Preferred Freezer San Leandro

400 Polar Way, San Leandro, CA 94577

Plant Summary Information

Preferred Freezer San Leandro is ranked #537 out of 818 solar farms in California in terms of total annual net electricity generation.

Preferred Freezer San Leandro generated 472.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NamePreferred Freezer San Leandro
Utility NameEnterSolar
LocationAlameda County, CA
Initial Operation DateJuly 2017
Last Update Dec 2023
Annual Generation 3.2 GWh
Annual Consumption 11.3 k MMBtu
Ranked #9,235 out of 12,312 Power Plants Nationwide
Ranked #4,170 out of 6,191 Solar Power Plants Nationwide
Ranked #1,236 out of 1,568 California Power Plants
Ranked #537 out of 818 California Solar Power Plants
Fuel Types Solar

Map of Preferred Freezer San Leandro

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Preferred Freezer San Leandro.

Create Your Account Today

Monthly Net Generation for Preferred Freezer San Leandro

80080060060040040020020000201820182019201920202020202120212022202220232023
Download SVG
Download PNG
Download CSV

Preferred Freezer San Leandro Details

Summary Information
Plant NamePreferred Freezer San Leandro (62578)
Plant Address400 Polar Way, San Leandro, CA 94577
UtilityEnterSolar (62067)
Latitude, Longitude37.712, -122.15067
Generation Dates on FileJan 2018 to Dec 2023
Initial Operation DateJuly 2017
Annual Generation 3.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeWarehousing and Storage (493)
Sector Commercial Non-CHP (4)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator SLPV1 Details Operating July 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity2 MW
Summer Capacity2 MW
Winter Capacity2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2017
Combined Heat & Power No
Sector NameCommercial Non-CHP (4)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle228
Tilt Angle5
DC Net Capacity2.6 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.6 MW
Virtual Net Metering AgreementNo

Preferred Freezer San Leandro Plant Owners

Owner NameAddressOwnership
OwnSolar450 Raritan Center Parkway, Suite E, Edison, NJ 8837100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4160Monument ValleyGreat Barrington, MA3.1 GWh
#4161Kankakee 2Bourbonnais, IL3.2 GWh
#4162Cornell Geneva Solar FarmSeneca, NY3.2 GWh
#4163Sullivan B Community Solar LLCMacomb, IL3.2 GWh
#4164Xcel Adams 1 Community Solar ArrayWatkins, CO3.2 GWh
#4165ESA Four Oaks 2 NC LLCFour Oaks, NC3.2 GWh
#4166HesperiaHesperia, CA3.2 GWh
#4167CES Sterling LLCSterling, MA3.2 GWh
#4168ER Center Road Solar, LLCHardwick, VT3.2 GWh
#4169ABIA Parking StructureAustin, TX3.2 GWh
#4171Brady Solar LLCAmericus, GA3.2 GWh
#4172Steel Sun 2: 2303-III-4 Hamburg TpkeLackawanna, NY3.2 GWh
#4173BeverlyBeverly, MA3.2 GWh
#4174MSAP 13Troy, NY3.2 GWh
#4175Torrington Solar One, LLCTorrington, CT3.2 GWh
#4176Kaiser Creek Solar (CSG)Molalla, OR3.1 GWh
#4177Kearsarge 100 Sohier RdBeverly, MA3.1 GWh
#4178Carson Solar IColorado Springs, CO3.1 GWh
#4179Cattail (CSG)Fulton, IL3.1 GWh
#4180Green Solar LLC (CSG)Culver, OR3.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Preferred Freezer San Leandro.

Plant NamePlant LocationAnnual GenerationDistance
AlamedaAlameda, CA3.1 GWh9.2 mi
AT&T - HaywardHayward, CA8.2 GWh4.7 mi
Bishop Ranch - BR 1-YSan Ramon, CA1.7 GWh11.1 mi
Bishop Ranch BR 1-XSan Ramon, CA1.6 GWh11.1 mi
City of Hayward WWTPHayward, CA11.3 GWh5.5 mi
Dynegy Oakland Power PlantOakland, CA2.7 GWh9.3 mi
Franklin Templeton San MateoSan Mateo, CA9.3 GWh14.1 mi
Gilead Foster City Solar ProjectFoster City, CA1.9 GWh12.1 mi
Kaiser Owens Dr. Fuel CellPleasanton, CA7.9 GWh14 mi
KSR028 Merced Fuel CellSan Leandro, CA15.7 GWh0.9 mi
One Market PlazaSan Francisco, CA177.0 MWh14.4 mi
PE BerkeleyBerkeley, CA163.6 GWh12.6 mi
Pixar - EmeryvilleEmeryville, CA7.5 GWh11.1 mi
Power Generation Station (PGS) 2Oakland, CA16.5 GWh11.2 mi
Russell City Energy CenterHayward, CA1.5 TWh5.4 mi
Santa Rita Jail Fuel CellDublin, CA11.1 GWh14.4 mi
Santa Rita Jail HybridDublin, CA13.1 GWh14.4 mi
SF Southeast Cogen PlantSan Francisco, CA3.9 GWh13.4 mi
Silicon Valley Clean WaterRedwood City, CA7.0 GWh12.5 mi
WWTP Power Generation StationOakland, CA28.9 GWh11.2 mi