CSU Long Beach Lots 7 & 14
1250 Bellflower Blvd, Long Beach, CA 90840Plant Summary Information
CSU Long Beach Lots 7 & 14 is ranked #371 out of 849 solar farms in California in terms of total annual net electricity generation.
CSU Long Beach Lots 7 & 14 generated 1.1 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | CSU Long Beach Lots 7 & 14 |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Los Angeles County, CA |
| Initial Operation Date | December 2017 |
| Last Update | Dec 2024 |
| Annual Generation | 6.9 GWh |
| Annual Consumption | 24.6 k MMBtu |
| Ranked #7,281 out of 12,539 Power Plants Nationwide | |
| Ranked #2,672 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #992 out of 1,600 California Power Plants | |
| Ranked #371 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Solar Star California XLVII, LLC (2018 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2024) |
Map of CSU Long Beach Lots 7 & 14
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CSU Long Beach Lots 7 & 14.
Monthly Net Generation for CSU Long Beach Lots 7 & 14
CSU Long Beach Lots 7 & 14 Details
| Summary Information | |
|---|---|
| Plant Name | CSU Long Beach Lots 7 & 14 (62028) |
| Plant Address | 1250 Bellflower Blvd, Long Beach, CA 90840 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 33.78104, -118.11357 |
| Generation Dates on File | Jan 2018 to Dec 2024 |
| Initial Operation Date | December 2017 |
| Annual Generation | 6.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 18-341 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator CSULB Details Operating December 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4.5 MW |
| Summer Capacity | 3.3 MW |
| Winter Capacity | 1.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 4.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
CSU Long Beach Lots 7 & 14 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2662 | Source Power NY III - Medina II (CSG) | Medina, NY | 6.9 GWh |
| #2663 | State Highway 17B Solar | Bethel, NY | 6.9 GWh |
| #2664 | Crestwood Solar Center LLC | Oxford, NC | 6.9 GWh |
| #2665 | Rice Lake Solar Array | Rice Lake, WI | 6.9 GWh |
| #2666 | Ravenbrook | Carver, MA | 6.9 GWh |
| #2667 | Riley Road LLC | New Windsor, NY | 6.9 GWh |
| #2668 | ZPD-PT Solar Project 2017-038 Hybrid LLC | Lancaster, MA | 6.8 GWh |
| #2669 | Iron Horse Solar 4, LLC | North Billerica, MA | 6.9 GWh |
| #2670 | American Canyon Solar | American Canyon, CA | 6.9 GWh |
| #2671 | Kearsarge Concord II | Concord, MA | 6.9 GWh |
| #2673 | CED Northampton Solar LLC Hybrid | Northampton, MA | 6.8 GWh |
| #2674 | Overlook | Westminster, MA | 6.9 GWh |
| #2675 | Plott Hound Solar | New Bern, NC | 6.9 GWh |
| #2676 | Summit - Cicero | Brewerton, NY | 6.9 GWh |
| #2677 | Amaterasu LLC | Lancaster, MA | 6.8 GWh |
| #2678 | Glenville Solar (CSG) | Glenville, NY | 6.9 GWh |
| #2679 | Tift Boyd | Tifton, GA | 6.9 GWh |
| #2680 | IOS - ERW9 | Carteret, NJ | 6.9 GWh |
| #2681 | River Ranch Dairy | Hanford, CA | 6.9 GWh |
| #2682 | Carrizozo Solar | Carrizozo, NM | 6.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CSU Long Beach Lots 7 & 14.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AES Alamitos Energy Center | Long Beach, CA | 1.9 TWh | 1.2 mi |
| AES Alamitos LLC | Long Beach, CA | 38.3 GWh | 1.1 mi |
| Barre Peaker | Stanton, CA | 12.7 GWh | 7.7 mi |
| BCE Los Alamitos 1 | Los Alamitos, CA | 19.1 GWh | 2.9 mi |
| BCE Los Alamitos 2 | Los Alamitos, CA | 3.4 GWh | 3.6 mi |
| City of Long Beach Airport Lot A & B | Long Beach, CA | 2.8 GWh | 2.8 mi |
| Colon PV | Wilmington, CA | 1.2 GWh | 8 mi |
| Dominguez Plant | Long Beach, CA | 13.7 GWh | 8.2 mi |
| Equilon Los Angeles Refining | Wilmington, CA | 283.8 GWh | 7 mi |
| Harbor Cogen | Wilmington, CA | 17.4 GWh | 6.7 mi |
| Haynes | Long Beach, CA | 1.6 TWh | 1.4 mi |
| Long Beach Generation LLC | Long Beach, CA | 10.3 GWh | 6.5 mi |
| Signal Hill West Unit | Signal Hill, CA | 39.7 GWh | 4.1 mi |
| Southeast Resource Recovery | Long Beach, CA | 89.9 GWh | 7.4 mi |
| Stanton Energy Reliability Center Hybrid | Stanton, CA | 1.7 GWh | 7.6 mi |
| THUMS | Long Beach, CA | 206.9 GWh | 5.8 mi |
| Toyota Long Beach Trigen | Long Beach, CA | 16.8 GWh | 6.3 mi |
| Valero Wilmington Cogeneration Plant | Wilmington, CA | 228.2 GWh | 7.2 mi |
| Watson Cogeneration | Carson, CA | 2.3 TWh | 7.9 mi |
| Wilmington Hydrogen Plant | Wilmington, CA | 139.7 GWh | 7.3 mi |