| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2017 | Dec 2025 | Solar |
| Medline Ind. Phase 2 Tracy | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Aug 2025 | Solar |
| Niagara Bottling Stockton | ClearGen LLC | Stockton, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2017 | Dec 2025 | Solar |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | SCV Water | Santa Clara, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2014 | Oct 2025 | Solar |
| IOS II-LAX9 | Madison Energy Holdings LLC | Fontana, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2025 | Solar |
| Sierra Pacific Industries (2042-RD) | Sierra Pacific Industries | Red Bluff, CA | California Independent System Operator (CISO) | 16.7 GWh | Apr 2020 | Dec 2025 | Solar |
| DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2020 | Dec 2024 | Solar |
| Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2024 | Solar |
| Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Central CA Fuel Cell 1, LLC | Cordia | Tulare, CA | California Independent System Operator (CISO) | 13.2 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| Sun Streams 2 | Sun Streams 2, LLC | Hassayampa, AZ | California Independent System Operator (CISO) | 307.8 GWh | May 2021 | Jun 2026 | Solar |
| RE-VFO LLC | RE-VFO LLC | Visalia, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2009 | Dec 2025 | Solar |
| Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 218.9 GWh | Feb 2021 | Jun 2026 | Wind |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 39.0 GWh | May 2017 | Dec 2025 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 15.5 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 10.9 GWh | Mar 2017 | Dec 2025 | Natural Gas |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.7 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 17.8 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2025 | Solar |
| Hellyer Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 241.0 MWh | Jul 2017 | Dec 2025 | Solar |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 36.3 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.8 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 234.5 GWh | Nov 2020 | Jun 2026 | Solar |
| Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 75.7 GWh | Oct 2017 | Dec 2025 | Natural Gas |
| Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 321.0 GWh | Nov 2020 | Jun 2026 | Solar |
| County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2025 | Solar |
| Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 6.9 GWh | Jan 2017 | Dec 2025 | Solar |
| AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 1.7 TWh | Jan 2020 | May 2026 | Natural Gas |
| AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 1.1 TWh | Jan 2020 | May 2026 | Natural Gas |
| Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2025 | Solar |
| Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 6.0 GWh | Jun 2019 | Dec 2025 | Other Biomass Gas |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Mar 2025 | Solar |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 189.1 GWh | Nov 2023 | Jun 2026 | Wind |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2018 | Dec 2025 | Solar |
| Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2018 | Dec 2025 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 7.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Feb 2017 | Dec 2025 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2017 | Dec 2025 | Solar |
| Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 372.7 GWh | Oct 2020 | Apr 2026 | Solar |
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 208.6 GWh | Jul 2019 | Jun 2026 | Solar |
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 8.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2018 | Dec 2025 | Solar |
| ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 7.7 GWh | Mar 2017 | Dec 2025 | Natural Gas |
| Malech Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.6 GWh | Sep 2017 | Dec 2025 | Solar |
| American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.0 GWh | Aug 2019 | Dec 2025 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | May 2021 | Dec 2025 | Solar |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.2 GWh | May 2021 | Dec 2025 | Solar |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.7 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| HL Solar (Lassen) | Madison Energy Investments LLC | Wendel, CA | California Independent System Operator (CISO) | 12.2 GWh | May 2019 | Dec 2025 | Solar |
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.6 GWh | Jul 2022 | Dec 2025 | Wind |
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2019 | Dec 2025 | Solar |
| PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2018 | Dec 2025 | Solar |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.4 GWh | Jan 2017 | Dec 2025 | Natural Gas |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 270.4 GWh | Oct 2019 | Jun 2026 | Solar |
| Aquamarine | Aqua | Lemoore, CA | California Independent System Operator (CISO) | 648.1 GWh | Aug 2021 | Jun 2026 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 49.2 GWh | Aug 2023 | Dec 2025 | Solar |
| Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 106.6 GWh | Nov 2020 | Jun 2026 | Solar |
| Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 39.2 GWh | Nov 2020 | Jun 2026 | Solar |
| Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 20.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 24.8 GWh | Jun 2018 | Dec 2025 | Natural Gas |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.4 GWh | Nov 2018 | Dec 2025 | Natural Gas |
| Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 2019 | Dec 2025 | Other Biomass Gas |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2018 | Dec 2025 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.6 GWh | Oct 2022 | Dec 2025 | Solar |
| National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.6 GWh | May 2015 | Dec 2025 | Solar |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 219.8 GWh | Dec 2018 | Jun 2026 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.9 GWh | Jul 2016 | Dec 2025 | Solar |
| CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2016 | Dec 2025 | Solar |
| NLP Granger | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.5 GWh | Aug 2016 | Dec 2025 | Solar |
| CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 54.2 GWh | Feb 2017 | Dec 2025 | Solar |
| SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 14.2 GWh | Sep 2017 | Dec 2025 | Solar |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2019 | Dec 2025 | Solar |
| Sun Streams, LLC | EDP Renewables North America LLC | Arlington, AZ | California Independent System Operator (CISO) | 369.0 GWh | Dec 2019 | Jun 2026 | Solar |
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 55.9 GWh | Jun 2016 | Dec 2025 | Solar |
| Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.0 GWh | Aug 2017 | Dec 2025 | Solar |
| Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2017 | Dec 2025 | Solar |
| Valley Center | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2016 | Dec 2025 | Solar |
| NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 25.7 GWh | Feb 2017 | Dec 2025 | Solar |
| Solar Star California, XLIV, LLC | MN8 Energy LLC | Pearblossom, CA | California Independent System Operator (CISO) | 22.6 GWh | Nov 2016 | Dec 2025 | Solar |
| RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 56.7 GWh | Aug 2016 | Dec 2025 | Solar |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 46.3 GWh | Jun 2017 | Dec 2025 | Solar |
| Mesquite Solar 2, LLC | RWE Clean Energy | Tonopah, AZ | California Independent System Operator (CISO) | 253.7 GWh | Nov 2016 | Jun 2026 | Solar |
| Mesquite Solar 3, LLC | RWE Clean Energy | Tonopah, AZ | California Independent System Operator (CISO) | 443.8 GWh | Nov 2016 | Jun 2026 | Solar |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 52.7 GWh | Jan 2017 | Dec 2025 | Solar |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 28.6 GWh | Jan 2017 | Dec 2025 | Solar |
| Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 40.7 GWh | Mar 2017 | Dec 2025 | Solar |
| White Wing Solar | Leeward Asset Management, LLC | Yuma, AZ | California Independent System Operator (CISO) | 451.0 GWh | Sep 2024 | Jun 2026 | Solar |
| Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 2.1 GWh | Jan 2017 | Dec 2025 | Solar |
| Waterman Turnout Hydroelectric | San Bernardino Valley Mun. Water Dist. | San Bernardino, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2024 | Dec 2025 | Water |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 138.1 GWh | Nov 2016 | Jun 2026 | Solar |
| Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 345.6 GWh | Nov 2019 | Jun 2026 | Wind |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.7 GWh | Apr 2017 | Dec 2025 | Solar |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2017 | Dec 2025 | Solar |
| RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 509.7 GWh | Oct 2016 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |