BCE Seal Beach
800 Seal Beach Blvd, Seal Beach, CA 90740Plant Summary Information
BCE Seal Beach is ranked #324 out of 886 solar farms in California in terms of total annual net electricity generation.
BCE Seal Beach generated 4.1 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | BCE Seal Beach |
|---|---|
| Utility Name | BCE Seal Beach |
| Location | Orange County, CA |
| Initial Operation Date | November 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 9.8 GWh |
| Annual Consumption | 37.1 k MMBtu |
| Ranked #6,299 out of 13,094 Power Plants Nationwide | |
| Ranked #1,900 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #843 out of 1,607 California Power Plants | |
| Ranked #324 out of 886 California Solar Power Plants | |
| Fuel Types | Solar |
Map of BCE Seal Beach
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for BCE Seal Beach.
Monthly Net Generation for BCE Seal Beach
Monthly Plant Fuel Consumption for BCE Seal Beach
BCE Seal Beach Details
| Summary Information | |
|---|---|
| Plant Name | BCE Seal Beach (68023) |
| Plant Address | 800 Seal Beach Blvd, Seal Beach, CA 90740 |
| Utility | BCE Seal Beach (66555) |
| Latitude, Longitude | 33.73276, -118.04451 |
| Generation Dates on File | Nov 2025 to Jun 2026 |
| Initial Operation Date | November 2025 |
| Annual Generation | 9.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG25-2-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | Yes |
Generator SBBS1 Details Operating November 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 16.7 MW |
| Summer Capacity | 16.7 MW |
| Winter Capacity | 16.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 64 |
|---|---|
| Maximum Charge Rate | 16.7 MW |
| Maximum Discharge Rate | 16.7 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 16.7 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Co Located Renewable Firming | Yes |
| System Peak Shaving | Yes |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 68023 |
| Direct Support Gen Id | SBPV1 |
| Support T D Asset | No |
Generator SBPV1 Details Operating November 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 12 MW |
| Summer Capacity | 11.5 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 11.51 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
BCE Seal Beach Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1890 | CBEP Solar 1, LLC | Sterling, CO | 11.0 GWh |
| #1891 | Butterfield Solar Farm | Durant, OK | 11.0 GWh |
| #1892 | Polk Farm | Hamlet, NC | 11.0 GWh |
| #1893 | Gliden (Op Zone) | Tyner, NC | 11.0 GWh |
| #1894 | Nachtigall 1836-WD | Wasco, CA | 11.0 GWh |
| #1895 | JMB Mcguire-Dix-Lakehurst Solar Project | McGuire AFB, NJ | 10.9 GWh |
| #1896 | Richmond Solar Park 4 | Richmond, IN | 10.9 GWh |
| #1897 | Windsor Hwy 17 Solar | Windsor, NC | 10.9 GWh |
| #1898 | Snow Camp Solar, LLC | Snow Camp, NC | 10.9 GWh |
| #1899 | Napoleon Solar I | Napoleon, OH | 10.9 GWh |
| #1901 | USPS PV | Los Angeles, CA | 10.9 GWh |
| #1902 | Chisago Solar | North Branch, MN | 10.8 GWh |
| #1903 | Wonderful Orchards - New Columbia | Firebaugh, CA | 10.8 GWh |
| #1904 | SCE&G Springfield CSG | Springfield, SC | 10.8 GWh |
| #1905 | Osawatomie Solar | Osawatomie, KS | 10.8 GWh |
| #1906 | RE Bruceville 1 LLC | Elk Grove, CA | 10.8 GWh |
| #1907 | Overman Solar | Goldsboro, NC | 10.8 GWh |
| #1908 | Scottsburg Solar Park | Scottsburg, IN | 10.8 GWh |
| #1909 | Tequesquite Landfill Solar PV Project | Riverside, CA | 10.8 GWh |
| #1910 | Sellers Farm Solar | Hamlet, NC | 10.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding BCE Seal Beach.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AES Alamitos Energy Center | Long Beach, CA | 1.1 TWh | 4 mi |
| AES Alamitos LLC | Long Beach, CA | 13.4 GWh | 4.1 mi |
| AES Huntington Beach Energy Project | Huntington Beach, CA | 1.7 TWh | 7.1 mi |
| AES Huntington Beach LLC | Huntington Beach, CA | 4.9 GWh | 7.2 mi |
| Alticor Inc - Solar Project | Buena Park, CA | 1.4 GWh | 10.5 mi |
| Anaheim Solar Energy Plant | Anaheim, CA | 1.7 GWh | 8.6 mi |
| AT&T Anaheim | Anaheim, CA | 7.5 GWh | 10.2 mi |
| Barre Peaker | Stanton, CA | 5.4 GWh | 6.2 mi |
| BCE Los Alamitos 1 | Los Alamitos, CA | 19.1 GWh | 4.1 mi |
| City of Long Beach Airport Lot A & B | Long Beach, CA | 3.4 GWh | 8 mi |
| CSU Long Beach Lots 7 & 14 | Long Beach, CA | 7.2 GWh | 5.2 mi |
| Haynes | Long Beach, CA | 1.2 TWh | 3.8 mi |
| Hoag Hospital Cogen Plant | Newport Beach, CA | 27.4 GWh | 9.8 mi |
| Orange Coast College PH2 Solar Project | Costa Mesa, CA | 4.0 GWh | 8.7 mi |
| Plant No 1 Orange County | Fountain Valley, CA | 40.8 GWh | 6.7 mi |
| Plant No 2 Orange County | Huntington Beach, CA | 46.9 GWh | 8 mi |
| Signal Hill West Unit | Signal Hill, CA | 39.2 GWh | 9.3 mi |
| Stanton Energy Reliability Center Hybrid | Stanton, CA | 2.3 GWh | 6.1 mi |
| Staples La Mirada, CA | La Mirada, CA | 1.5 GWh | 10.4 mi |
| THUMS | Long Beach, CA | 158.0 GWh | 10 mi |