Reedley Community College Solar

995 N Reed Ave, Reedley, CA 93654

Plant Summary Information

Reedley Community College Solar is ranked #444 out of 765 solar farms in California in terms of total annual net electricity generation.

Reedley Community College Solar generated 1.0 GWh during the 3-month period between September 2022 to December 2022.

Plant NameReedley Community College Solar
Utility NameForefront Power, LLC
LocationFresno County, CA
Initial Operation DateDecember 2018
Last Update Dec 2022
Annual Generation 4.1 GWh
Annual Consumption 14.7 k MMBtu
Ranked #8,036 out of 11,471 Power Plants Nationwide
Ranked #2,976 out of 5,188 Solar Power Plants Nationwide
Ranked #1,127 out of 1,545 California Power Plants
Ranked #444 out of 765 California Solar Power Plants
Fuel Types Solar

Map of Reedley Community College Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Reedley Community College Solar.

Create Your Account Today

Monthly Net Generation for Reedley Community College Solar

Reedley Community College Solar Details

Summary Information
Plant NameReedley Community College Solar (63074)
Plant Address995 N Reed Ave Reedley, CA 93654
UtilityForefront Power, LLC (62856)
Latitude, Longitude36.60563, -119.4577
Generation Dates on FileJan 2019 to Dec 2022
Initial Operation DateDecember 2018
Annual Generation 4.1 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number19-553-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 21.00 kV
Energy StorageNo

Generator 234 Details Operating December 2018

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.6 MW
Summer Capacity2.6 MW
Winter Capacity2.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2018
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Single Axis TrackingNo
Fixed TiltYes
Azimuth Angle180
Tilt Angle7
DC Net Capacity2.8 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.8 MW
Virtual Net Metering AgreementNo

Reedley Community College Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2966Bullhead Solar, LLCFayette, MI4.1 GWh
#2967FLS Solar 170, LLCLumberton, NC4.1 GWh
#2968AGA TAG Solar III LLCSpartanburg, SC4.1 GWh
#2969WolfcastleDekalb, IL4.1 GWh
#2970Wadesboro 4Wadesboro, NC4.1 GWh
#2971Panda Solar NC 4, LLCClarkton, NC4.1 GWh
#2972Old Caroleen Solar FarmForest City, NC4.1 GWh
#2973Hastings Community Solar FarmHastings, NE4.1 GWh
#2974Lakeville SolarLakeville, MA4.1 GWh
#2975Manalapan Village SolarManalapan, NJ4.1 GWh
#2977Lockheed Martin SolarOrlando, FL4.1 GWh
#2978Vaca Dixon Solar StationVacaville, CA4.1 GWh
#2979Sampson SolarRoseboro, NC4.1 GWh
#2980Thanksgiving Fire Solar Farm, LLCZebulon, NC4.1 GWh
#2981Segunda II (CSG)Streator, IL4.1 GWh
#2982Woodbury SolarWoodbury, MN4.1 GWh
#2983Oak Leaf Solar XXXIII LLC (Lantz)Salida, CO4.1 GWh
#2984Washington St Community Solar Farm #4Ogden, NY4.1 GWh
#2985Actus Lend Lease DMAFBTucson, AZ4.1 GWh
#2986Town of Burrillville Solar CSGBurrillville, RI4.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Reedley Community College Solar.

Plant NamePlant LocationAnnual GenerationDistance
2081 Terzian Solar ProjectReedley, CA3.1 GWh5 mi
Algonquin Power Sanger LLCSanger, CA3.2 GWh7.5 mi
CA - Fresno County - Juvenile HallFresno, CA6.3 GWh15.4 mi
Clovis East High SchoolClovis, CA1.6 GWh16.8 mi
Dinuba Wastewater Treatment PlantDinuba, CA1.5 GWh5 mi
Dover DairyHanford, CA2.0 GWh14.2 mi
Fresno Sunnyside High School HybridFresno, CA2.6 GWh16.9 mi
FTF-PackingShedReedley, CA534.4 MWh4.3 mi
Kings River SyphonSanger, CA1.3 GWh11 mi
Kingsburg CogenKingsburg, CA14.3 GWh8.1 mi
Kingsburg SolarKingsburg, CA6.7 GWh8.3 mi
Malaga Power LLCFresno, CA10.0 GWh16.7 mi
MM Tulare EnergyVisalia, CA8.8 GWh15.4 mi
Moonlight Packing - Phase 2Reedley, CA2.9 GWh1.5 mi
National RaisinFowler, CA5.1 GWh12 mi
Pine FlatPiedra, CA759.1 GWh17.3 mi
POM Beverage SolarDel Rey, CA740.0 MWh15.9 mi
POM Juice SolarFresno, CA150.0 MWh15.9 mi
Rio Bravo FresnoFresno, CA149.8 GWh15.8 mi
Still Water PowerHanford, CA1.7 GWh14.8 mi