Reedley Community College Solar
995 N Reed Ave, Reedley, CA 93654Plant Summary Information
Reedley Community College Solar is ranked #444 out of 765 solar farms in California in terms of total annual net electricity generation.
Reedley Community College Solar generated 1.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Reedley Community College Solar |
---|---|
Utility Name | Forefront Power, LLC |
Location | Fresno County, CA |
Initial Operation Date | December 2018 |
Last Update | Dec 2022 |
Annual Generation | 4.1 GWh |
Annual Consumption | 14.7 k MMBtu |
Ranked #8,036 out of 11,471 Power Plants Nationwide | |
Ranked #2,976 out of 5,188 Solar Power Plants Nationwide | |
Ranked #1,127 out of 1,545 California Power Plants | |
Ranked #444 out of 765 California Solar Power Plants | |
Fuel Types | Solar |
Map of Reedley Community College Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Reedley Community College Solar.
Monthly Net Generation for Reedley Community College Solar
Reedley Community College Solar Details
Summary Information | |
---|---|
Plant Name | Reedley Community College Solar (63074) |
Plant Address | 995 N Reed Ave Reedley, CA 93654 |
Utility | Forefront Power, LLC (62856) |
Latitude, Longitude | 36.60563, -119.4577 |
Generation Dates on File | Jan 2019 to Dec 2022 |
Initial Operation Date | December 2018 |
Annual Generation | 4.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 19-553-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator 234 Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 7 |
DC Net Capacity | 2.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.8 MW |
Virtual Net Metering Agreement | No |
Reedley Community College Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2966 | Bullhead Solar, LLC | Fayette, MI | 4.1 GWh |
#2967 | FLS Solar 170, LLC | Lumberton, NC | 4.1 GWh |
#2968 | AGA TAG Solar III LLC | Spartanburg, SC | 4.1 GWh |
#2969 | Wolfcastle | Dekalb, IL | 4.1 GWh |
#2970 | Wadesboro 4 | Wadesboro, NC | 4.1 GWh |
#2971 | Panda Solar NC 4, LLC | Clarkton, NC | 4.1 GWh |
#2972 | Old Caroleen Solar Farm | Forest City, NC | 4.1 GWh |
#2973 | Hastings Community Solar Farm | Hastings, NE | 4.1 GWh |
#2974 | Lakeville Solar | Lakeville, MA | 4.1 GWh |
#2975 | Manalapan Village Solar | Manalapan, NJ | 4.1 GWh |
#2977 | Lockheed Martin Solar | Orlando, FL | 4.1 GWh |
#2978 | Vaca Dixon Solar Station | Vacaville, CA | 4.1 GWh |
#2979 | Sampson Solar | Roseboro, NC | 4.1 GWh |
#2980 | Thanksgiving Fire Solar Farm, LLC | Zebulon, NC | 4.1 GWh |
#2981 | Segunda II (CSG) | Streator, IL | 4.1 GWh |
#2982 | Woodbury Solar | Woodbury, MN | 4.1 GWh |
#2983 | Oak Leaf Solar XXXIII LLC (Lantz) | Salida, CO | 4.1 GWh |
#2984 | Washington St Community Solar Farm #4 | Ogden, NY | 4.1 GWh |
#2985 | Actus Lend Lease DMAFB | Tucson, AZ | 4.1 GWh |
#2986 | Town of Burrillville Solar CSG | Burrillville, RI | 4.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Reedley Community College Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2081 Terzian Solar Project | Reedley, CA | 3.1 GWh | 5 mi |
Algonquin Power Sanger LLC | Sanger, CA | 3.2 GWh | 7.5 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 6.3 GWh | 15.4 mi |
Clovis East High School | Clovis, CA | 1.6 GWh | 16.8 mi |
Dinuba Wastewater Treatment Plant | Dinuba, CA | 1.5 GWh | 5 mi |
Dover Dairy | Hanford, CA | 2.0 GWh | 14.2 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.6 GWh | 16.9 mi |
FTF-PackingShed | Reedley, CA | 534.4 MWh | 4.3 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 11 mi |
Kingsburg Cogen | Kingsburg, CA | 14.3 GWh | 8.1 mi |
Kingsburg Solar | Kingsburg, CA | 6.7 GWh | 8.3 mi |
Malaga Power LLC | Fresno, CA | 10.0 GWh | 16.7 mi |
MM Tulare Energy | Visalia, CA | 8.8 GWh | 15.4 mi |
Moonlight Packing - Phase 2 | Reedley, CA | 2.9 GWh | 1.5 mi |
National Raisin | Fowler, CA | 5.1 GWh | 12 mi |
Pine Flat | Piedra, CA | 759.1 GWh | 17.3 mi |
POM Beverage Solar | Del Rey, CA | 740.0 MWh | 15.9 mi |
POM Juice Solar | Fresno, CA | 150.0 MWh | 15.9 mi |
Rio Bravo Fresno | Fresno, CA | 149.8 GWh | 15.8 mi |
Still Water Power | Hanford, CA | 1.7 GWh | 14.8 mi |