Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2010 | Dec 2024 | Solar |
| American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.9 GWh | Aug 2019 | Dec 2024 | Solar |
| Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 18.1 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2018 | Dec 2024 | Solar |
| Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 6.6 GWh | Jan 2017 | Dec 2024 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.0 GWh | May 2021 | Dec 2024 | Solar |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2021 | Dec 2024 | Solar |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.3 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 11.2 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 37.6 GWh | May 2017 | Dec 2024 | Natural Gas |
| Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 75.4 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 1.8 TWh | Jan 2020 | Mar 2026 | Natural Gas |
| AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 1.2 TWh | Jan 2020 | Mar 2026 | Natural Gas |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 205.5 GWh | Nov 2023 | Mar 2026 | Wind |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.3 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Jan 2017 | Dec 2024 | Natural Gas |
| Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
| Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 8.0 GWh | Nov 2018 | Dec 2024 | Natural Gas |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.6 GWh | Jun 2018 | Dec 2024 | Natural Gas |
| Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 36.8 GWh | Nov 2020 | Mar 2026 | Solar |
| Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 109.1 GWh | Nov 2020 | Mar 2026 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 663.5 GWh | Aug 2021 | Mar 2026 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Oct 2022 | Dec 2024 | Solar |
| ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 8.0 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.1 GWh | Jul 2022 | Dec 2024 | Wind |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 282.7 GWh | Oct 2019 | Mar 2026 | Solar |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2024 | Solar |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2024 | Solar |
| County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 369.3 GWh | Nov 2020 | Mar 2026 | Solar |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 234.7 GWh | Nov 2020 | Mar 2026 | Solar |
| HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 11.5 GWh | May 2019 | Dec 2024 | Solar |
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 398.9 GWh | Oct 2020 | Mar 2026 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 239.5 GWh | Jul 2019 | Mar 2026 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Feb 2017 | Dec 2024 | Solar |
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2018 | Dec 2024 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2018 | Dec 2024 | Solar |
| Green Beanworks D PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 4.1 GWh | Jul 2018 | Dec 2024 | Solar |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 134.1 GWh | Oct 2017 | Mar 2026 | Wind |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 399.3 GWh | Dec 2019 | Mar 2026 | Solar |
| Wistaria Ranch Solar | Consolidated Edison Development Inc. | Calexico, CA | California Independent System Operator (CISO) | 286.6 GWh | Nov 2018 | Mar 2026 | Solar |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.5 GWh | Apr 2018 | Dec 2024 | Solar |
| Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.1 GWh | Nov 2018 | Dec 2024 | Solar |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2015 | Dec 2024 | Solar |
| ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.9 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2017 | Dec 2024 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2016 | Dec 2024 | Solar |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.1 GWh | Jun 2017 | Dec 2024 | Solar |
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 250.5 GWh | Nov 2018 | Mar 2026 | Solar |
| Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 57.7 GWh | Aug 2019 | Dec 2024 | Solar |
| CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2013 | Dec 2024 | Solar |
| CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Green Beanworks C PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 5.1 GWh | Jul 2018 | Dec 2024 | Solar |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2024 | Wind |
| Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 80.9 GWh | Nov 2018 | Dec 2024 | Wind |
| Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 6.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 123.1 GWh | Nov 2018 | Mar 2026 | Wind |
| One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 6.1 GWh | Aug 2017 | Dec 2024 | Solar |
| Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
| Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 451.8 GWh | Nov 2018 | Mar 2026 | Wind |
| Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2018 | Dec 2024 | Solar |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 670.4 GWh | Oct 2018 | Mar 2026 | Solar |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2018 | Dec 2024 | Wind |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 52.6 GWh | Feb 2018 | Dec 2024 | Solar |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 112.8 GWh | Apr 2023 | Mar 2026 | Solar |
| Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.0 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| Central Antelope Dry Ranch C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 33.3 GWh | Apr 2016 | Dec 2024 | Solar |
| Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 105.3 GWh | Nov 2016 | Mar 2026 | Solar |
| Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 37.4 GWh | Apr 2015 | Dec 2024 | Solar |
| Frontier Solar LLC | Boralex US Operations LLC | Newman, CA | California Independent System Operator (CISO) | 38.6 GWh | May 2016 | Dec 2024 | Solar |
| Kettleman Solar -Centaurus | Boralex US Operations LLC | Kettleman City, CA | California Independent System Operator (CISO) | 40.7 GWh | Jun 2015 | Dec 2024 | Solar |
| Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2016 | Dec 2024 | Solar |
| Silicon Valley Clean Water | Silicon Valley Clean Water | Redwood City, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2015 | Dec 2024 | Other Biomass Gas : 71.4% Natural Gas : 28.6% |
| Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.0 GWh | Jul 2014 | Dec 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |