to November 2025.
| Plant Name | BCE Seal Beach |
|---|---|
| Utility Name | BCE Seal Beach |
| Location | Orange County, CA |
| Initial Operation Date | Not Available |
| Last Update | Nov 2025 |
| Annual Generation | 824.0 MWh |
| Annual Consumption | 3.0 k MMBtu |
| Ranked #11,548 out of 12,574 Power Plants Nationwide | |
| Ranked #6,180 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #1,552 out of 1,603 California Power Plants | |
| Ranked #814 out of 851 California Solar Power Plants | |
| Fuel Types | Solar |
Map of BCE Seal Beach
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for BCE Seal Beach.
Monthly Net Generation for BCE Seal Beach
BCE Seal Beach Details
| Summary Information | |
|---|---|
| Plant Name | BCE Seal Beach (68023) |
| Plant Address | 800 Seal Beach Blvd, Seal Beach, CA 90740 |
| Utility | BCE Seal Beach (66555) |
| Latitude, Longitude | 33.73276, -118.04451 |
| Generation Dates on File | Nov 2025 to Nov 2025 |
| Initial Operation Date | Not Available |
| Annual Generation | 824.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG25-2-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | Yes |
BCE Seal Beach Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6170 | Daytona International Speedway Solar | Daytona Beach, FL | 900.0 MWh |
| #6171 | Claverack Creek Solar | Hudson, NY | 895.0 MWh |
| #6172 | Community Foodbank of NJ | Hillside, NJ | 884.0 MWh |
| #6173 | Yamhill Solar LLC | Amity, OR | 881.0 MWh |
| #6174 | West Tambo Clean Power II | Livingston, CA | 877.0 MWh |
| #6175 | Tioga Solar Morris County 1 LLC | Morristown, NJ | 876.0 MWh |
| #6176 | Spring Hill Road | Barre, MA | 876.0 MWh |
| #6177 | CMEEC - Rogers Rd Solar | Norwich, CT | 875.0 MWh |
| #6178 | Staples La Mirada, CA | La Mirada, CA | 871.0 MWh |
| #6179 | Niagara Bottling Stockton | Stockton, CA | 870.0 MWh |
| #6181 | Park Solar | Woodbridge, CT | 866.0 MWh |
| #6182 | Edwards Air Force Base | Edwards, CA | 866.0 MWh |
| #6183 | CSU Northridge Plant | Northridge, CA | 865.0 MWh |
| #6184 | LSE Pavo Solar | Walton, NY | 861.0 MWh |
| #6185 | Manlius West | Manlius, NY | 848.0 MWh |
| #6186 | Renewable Energy Center at BJH | St Louis, MO | 846.0 MWh |
| #6187 | Searcy Water I | Searcy, AR | 834.0 MWh |
| #6188 | Clovis High School | Clovis, CA | 826.0 MWh |
| #6189 | CCMUA | Camden, NJ | 824.0 MWh |
| #6190 | Walnut Unified School District Walnut HS | Walnut, CA | 809.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding BCE Seal Beach.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AES Alamitos Energy Center | Long Beach, CA | 1.5 TWh | 4 mi |
| AES Alamitos LLC | Long Beach, CA | 28.2 GWh | 4.1 mi |
| AES Huntington Beach Energy Project | Huntington Beach, CA | 2.0 TWh | 7.1 mi |
| AES Huntington Beach LLC | Huntington Beach, CA | 6.2 GWh | 7.2 mi |
| Anaheim Solar Energy Plant | Anaheim, CA | 2.7 GWh | 8.6 mi |
| AT&T Anaheim | Anaheim, CA | 9.7 GWh | 10.2 mi |
| Barre Peaker | Stanton, CA | 12.7 GWh | 6.2 mi |
| BCE Los Alamitos 1 | Los Alamitos, CA | 19.1 GWh | 4.1 mi |
| BCE Los Alamitos 2 | Los Alamitos, CA | 3.4 GWh | 3.6 mi |
| City of Long Beach Airport Lot A & B | Long Beach, CA | 2.8 GWh | 8 mi |
| CSU Long Beach Lots 7 & 14 | Long Beach, CA | 6.9 GWh | 5.2 mi |
| Haynes | Long Beach, CA | 1.6 TWh | 3.8 mi |
| Hoag Hospital Cogen Plant | Newport Beach, CA | 25.2 GWh | 9.8 mi |
| Orange Coast College PH2 Solar Project | Costa Mesa, CA | 4.0 GWh | 8.7 mi |
| Plant No 1 Orange County | Fountain Valley, CA | 40.3 GWh | 6.7 mi |
| Plant No 2 Orange County | Huntington Beach, CA | 59.3 GWh | 8 mi |
| Signal Hill West Unit | Signal Hill, CA | 39.2 GWh | 9.3 mi |
| Stanton Energy Reliability Center Hybrid | Stanton, CA | 1.6 GWh | 6.1 mi |
| Staples La Mirada, CA | La Mirada, CA | 871.0 MWh | 10.4 mi |
| THUMS | Long Beach, CA | 183.0 GWh | 10 mi |