CSU Long Beach Lots 7 & 14
1250 Bellflower Blvd, Long Beach, CA 90840Plant Summary Information
CSU Long Beach Lots 7 & 14 is ranked #390 out of 885 solar farms in California in terms of total annual net electricity generation.
CSU Long Beach Lots 7 & 14 generated 1.3 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | CSU Long Beach Lots 7 & 14 |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Los Angeles County, CA |
| Initial Operation Date | December 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 7.2 GWh |
| Annual Consumption | 25.4 k MMBtu |
| Ranked #7,342 out of 13,081 Power Plants Nationwide | |
| Ranked #2,835 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #959 out of 1,606 California Power Plants | |
| Ranked #390 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Solar Star California XLVII, LLC (2018 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2025) |
Map of CSU Long Beach Lots 7 & 14
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CSU Long Beach Lots 7 & 14.
Monthly Net Generation for CSU Long Beach Lots 7 & 14
Monthly Plant Fuel Consumption for CSU Long Beach Lots 7 & 14
CSU Long Beach Lots 7 & 14 Details
| Summary Information | |
|---|---|
| Plant Name | CSU Long Beach Lots 7 & 14 (62028) |
| Plant Address | 1250 Bellflower Blvd, Long Beach, CA 90840 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 33.78104, -118.11357 |
| Generation Dates on File | Jan 2018 to Dec 2025 |
| Initial Operation Date | December 2017 |
| Annual Generation | 7.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 18-341 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator CSULB Details Operating December 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 4.5 MW |
| Summer Capacity | 3.3 MW |
| Winter Capacity | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 4.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
CSU Long Beach Lots 7 & 14 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Regions Bank | 1900 5th Avenue North, 24th Floor, Birmingham, AL 35203 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2825 | Arcadia Solar | Arcadia, WI | 7.2 GWh |
| #2826 | SR Kersey | Kersey, CO | 7.2 GWh |
| #2827 | Broadhead | Waterville, ME | 7.2 GWh |
| #2828 | Branch Solar Farm | Branch, AR | 7.2 GWh |
| #2829 | Bantam Solar | Saint Johnsville, NY | 7.2 GWh |
| #2830 | Monticello Project CSG | Monticello, MN | 7.2 GWh |
| #2831 | Martin Solar Center | Kents Store, VA | 7.2 GWh |
| #2832 | ME Novel Lighthouse - Carrabassett | Carrabassett Valley, ME | 7.2 GWh |
| #2833 | River Valley LLC (NY) (CSG) | Olean, NY | 7.2 GWh |
| #2834 | Old Mill Solar | Bly, OR | 7.2 GWh |
| #2836 | SR Warren, LLC | Franklin, KY | 7.2 GWh |
| #2837 | Watervliet PV | Watervliet, MI | 7.2 GWh |
| #2838 | Water Street Solar | Randolph, ME | 7.2 GWh |
| #2839 | Arthur Solar, LLC | Tabor City, NC | 7.1 GWh |
| #2840 | Sullivan Solar, LLC | Sullivan, IN | 7.1 GWh |
| #2841 | Samarcand Solar Farm, LLC | Biscoe, NC | 7.1 GWh |
| #2842 | St. Pauls Solar 1, LLC | St. Pauls, NC | 7.1 GWh |
| #2843 | Saratoga Solar LLC | Milton, NY | 7.1 GWh |
| #2844 | Blanchard Road 1 Community Solar | Clayton, NY | 7.1 GWh |
| #2845 | Amazon JFK8 Solar Project | Staten Island, NY | 7.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CSU Long Beach Lots 7 & 14.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AES Alamitos Energy Center | Long Beach, CA | 1.1 TWh | 1.2 mi |
| AES Alamitos LLC | Long Beach, CA | 28.2 GWh | 1.1 mi |
| Barre Peaker | Stanton, CA | 5.4 GWh | 7.7 mi |
| BCE Los Alamitos 1 | Los Alamitos, CA | 19.1 GWh | 2.9 mi |
| BCE Seal Beach | Seal Beach, CA | 7.6 GWh | 5.2 mi |
| City of Long Beach Airport Lot A & B | Long Beach, CA | 3.4 GWh | 2.8 mi |
| Colon PV | Wilmington, CA | 1.2 GWh | 8 mi |
| CPA 2132 E Dominguez | Carson, CA | 913.0 MWh | 7.8 mi |
| CPA Wilmington 1 | Carson, CA | 1.1 GWh | 8.1 mi |
| Equilon Los Angeles Refining | Wilmington, CA | 239.9 GWh | 7 mi |
| Harbor Cogen | Wilmington, CA | 9.3 GWh | 6.7 mi |
| Haynes | Long Beach, CA | 1.3 TWh | 1.4 mi |
| Long Beach Generation | Long Beach, CA | 10.3 GWh | 6.5 mi |
| Signal Hill West Unit | Signal Hill, CA | 38.9 GWh | 4.1 mi |
| Stanton Energy Reliability Center Hybrid | Stanton, CA | 3.6 GWh | 7.6 mi |
| THUMS | Long Beach, CA | 158.2 GWh | 5.8 mi |
| Toyota Long Beach Trigen | Long Beach, CA | 16.8 GWh | 6.3 mi |
| Valero Wilmington Cogeneration Plant | Wilmington, CA | 211.3 GWh | 7.2 mi |
| Watson Cogeneration | Carson, CA | 2.4 TWh | 7.9 mi |
| Wilmington Hydrogen Plant | Wilmington, CA | 179.0 GWh | 7.3 mi |