National Raisin

626 S. 5th St., Fowler, CA 93625

Plant Summary Information

National Raisin is ranked #443 out of 849 solar farms in California in terms of total annual net electricity generation.

National Raisin generated 626.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameNational Raisin
Utility NameNational Raisin
LocationFresno County, CA
Initial Operation DateJune 2015
Last Update Dec 2024
Annual Generation 4.8 GWh
Annual Consumption 17.0 k MMBtu
Ranked #8,106 out of 12,539 Power Plants Nationwide
Ranked #3,250 out of 6,400 Solar Power Plants Nationwide
Ranked #1,111 out of 1,600 California Power Plants
Ranked #443 out of 849 California Solar Power Plants
Fuel Types Solar

Map of National Raisin

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for National Raisin.

Create Your Account Today

Monthly Net Generation for National Raisin

National Raisin Details

Summary Information
Plant NameNational Raisin (61894)
Plant Address626 S. 5th St., Fowler, CA 93625
UtilityNational Raisin (61510)
Latitude, Longitude36.62451, -119.67309
Generation Dates on FileJan 2018 to Dec 2024
Initial Operation DateJune 2015
Annual Generation 4.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeSupport Activities for Agriculture and Forestry (115)
Sector Industrial Non-CHP (6)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator CR1 Details Operating October 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity0.9 MW
Winter Capacity0.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2015
Combined Heat & Power No
Sector NameIndustrial Non-CHP (6)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity1.1 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.1 MW
Virtual Net Metering AgreementNo

Generator CR3 Details Operating October 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity0.6 MW
Summer Capacity0.5 MW
Winter Capacity0.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2015
Combined Heat & Power No
Sector NameIndustrial Non-CHP (6)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity0.7 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.7 MW
Virtual Net Metering AgreementNo

Generator CR2 Details Operating June 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity0.8 MW
Winter Capacity0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2015
Combined Heat & Power No
Sector NameIndustrial Non-CHP (6)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle225
Tilt Angle5
DC Net Capacity1.1 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.1 MW
Virtual Net Metering AgreementNo

Generator CR4 Details Operating June 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity0.3 MW
Summer Capacity0.3 MW
Winter Capacity0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2015
Combined Heat & Power No
Sector NameIndustrial Non-CHP (6)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle225
Tilt Angle5
DC Net Capacity0.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.4 MW
Virtual Net Metering AgreementNo

National Raisin Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3240Weymouth Solar PlantLa Verne, CA4.8 GWh
#3241IL West Hallock Project1Edelstein, IL4.8 GWh
#3242Orion Community SolarSt. Joseph, MN4.8 GWh
#3243Richardson SolarBarnswell, SC4.8 GWh
#3244CED Chicopee SolarChicopee, MA4.8 GWh
#3245Malech Solar FarmSan Jose, CA4.8 GWh
#3246AdamsPiedmont, SC4.8 GWh
#3247Livingston Solar CanopiesPiscataway, NJ4.8 GWh
#3248MariettaMarietta, OK4.8 GWh
#3249Springdale School DistrictSpringdale, AR4.8 GWh
#3251Beals Medina Solar LLC CSGMedina, NY4.8 GWh
#3252Soscol Ferry SolarNapa, CA4.8 GWh
#3253Armstrong SolarGlenwood, MN4.8 GWh
#3254NLP GrangerValley Center, CA4.8 GWh
#3255Dickinson SolarCarlisle, PA4.8 GWh
#3256West A&B Solar Project Hybrid CSGSouthbridge, MA4.7 GWh
#3257Kearsarge Bellingham PVBellingham, MA4.8 GWh
#3258Tides Lane FarmLouisburg, NC4.8 GWh
#3259PVN Milliken, LLCOntario, CA4.8 GWh
#3260Mainely Solar (Wyman Hill Solar LLC)Rumford, ME4.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding National Raisin.

Plant NamePlant LocationAnnual GenerationDistance
Algonquin Power Sanger LLCSanger, CA5.1 GWh7.9 mi
CA - Fresno County - Juvenile HallFresno, CA552.0 MWh3.9 mi
Clovis East High SchoolClovis, CA1.5 GWh12.2 mi
Clovis High SchoolClovis, CA826.0 MWh13.3 mi
Fresno Community SolarFresno, CA15.4 GWh12.7 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh8 mi
Gap Pacific Distribution CenterFresno, CA5.4 GWh11 mi
JD Foods - JD FoodsFresno, CA455.0 MWh6.7 mi
Kingsburg CogenKingsburg, CA11.0 GWh7.8 mi
Kingsburg SolarKingsburg, CA6.0 GWh11.1 mi
La Joya Del SolFresno, CA1.4 GWh7.8 mi
Malaga Power LLCFresno, CA12.3 GWh5.8 mi
Moonlight Packing - Phase 2Reedley, CA2.6 GWh11.6 mi
OK Produce Fresno CarportFresno, CA3.6 GWh8.8 mi
POM Plant 1Del Rey, CA5.2 GWh5.3 mi
POM Plant 2Del Rey, CA3.5 GWh5 mi
Reedley Community College SolarReedley, CA3.8 GWh12 mi
Rio Bravo FresnoFresno, CA108.4 GWh5.2 mi
SCCCD - Fresno Community CollegeFresno, CA2.8 GWh12 mi
Zonneveld Oak GroveLaton, CA2.8 GWh12.6 mi