Plant Summary Information

Preferred Freezer San Leandro is ranked #612 out of 914 solar farms in California in terms of total annual net electricity generation.

Preferred Freezer San Leandro generated 441.5 MWh during the 3-month period between September 2025 to December 2025.

Plant NamePreferred Freezer San Leandro
Utility NamePacific Gas & Electric Co.
LocationAlameda County, CA
Initial Operation DateJuly 2017
Last Update Dec 2025
Annual Generation 3.0 GWh
Annual Consumption 10.2 k MMBtu
Ranked #9,968 out of 13,269 Power Plants Nationwide
Ranked #4,963 out of 7,183 Solar Power Plants Nationwide
Ranked #1,272 out of 1,637 California Power Plants
Ranked #612 out of 914 California Solar Power Plants
Fuel Types Solar
Previous Operators EnterSolar (2018 to 2023)
Powerflex (2024 to 2024)
Pacific Gas & Electric Co. (2025 to 2025)

Map of Preferred Freezer San Leandro

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Preferred Freezer San Leandro.

Create Your Account Today

Monthly Net Generation for Preferred Freezer San Leandro

Monthly Plant Fuel Consumption for Preferred Freezer San Leandro

Preferred Freezer San Leandro Details

Summary Information
Plant NamePreferred Freezer San Leandro (62578)
Plant Address400 Polar Way, San Leandro, CA 94577
UtilityPacific Gas & Electric Co. (14328)
Latitude, Longitude37.712, -122.15067
Generation Dates on FileJan 2018 to Dec 2025
Initial Operation DateJuly 2017
Annual Generation 3.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeWarehousing and Storage (493)
Sector Commercial Non-CHP (4)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator SLPV1 Details Operating July 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity2 MW
Summer Capacity2 MW
Winter Capacity2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2017
Combined Heat & Power No
Sector NameCommercial Non-CHP (4)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle228
Tilt Angle5
DC Net Capacity2.6 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.6 MW
Virtual Net Metering AgreementNo

Preferred Freezer San Leandro Plant Owners

Owner NameAddressOwnership
OwnSolar450 Raritan Center Parkway, Suite E, Edison, NJ 8837100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4953HGS Solar IWhitehall, NY3.0 GWh
#4954ME CDG 004Bangor, ME3.0 GWh
#4955Lincoln Ave Solar ProjectHolbrook, NY3.0 GWh
#4956GSPP Devens, LLCAyer, MA3.0 GWh
#4957Sydney SolarHampton, CT3.0 GWh
#4958Baltimore City DPerryman, MD3.0 GWh
#4959Renew Solar ABC Sacramento LLCSacramento, CA3.0 GWh
#4960APG Old BaysideAberdeen, MD3.0 GWh
#4961Guildlerland CSGGuilderland, NY3.0 GWh
#4962Hurteau Solar Project HybridUxbridge, MA2.8 GWh
#4964Cycz Solar Project CSG HybridSpencer, MA2.9 GWh
#4965HQC Rock River Solar Power Gen StationBeloit, WI3.0 GWh
#4966VulcanKankakee, IL3.0 GWh
#4967Albertsons at Melrose ParkMelrose Park, IL3.0 GWh
#4968Oak Leaf Solar XXVII LLCGreely, CO3.0 GWh
#4969TIA SolarTampa, FL3.0 GWh
#4970Cedar Creek PVSeaford, NY3.0 GWh
#4971Baltimore City BPerryman, MD3.0 GWh
#4972San Luis Solar GardenAntonito, CO3.0 GWh
#4973RutanPalmdale, CA3.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Preferred Freezer San Leandro.

Plant NamePlant LocationAnnual GenerationDistance
AlamedaAlameda, CA3.0 GWh9.2 mi
AT&T - HaywardHayward, CA7.6 GWh4.7 mi
Bishop Ranch - BR 1-YSan Ramon, CA1.7 GWh11.1 mi
Bishop Ranch - BR 15-AASan Ramon, CA766.0 MWh11.2 mi
Bishop Ranch - BR 15-CCSan Ramon, CA950.0 MWh11.2 mi
Bishop Ranch - BR 15-DDSan Ramon, CA62.0 MWh11.3 mi
Bishop Ranch - BR 2600San Ramon, CA764.0 MWh11 mi
Bishop Ranch - BR 8-OSan Ramon, CA1.4 GWh10.8 mi
Bishop Ranch - BR 8-PSan Ramon, CA1.3 GWh10.8 mi
Bishop Ranch - BR 8-QSan Ramon, CA871.0 MWh10.7 mi
Bishop Ranch BR 1-XSan Ramon, CA1.5 GWh11.1 mi
City of Hayward WWTPHayward, CA10.5 GWh5.5 mi
Dynegy Oakland Power PlantOakland, CA1.6 GWh9.3 mi
Gilead Foster City Solar ProjectFoster City, CA1.9 GWh12.1 mi
KSR028 Merced Fuel CellSan Leandro, CA16.4 GWh0.9 mi
Pixar - EmeryvilleEmeryville, CA7.0 GWh11.1 mi
Power Generation Station (PGS) 2Oakland, CA20.3 GWh11.2 mi
Russell City Energy CenterHayward, CA1.6 TWh5.4 mi
Silicon Valley Clean WaterRedwood City, CA8.3 GWh12.5 mi
WWTP Power Generation StationOakland, CA31.4 GWh11.2 mi