Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2020 | Dec 2023 | Solar |
DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 4.0 GWh | Jan 2021 | Dec 2023 | Solar |
Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.8 GWh | Jul 2021 | Dec 2023 | Solar |
ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.6 GWh | Aug 2021 | Dec 2023 | Solar |
FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2013 | Dec 2023 | Solar |
Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2023 | Dec 2023 | Other Biomass Gas |
Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2020 | Dec 2023 | Solar |
Fifth Standard Solar PV, LLC (Hybrid) | RWE Renewables Americas, LLC | Huron, CA | California Independent System Operator (CISO) | 318.8 GWh | Aug 2023 | Mar 2025 | Solar |
Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2020 | Dec 2023 | Solar |
Firebaugh-CCS-PV-1 | Mike Woolf Farming | Firebaugh, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2015 | Dec 2023 | Solar |
Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 293.2 GWh | Jul 2022 | Mar 2025 | Solar |
Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2023 | Solar |
Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2013 | Dec 2023 | Solar |
Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 43.8 GWh | Aug 2016 | Dec 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG M | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2015 | Nov 2023 | Solar |
Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2013 | Dec 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2015 | Dec 2023 | Solar |
MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 41.3 GWh | Jan 2003 | Dec 2023 | Natural Gas |
Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 2.3 GWh | May 2015 | Dec 2023 | Solar |
Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2015 | Dec 2023 | Solar |
2081 Terzian Solar Project | Solarenewal LLC | Reedley, CA | California Independent System Operator (CISO) | 2.0 GWh | Jan 2014 | Dec 2023 | Solar |
2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2014 | Dec 2023 | Solar |
2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2023 | Solar |
CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 39.0 GWh | Nov 2014 | Dec 2023 | Solar |
Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2014 | Dec 2023 | Solar |
Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 30.0 GWh | Aug 2016 | Dec 2023 | Solar |
Victor Mesa Linda E2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2023 | Solar |
Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 48.0 GWh | Nov 2016 | Dec 2023 | Solar |
Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.1 GWh | Nov 2014 | Dec 2023 | Solar |
Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.7 GWh | Oct 2014 | Dec 2023 | Solar |
Victor Mesa Linda C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2014 | Dec 2023 | Solar |
Victor Mesa Linda B2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2014 | Dec 2023 | Solar |
Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2014 | Dec 2023 | Solar |
Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2014 | Dec 2023 | Solar |
Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2014 | Dec 2023 | Solar |
Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 7.9 GWh | Nov 2014 | Dec 2023 | Solar |
Wildwood Solar II | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 36.6 GWh | Dec 2016 | Dec 2023 | Solar |
Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 5.7 GWh | Jun 2014 | Dec 2023 | Solar |
Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 46.5 GWh | Nov 2016 | Dec 2023 | Solar |
Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 49.8 GWh | Nov 2014 | Dec 2023 | Solar |
ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2009 | Dec 2023 | Solar |
Beringer | Perpetual Energy Systems | Saint Helena, CA | California Independent System Operator (CISO) | 1.3 GWh | Dec 2008 | Dec 2023 | Solar |
Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 261.7 GWh | May 2015 | Dec 2023 | Wind |
SEPV 18 | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2015 | Dec 2023 | Solar |
Rising Tree Wind Farm II | Rising Tree Wind Farm II LLC | Mojave, CA | California Independent System Operator (CISO) | 47.7 GWh | Dec 2014 | Dec 2023 | Wind |
Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2014 | Dec 2023 | Solar |
Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.2 GWh | May 2014 | Nov 2023 | Solar |
Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.7 GWh | May 2014 | Dec 2023 | Solar |
Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Dec 2023 | Solar |
RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 117.6 GWh | Nov 2014 | Dec 2023 | Solar |
RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 29.9 GWh | Nov 2014 | Dec 2023 | Solar |
RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 38.7 GWh | Nov 2014 | Dec 2023 | Solar |
RE Old River One, LLC | Onward Energy | Bakersfield, CA | California Independent System Operator (CISO) | 34.7 GWh | Nov 2014 | Dec 2023 | Solar |
RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 34.2 GWh | Nov 2014 | Dec 2023 | Solar |
RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2014 | Dec 2023 | Solar |
Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 234.2 GWh | Jul 2016 | Dec 2023 | Solar |
Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2023 | Solar |
Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 21.1 GWh | Apr 2015 | Dec 2023 | Solar |
Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 25.3 GWh | Apr 2015 | Dec 2023 | Solar |
Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 28.6 GWh | Apr 2015 | Dec 2023 | Solar |
SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2011 | Mar 2025 | Distillate Fuel Oil |
Carlsbad Energy Center | NRG California Peaker Operations LLC | Carlsbad, CA | California Independent System Operator (CISO) | 267.3 GWh | Nov 2018 | Mar 2025 | Natural Gas |
SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 141.6 GWh | Jul 2015 | Dec 2023 | Wood/Wood Waste Solids : 99.8% |
Woodmere Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 31.0 GWh | Nov 2015 | Dec 2023 | Solar |
Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 58.4 GWh | Nov 2015 | Dec 2023 | Solar |
EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2023 | Solar |
Lancaster Solar 2 | PsomasFMG Lancaster Solar Crest, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2023 | Solar |
AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 27.6 GWh | Jul 2015 | Dec 2023 | Solar |
Lancaster Solar 1 | PsomasFMG Lancaster Solar Crest, LLC | Lancaster, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2014 | Dec 2023 | Solar |
RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 149.9 GWh | Jul 2016 | Dec 2023 | Solar |
SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 117.0 MWh | Apr 2011 | Nov 2023 | Solar |
Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.4 GWh | Apr 2016 | Nov 2023 | Solar |
SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2011 | Dec 2023 | Solar |
EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2023 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2015 | Dec 2023 | Solar |
CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2023 | Solar |
CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2023 | Solar |
Enerparc CA1 LLC | Enerparc CA 1, LLC | Hollister, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2023 | Solar |
Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 14.2 GWh | Feb 2013 | Dec 2023 | Other Biomass Gas : 85.5% Natural Gas : 14.5% |
Kettleman Solar -Centaurus | EE Kettleman California LLC | Kettleman City, CA | California Independent System Operator (CISO) | 37.7 GWh | Jun 2015 | Dec 2023 | Solar |
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2023 | Solar |
Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.7 GWh | Apr 2015 | Dec 2023 | Solar |
White River Solar 2 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 49.3 GWh | Aug 2014 | Dec 2023 | Solar |
Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 354.3 GWh | Nov 2019 | Mar 2025 | Solar |
Corcoran Solar 2 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 46.8 GWh | Apr 2015 | Dec 2023 | Solar |
Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 45.5 GWh | Apr 2015 | Dec 2023 | Solar |
Mitchell Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2014 | Dec 2023 | Solar |
Rudy Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2014 | Dec 2023 | Solar |
Madelyn Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2014 | Dec 2023 | Solar |
Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 48.2 GWh | Apr 2015 | Dec 2023 | Solar |
Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.3 GWh | Dec 2014 | Dec 2023 | Solar |
Five Points Solar Park | Five Points Solar Park, LLC | Five Points, CA | California Independent System Operator (CISO) | 102.0 GWh | Aug 2016 | Dec 2023 | Solar |
Blackwell Solar Park | Consolidated Edison Development Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 40.1 GWh | Dec 2018 | Dec 2023 | Solar |
Atwell Island West Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 46.5 GWh | Apr 2015 | Dec 2023 | Solar |
Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 51.3 GWh | Dec 2015 | Dec 2023 | Solar |
Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 107.7 GWh | May 2020 | Mar 2025 | Solar |
Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 44.7 GWh | Jan 2015 | Dec 2023 | Solar |
Summary of Power Plants By State
Figures are based on March 2025 generation numbers.State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,399.45 GWh |
Alaska | # 48 | 137 | 460.30 GWh |
Arizona | # 16 | 167 | 7,756.35 GWh |
Arkansas | # 29 | 79 | 4,503.48 GWh |
California | # 5 | 1,565 | 15,306.94 GWh |
Colorado | # 30 | 257 | 4,337.74 GWh |
Connecticut | # 31 | 152 | 3,831.37 GWh |
Delaware | # 50 | 30 | 183.34 GWh |
District of Columbia | # 51 | 12 | 15.27 GWh |
Florida | # 3 | 305 | 18,686.61 GWh |
Georgia | # 9 | 239 | 9,979.52 GWh |
Hawaii | # 46 | 67 | 749.10 GWh |
Idaho | # 43 | 126 | 1,488.21 GWh |
Illinois | # 4 | 332 | 15,592.21 GWh |
Indiana | # 12 | 201 | 8,849.97 GWh |
Iowa | # 20 | 279 | 6,323.45 GWh |
Kansas | # 25 | 157 | 5,176.23 GWh |
Kentucky | # 24 | 56 | 5,180.56 GWh |
Louisiana | # 18 | 81 | 6,708.43 GWh |
Maine | # 45 | 157 | 1,313.29 GWh |
Maryland | # 39 | 179 | 2,427.73 GWh |
Massachusetts | # 42 | 597 | 1,608.56 GWh |
Michigan | # 10 | 263 | 9,898.87 GWh |
Minnesota | # 26 | 736 | 5,082.27 GWh |
Mississippi | # 19 | 53 | 6,374.07 GWh |
Missouri | # 21 | 116 | 5,776.95 GWh |
State | Rank | Active Plants | Mar 2025 Generation |
---|---|---|---|
Montana | # 40 | 67 | 2,309.70 GWh |
Nebraska | # 37 | 117 | 3,008.88 GWh |
Nevada | # 34 | 109 | 3,381.98 GWh |
New Hampshire | # 44 | 56 | 1,374.49 GWh |
New Jersey | # 28 | 371 | 4,514.07 GWh |
New Mexico | # 35 | 138 | 3,378.20 GWh |
New York | # 8 | 818 | 10,278.94 GWh |
North Carolina | # 11 | 877 | 9,080.20 GWh |
North Dakota | # 33 | 57 | 3,690.67 GWh |
Ohio | # 6 | 190 | 11,252.37 GWh |
Oklahoma | # 17 | 129 | 6,972.70 GWh |
Oregon | # 22 | 254 | 5,543.74 GWh |
Pennsylvania | # 2 | 237 | 19,658.43 GWh |
Rhode Island | # 47 | 94 | 622.24 GWh |
South Carolina | # 14 | 194 | 8,606.12 GWh |
South Dakota | # 41 | 52 | 1,945.10 GWh |
Tennessee | # 23 | 85 | 5,241.09 GWh |
Texas | # 1 | 818 | 43,194.33 GWh |
Utah | # 36 | 114 | 3,056.84 GWh |
Vermont | # 49 | 112 | 230.44 GWh |
Virginia | # 15 | 214 | 8,465.83 GWh |
Washington | # 13 | 127 | 8,662.62 GWh |
West Virginia | # 38 | 36 | 2,977.95 GWh |
Wisconsin | # 27 | 222 | 4,571.79 GWh |
Wyoming | # 32 | 69 | 3,817.24 GWh |