Reedley Community College Solar

995 N Reed Ave, Reedley, CA 93654

Plant Summary Information

Reedley Community College Solar is ranked #466 out of 816 solar farms in California in terms of total annual net electricity generation.

Reedley Community College Solar generated 622.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameReedley Community College Solar
Utility NameForefront Power, LLC
LocationFresno County, CA
Initial Operation DateDecember 2018
Last Update Dec 2023
Annual Generation 4.0 GWh
Annual Consumption 14.1 k MMBtu
Ranked #8,454 out of 12,288 Power Plants Nationwide
Ranked #3,496 out of 6,174 Solar Power Plants Nationwide
Ranked #1,147 out of 1,564 California Power Plants
Ranked #466 out of 816 California Solar Power Plants
Fuel Types Solar

Map of Reedley Community College Solar

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Reedley Community College Solar.

Create Your Account Today

Monthly Net Generation for Reedley Community College Solar

50050040040030030020020010010000Jul '19Jul '1920202020Jul '20Jul '2020212021Jul '21Jul '2120222022Jul '22Jul '2220232023Jul '23Jul '23
Download SVG
Download PNG
Download CSV

Reedley Community College Solar Details

Summary Information
Plant NameReedley Community College Solar (63074)
Plant Address995 N Reed Ave, Reedley, CA 93654
UtilityForefront Power, LLC (62856)
Latitude, Longitude36.60563, -119.4577
Generation Dates on FileJan 2019 to Dec 2023
Initial Operation DateDecember 2018
Annual Generation 4.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number19-553-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 21.00 kV
Energy StorageNo

Generator 234 Details Operating December 2018

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.6 MW
Summer Capacity2.6 MW
Winter Capacity2.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2018
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Single Axis TrackingNo
Fixed TiltYes
Azimuth Angle180
Tilt Angle7
DC Net Capacity2.8 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.8 MW
Virtual Net Metering AgreementNo

Reedley Community College Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3486CA-DGS RFP-Pleasant Valley State PrisonCoalinga, CA4.0 GWh
#3487Stoneheart Solar, LLCSaginaw, MI4.0 GWh
#3488St Louis SolarGervais, OR4.0 GWh
#3489Susquehanna University SolarSelinsgrove, PA4.0 GWh
#3490East Wayne Solar LLCGoldsboro, NC4.0 GWh
#3491Monson SolarMonson, MA4.0 GWh
#3492Crittenden Solar FacilityDry Ridge, KY4.0 GWh
#3493Cubera Solar, LLCDunn, NC4.0 GWh
#3494Sampson SolarRoseboro, NC4.0 GWh
#3495CED Beecher Sun SolarBeecher, IL4.0 GWh
#3497RamapoMahwah, NJ4.0 GWh
#3498Spring Prairie Solar WI, LLCBurlington, WI4.0 GWh
#3499Watts 3115Adelanto, CA4.0 GWh
#3500Hendershot Solar, LLCTecumseh, MI4.0 GWh
#3501Summit - OswegoOswego, NY4.0 GWh
#350213 Mile Solar, LLCBattle Creek, MI4.0 GWh
#3503DG AMP Solar Front RoyalFront Royal, VA4.0 GWh
#3504Interchange Solar, LLCMt. Morris, MI3.9 GWh
#3505Gloucester Community College SolarSewell, NJ3.9 GWh
#3506Abbot SolarManning, SC3.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Reedley Community College Solar.

Plant NamePlant LocationAnnual GenerationDistance
2081 Terzian Solar ProjectReedley, CA1.8 GWh5 mi
Agriculture Capital - Legacy PackingDinuba, CA3.9 GWh7.7 mi
Algonquin Power Sanger LLCSanger, CA10.0 GWh7.5 mi
Bob Wiley Detention CenterVisalia, CA2.8 GWh13.2 mi
CA - Fresno County - Juvenile HallFresno, CA552.0 MWh15.4 mi
Dinuba Wastewater Treatment PlantDinuba, CA1.4 GWh5 mi
Dover DairyHanford, CA2.7 GWh14.2 mi
FTF-PackingShedReedley, CA581.0 MWh4.3 mi
Kings River SyphonSanger, CA325.0 MWh11 mi
Kingsburg CogenKingsburg, CA11.0 GWh8.1 mi
Kingsburg SolarKingsburg, CA6.0 GWh8.3 mi
MM Tulare EnergyVisalia, CA9.7 GWh15.4 mi
Moonlight Packing - Phase 2Reedley, CA2.6 GWh1.5 mi
National RaisinFowler, CA4.8 GWh12 mi
North Juvenile Detention Center SolarVisalia, CA2.0 GWh12.6 mi
POM Juice SolarFresno, CA3.2 GWh15.9 mi
POM Plant 1Del Rey, CA5.2 GWh7.9 mi
POM Plant 2Del Rey, CA3.5 GWh8.2 mi
Rio Bravo FresnoFresno, CA108.4 GWh15.8 mi
Still Water PowerHanford, CA674.0 MWh14.8 mi