Fresno Hoover High School Hybrid

5550 N First Street, Fresno, CA 93710

Plant Summary Information

Fresno Hoover High School Hybrid is ranked #651 out of 818 solar farms in California in terms of total annual net electricity generation.

Fresno Hoover High School Hybrid generated 327.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameFresno Hoover High School Hybrid
Utility NameForefront Power, LLC
LocationFresno County, CA
Initial Operation DateMarch 2020
Last Update Dec 2023
Annual Generation 2.1 GWh
Annual Consumption 7.4 k MMBtu
Ranked #10,189 out of 12,312 Power Plants Nationwide
Ranked #5,016 out of 6,191 Solar Power Plants Nationwide
Ranked #1,367 out of 1,568 California Power Plants
Ranked #651 out of 818 California Solar Power Plants
Fuel Types Solar : 99.3% Electricity used for energy storage : 0.7%

Map of Fresno Hoover High School Hybrid

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Hoover High School Hybrid.

Create Your Account Today

Monthly Net Generation for Fresno Hoover High School Hybrid

300300240240180180120120606000Jul '20Jul '2020212021Jul '21Jul '2120222022Jul '22Jul '2220232023Jul '23Jul '23
Download SVG
Download PNG
Download CSV

Fresno Hoover High School Hybrid Details

Summary Information
Plant NameFresno Hoover High School Hybrid (63421)
Plant Address5550 N First Street, Fresno, CA 93710
UtilityForefront Power, LLC (62856)
Latitude, Longitude36.81782, -119.77071
Generation Dates on FileMar 2020 to Dec 2023
Initial Operation DateMarch 2020
Annual Generation 2.1 GWh
Fuel Types Solar : 99.3% Electricity used for energy storage : 0.7%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number22-388-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 21.00 kV
Energy StorageYes

Generator 291 Details Operating March 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.2 MW
Summer Capacity1.2 MW
Winter Capacity1.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
East West Fixed TiltYes
Azimuth Angle270
Tilt Angle7
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.4 MW
Virtual Net Metering AgreementNo

Generator BA291 Details Operating March 2020

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity0.2 MW
Summer Capacity0.2 MW
Winter Capacity0.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Energy Storage Details
Nameplate Energy Capacity MWH0.2
Maximum Charge Rate0.2 MW
Maximum Discharge Rate0.2 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.2
Storage Enclosure TypeCS
System Peak ShavingP
Excess Wind And Solar GenerationYes
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id63421
Direct Support Gen Id291
Support T D AssetNo

Fresno Hoover High School Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5006MN Buffalo Lake 212-1 LLC (CSG)Buffalo Lake, MN2.1 GWh
#5007FELPS 6- Floresville WestFloresville, TX2.1 GWh
#5008FELPS 7- Floresville WestFloresville, TX2.1 GWh
#5009Broadalbin-Perth SolarAmsterdam, NY2.1 GWh
#5010Bloomfield Municipal Utilities SolarBloomfield, IA2.1 GWh
#5011Iris Solar, LLC (MN)Nicollet, MN2.1 GWh
#5012Spruce - WCMD - CreekHagerstown, MD2.1 GWh
#5013Novel Denzer Solar LLC CSGMinnesota City, MN2.1 GWh
#5014Westport Community Solar, LLCLake Lillian, MN2.1 GWh
#5015USS All In Solar LLC CSGHartland, MN2.1 GWh
#5017Plato CSG1, LLCGlencoe, MN2.1 GWh
#5018Novel Huneke Solar LLC CSGZumbrota, MN2.1 GWh
#5019ENGIE 2020 ProjectCo-WI1 LLCFond Du Lac, WI2.1 GWh
#5020Sand Lake DPC SolarCenturia, WI2.1 GWh
#5021OgemaOgema, WI2.1 GWh
#5022Fond du Lac Community SolarFond Du Lac, WI2.1 GWh
#5023Winona SolarAltura, MN2.1 GWh
#5024Sacramento Point West Medical OfficesSacramento, CA2.1 GWh
#5025Agawam SolarAgawam, MA2.1 GWh
#5026T Luhman CSGZumbrota, MN2.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Fresno Hoover High School Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Borden Solar FarmMadera, CA112.0 GWh13.5 mi
CA - Fresno County - Juvenile HallFresno, CA552.0 MWh11.1 mi
Clovis East High SchoolClovis, CA1.5 GWh7.3 mi
Clovis High SchoolClovis, CA826.0 MWh4.9 mi
Clovis North High SchoolFresno, CA1.5 GWh5.3 mi
CSU Fresno Solar ProjectFresno, CA1.4 GWh1.7 mi
Fresno Bullard High School HybridFresno, CA2.2 GWh2.2 mi
Fresno Community SolarFresno, CA15.4 GWh10.5 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh6.5 mi
Friant Hydro FacilityFriant, CA59.8 GWh13 mi
Gap Pacific Distribution CenterFresno, CA5.4 GWh4.3 mi
JD Foods - JD FoodsFresno, CA455.0 MWh8.1 mi
La Joya Del SolFresno, CA1.4 GWh9.7 mi
Malaga Power LLCFresno, CA15.9 GWh9 mi
OK Produce Fresno CarportFresno, CA3.6 GWh6.5 mi
Pacific Ethanol Madera Solar ArrayMadera, CA1.6 GWh13 mi
Rio Bravo FresnoFresno, CA108.4 GWh9.3 mi
Saint Agnes Medical CenterFresno, CA27.7 GWh1.2 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh5.1 mi
SCCCD - Fresno Community CollegeFresno, CA3.8 GWh3.9 mi