Preferred Freezer San Leandro
400 Polar Way, San Leandro, CA 94577Plant Summary Information
Preferred Freezer San Leandro is ranked #537 out of 818 solar farms in California in terms of total annual net electricity generation.
Preferred Freezer San Leandro generated 472.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Preferred Freezer San Leandro |
---|---|
Utility Name | EnterSolar |
Location | Alameda County, CA |
Initial Operation Date | July 2017 |
Last Update | Dec 2023 |
Annual Generation | 3.2 GWh |
Annual Consumption | 11.3 k MMBtu |
Ranked #9,235 out of 12,312 Power Plants Nationwide | |
Ranked #4,170 out of 6,191 Solar Power Plants Nationwide | |
Ranked #1,236 out of 1,568 California Power Plants | |
Ranked #537 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Map of Preferred Freezer San Leandro
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Preferred Freezer San Leandro.
Monthly Net Generation for Preferred Freezer San Leandro
Preferred Freezer San Leandro Details
Summary Information | |
---|---|
Plant Name | Preferred Freezer San Leandro (62578) |
Plant Address | 400 Polar Way, San Leandro, CA 94577 |
Utility | EnterSolar (62067) |
Latitude, Longitude | 37.712, -122.15067 |
Generation Dates on File | Jan 2018 to Dec 2023 |
Initial Operation Date | July 2017 |
Annual Generation | 3.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Warehousing and Storage (493) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator SLPV1 Details Operating July 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2017 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 228 |
Tilt Angle | 5 |
DC Net Capacity | 2.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.6 MW |
Virtual Net Metering Agreement | No |
Preferred Freezer San Leandro Plant Owners
Owner Name | Address | Ownership |
---|---|---|
OwnSolar | 450 Raritan Center Parkway, Suite E, Edison, NJ 8837 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4160 | Monument Valley | Great Barrington, MA | 3.1 GWh |
#4161 | Kankakee 2 | Bourbonnais, IL | 3.2 GWh |
#4162 | Cornell Geneva Solar Farm | Seneca, NY | 3.2 GWh |
#4163 | Sullivan B Community Solar LLC | Macomb, IL | 3.2 GWh |
#4164 | Xcel Adams 1 Community Solar Array | Watkins, CO | 3.2 GWh |
#4165 | ESA Four Oaks 2 NC LLC | Four Oaks, NC | 3.2 GWh |
#4166 | Hesperia | Hesperia, CA | 3.2 GWh |
#4167 | CES Sterling LLC | Sterling, MA | 3.2 GWh |
#4168 | ER Center Road Solar, LLC | Hardwick, VT | 3.2 GWh |
#4169 | ABIA Parking Structure | Austin, TX | 3.2 GWh |
#4171 | Brady Solar LLC | Americus, GA | 3.2 GWh |
#4172 | Steel Sun 2: 2303-III-4 Hamburg Tpke | Lackawanna, NY | 3.2 GWh |
#4173 | Beverly | Beverly, MA | 3.2 GWh |
#4174 | MSAP 13 | Troy, NY | 3.2 GWh |
#4175 | Torrington Solar One, LLC | Torrington, CT | 3.2 GWh |
#4176 | Kaiser Creek Solar (CSG) | Molalla, OR | 3.1 GWh |
#4177 | Kearsarge 100 Sohier Rd | Beverly, MA | 3.1 GWh |
#4178 | Carson Solar I | Colorado Springs, CO | 3.1 GWh |
#4179 | Cattail (CSG) | Fulton, IL | 3.1 GWh |
#4180 | Green Solar LLC (CSG) | Culver, OR | 3.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Preferred Freezer San Leandro.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alameda | Alameda, CA | 3.1 GWh | 9.2 mi |
AT&T - Hayward | Hayward, CA | 8.2 GWh | 4.7 mi |
Bishop Ranch - BR 1-Y | San Ramon, CA | 1.7 GWh | 11.1 mi |
Bishop Ranch BR 1-X | San Ramon, CA | 1.6 GWh | 11.1 mi |
City of Hayward WWTP | Hayward, CA | 11.3 GWh | 5.5 mi |
Dynegy Oakland Power Plant | Oakland, CA | 2.7 GWh | 9.3 mi |
Franklin Templeton San Mateo | San Mateo, CA | 9.3 GWh | 14.1 mi |
Gilead Foster City Solar Project | Foster City, CA | 1.9 GWh | 12.1 mi |
Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.9 GWh | 14 mi |
KSR028 Merced Fuel Cell | San Leandro, CA | 15.7 GWh | 0.9 mi |
One Market Plaza | San Francisco, CA | 177.0 MWh | 14.4 mi |
PE Berkeley | Berkeley, CA | 163.6 GWh | 12.6 mi |
Pixar - Emeryville | Emeryville, CA | 7.5 GWh | 11.1 mi |
Power Generation Station (PGS) 2 | Oakland, CA | 16.5 GWh | 11.2 mi |
Russell City Energy Center | Hayward, CA | 1.5 TWh | 5.4 mi |
Santa Rita Jail Fuel Cell | Dublin, CA | 11.1 GWh | 14.4 mi |
Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh | 14.4 mi |
SF Southeast Cogen Plant | San Francisco, CA | 3.9 GWh | 13.4 mi |
Silicon Valley Clean Water | Redwood City, CA | 7.0 GWh | 12.5 mi |
WWTP Power Generation Station | Oakland, CA | 28.9 GWh | 11.2 mi |