Preferred Freezer San Leandro
400 Polar Way, San Leandro, CA 94577Plant Summary Information
Preferred Freezer San Leandro is ranked #612 out of 914 solar farms in California in terms of total annual net electricity generation.
Preferred Freezer San Leandro generated 441.5 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Preferred Freezer San Leandro |
|---|---|
| Utility Name | Pacific Gas & Electric Co. |
| Location | Alameda County, CA |
| Initial Operation Date | July 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 3.0 GWh |
| Annual Consumption | 10.2 k MMBtu |
| Ranked #9,968 out of 13,269 Power Plants Nationwide | |
| Ranked #4,963 out of 7,183 Solar Power Plants Nationwide | |
| Ranked #1,272 out of 1,637 California Power Plants | |
| Ranked #612 out of 914 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
EnterSolar (2018 to 2023) Powerflex (2024 to 2024) Pacific Gas & Electric Co. (2025 to 2025) |
Map of Preferred Freezer San Leandro
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Preferred Freezer San Leandro.
Monthly Net Generation for Preferred Freezer San Leandro
Monthly Plant Fuel Consumption for Preferred Freezer San Leandro
Preferred Freezer San Leandro Details
| Summary Information | |
|---|---|
| Plant Name | Preferred Freezer San Leandro (62578) |
| Plant Address | 400 Polar Way, San Leandro, CA 94577 |
| Utility | Pacific Gas & Electric Co. (14328) |
| Latitude, Longitude | 37.712, -122.15067 |
| Generation Dates on File | Jan 2018 to Dec 2025 |
| Initial Operation Date | July 2017 |
| Annual Generation | 3.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Warehousing and Storage (493) |
| Sector | Commercial Non-CHP (4) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator SLPV1 Details Operating July 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2017 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 228 |
| Tilt Angle | 5 |
| DC Net Capacity | 2.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 2.6 MW |
| Virtual Net Metering Agreement | No |
Preferred Freezer San Leandro Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| OwnSolar | 450 Raritan Center Parkway, Suite E, Edison, NJ 8837 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4953 | HGS Solar I | Whitehall, NY | 3.0 GWh |
| #4954 | ME CDG 004 | Bangor, ME | 3.0 GWh |
| #4955 | Lincoln Ave Solar Project | Holbrook, NY | 3.0 GWh |
| #4956 | GSPP Devens, LLC | Ayer, MA | 3.0 GWh |
| #4957 | Sydney Solar | Hampton, CT | 3.0 GWh |
| #4958 | Baltimore City D | Perryman, MD | 3.0 GWh |
| #4959 | Renew Solar ABC Sacramento LLC | Sacramento, CA | 3.0 GWh |
| #4960 | APG Old Bayside | Aberdeen, MD | 3.0 GWh |
| #4961 | Guildlerland CSG | Guilderland, NY | 3.0 GWh |
| #4962 | Hurteau Solar Project Hybrid | Uxbridge, MA | 2.8 GWh |
| #4964 | Cycz Solar Project CSG Hybrid | Spencer, MA | 2.9 GWh |
| #4965 | HQC Rock River Solar Power Gen Station | Beloit, WI | 3.0 GWh |
| #4966 | Vulcan | Kankakee, IL | 3.0 GWh |
| #4967 | Albertsons at Melrose Park | Melrose Park, IL | 3.0 GWh |
| #4968 | Oak Leaf Solar XXVII LLC | Greely, CO | 3.0 GWh |
| #4969 | TIA Solar | Tampa, FL | 3.0 GWh |
| #4970 | Cedar Creek PV | Seaford, NY | 3.0 GWh |
| #4971 | Baltimore City B | Perryman, MD | 3.0 GWh |
| #4972 | San Luis Solar Garden | Antonito, CO | 3.0 GWh |
| #4973 | Rutan | Palmdale, CA | 3.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Preferred Freezer San Leandro.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alameda | Alameda, CA | 3.0 GWh | 9.2 mi |
| AT&T - Hayward | Hayward, CA | 7.6 GWh | 4.7 mi |
| Bishop Ranch - BR 1-Y | San Ramon, CA | 1.7 GWh | 11.1 mi |
| Bishop Ranch - BR 15-AA | San Ramon, CA | 766.0 MWh | 11.2 mi |
| Bishop Ranch - BR 15-CC | San Ramon, CA | 950.0 MWh | 11.2 mi |
| Bishop Ranch - BR 15-DD | San Ramon, CA | 62.0 MWh | 11.3 mi |
| Bishop Ranch - BR 2600 | San Ramon, CA | 764.0 MWh | 11 mi |
| Bishop Ranch - BR 8-O | San Ramon, CA | 1.4 GWh | 10.8 mi |
| Bishop Ranch - BR 8-P | San Ramon, CA | 1.3 GWh | 10.8 mi |
| Bishop Ranch - BR 8-Q | San Ramon, CA | 871.0 MWh | 10.7 mi |
| Bishop Ranch BR 1-X | San Ramon, CA | 1.5 GWh | 11.1 mi |
| City of Hayward WWTP | Hayward, CA | 10.5 GWh | 5.5 mi |
| Dynegy Oakland Power Plant | Oakland, CA | 1.6 GWh | 9.3 mi |
| Gilead Foster City Solar Project | Foster City, CA | 1.9 GWh | 12.1 mi |
| KSR028 Merced Fuel Cell | San Leandro, CA | 16.4 GWh | 0.9 mi |
| Pixar - Emeryville | Emeryville, CA | 7.0 GWh | 11.1 mi |
| Power Generation Station (PGS) 2 | Oakland, CA | 20.3 GWh | 11.2 mi |
| Russell City Energy Center | Hayward, CA | 1.6 TWh | 5.4 mi |
| Silicon Valley Clean Water | Redwood City, CA | 8.3 GWh | 12.5 mi |
| WWTP Power Generation Station | Oakland, CA | 31.4 GWh | 11.2 mi |