Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 138.5 GWh | Jul 2015 | Oct 2024 | Wood/Wood Waste Solids : 99.0% Natural Gas : 1.0% |
| Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 14.8 GWh | Dec 2016 | Dec 2024 | Solar |
| AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 39.6 GWh | Jul 2015 | Dec 2024 | Solar |
| Columbia Solar Energy, LLC | Columbia Solar Energy LLC | Pittsburg, CA | California Independent System Operator (CISO) | 18.7 GWh | Sep 2015 | Dec 2024 | Solar |
| Sunshine Valley Solar | EDP Renewables North America LLC | Armagosa, NV | California Independent System Operator (CISO) | 259.1 GWh | Nov 2019 | Mar 2026 | Solar |
| Corcoran Solar 3 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 46.4 GWh | Jan 2016 | Dec 2024 | Solar |
| Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2015 | Dec 2024 | Solar |
| Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2015 | Dec 2024 | Solar |
| Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 27.4 GWh | Aug 2016 | Dec 2024 | Solar |
| Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 39.4 GWh | Aug 2016 | Dec 2024 | Solar |
| Copper Mountain Solar 4, LLC | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 211.3 GWh | Aug 2016 | Dec 2024 | Solar |
| Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 47.6 GWh | Nov 2015 | Dec 2024 | Solar |
| Pixar - Emeryville | Bloom Energy | Emeryville, CA | California Independent System Operator (CISO) | 7.5 GWh | Dec 2013 | Dec 2024 | Natural Gas |
| Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.1 GWh | Jun 2016 | Dec 2024 | Solar |
| Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 54.0 GWh | Jul 2016 | Dec 2024 | Solar |
| CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 264.9 GWh | Oct 2017 | Mar 2026 | Solar |
| RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 156.9 GWh | Nov 2016 | Mar 2026 | Solar |
| RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 187.7 GWh | Nov 2016 | Mar 2026 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 311.1 GWh | Jan 2019 | Mar 2026 | Solar |
| Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 12.7 GWh | Sep 2015 | Dec 2024 | Solar |
| SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 53.5 GWh | May 2016 | Dec 2024 | Solar |
| RE Tranquillity | Southern Power Co | Cantua Creek, CA | California Independent System Operator (CISO) | 491.4 GWh | Jun 2016 | Dec 2024 | Solar |
| Oro Loma | Consolidated Edison Development Inc. | Oro Loma, CA | California Independent System Operator (CISO) | 25.5 GWh | Dec 2016 | Dec 2024 | Solar |
| Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 4.2 GWh | Jan 2016 | Dec 2024 | Solar |
| SEPV 18 | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 5.0 GWh | Dec 2015 | Dec 2024 | Solar |
| Buidling L | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2016 | Dec 2024 | Solar |
| Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 21.3 GWh | Aug 2017 | Dec 2024 | Solar |
| Citizen B | AES Distributed Energy | Mendota, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2015 | Dec 2024 | Solar |
| Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.5 GWh | Mar 2017 | Dec 2024 | Solar |
| Great Valley Solar Portfolio Holdings, L | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 494.8 GWh | Nov 2017 | Mar 2026 | Solar |
| Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 120.5 GWh | Nov 2016 | Mar 2026 | Solar |
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 202.3 GWh | Nov 2016 | Mar 2026 | Solar |
| DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.6 GWh | Jun 2014 | Dec 2024 | Solar |
| Freeway Springs | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 3.1 GWh | Sep 2016 | Dec 2024 | Solar |
| CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.8 GWh | Jun 2014 | Dec 2024 | Solar |
| Dulles | Golden Springs Development Company LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2016 | Dec 2024 | Solar |
| SunE- E Philadelphia Ontario | SunEdison LLC | Ontario, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2016 | Dec 2024 | Solar |
| Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Apr 2015 | Dec 2024 | Solar |
| Western Antelope Blue Sky B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 50.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 66.1 GWh | Oct 2017 | Mar 2026 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 851.3 GWh | Nov 2024 | Mar 2026 | Solar |
| Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Dec 2024 | Solar |
| Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2015 | Dec 2024 | Solar |
| Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 58.7 GWh | Mar 2016 | Dec 2024 | Landfill Gas |
| RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 483.5 GWh | Oct 2016 | Dec 2024 | Solar |
| Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2016 | Dec 2024 | Solar |
| North Lancaster Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 37.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 247.4 GWh | Nov 2015 | Dec 2024 | Wind |
| Building F | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2016 | Dec 2024 | Solar |
| Intel Santa Clara | Bloom Energy | Santa Clara, CA | California Independent System Operator (CISO) | 7.7 GWh | Dec 2014 | Dec 2024 | Natural Gas |
| Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2016 | Dec 2024 | Solar |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 16.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| Zero Waste Energy Development Co LLC | Zero Waste Energy Development Company LLC | San Jose, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2015 | Dec 2024 | Other Biomass Gas |
| Building G | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.0 GWh | Aug 2016 | Dec 2024 | Solar |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 796.0 MWh | Aug 2015 | Dec 2024 | Solar |
| Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
| UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 17.4 GWh | Feb 2015 | Dec 2024 | Solar |
| Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 62.6 GWh | Nov 2020 | Mar 2026 | Solar |
| CED Avenal | Consolidated Edison Development Inc. | Avenal, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2016 | Dec 2024 | Solar |
| CED Ducor 1 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 51.9 GWh | Nov 2016 | Dec 2024 | Solar |
| North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 388.1 GWh | May 2019 | Mar 2026 | Solar |
| Blythe Solar 110, LLC | Blythe Solar 110, LLC | Blythe, CA | California Independent System Operator (CISO) | 580.5 GWh | Feb 2016 | Dec 2024 | Solar |
| Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 357.0 GWh | Apr 2020 | Mar 2026 | Solar |
| Mesquite Solar 2, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 286.9 GWh | Nov 2016 | Mar 2026 | Solar |
| Mesquite Solar 3, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 445.1 GWh | Nov 2016 | Mar 2026 | Solar |
| Adera Solar | AES Distributed Energy | Chowchilla, CA | California Independent System Operator (CISO) | 17.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 46.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2015 | Dec 2024 | Solar |
| Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 3.0 GWh | Mar 2015 | Dec 2024 | Solar |
| Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Dec 2024 | Solar |
| Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 359.2 GWh | Oct 2020 | Mar 2026 | Solar |
| Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 45.8 GWh | Mar 2016 | Dec 2024 | Solar |
| Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Jan 2017 | Dec 2024 | Solar |
| CED Ducor 4 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Riverside RWQCP Fuel Cell | Riverside Fuel Cell, LLC | Riverside, CA | California Independent System Operator (CISO) | 8.5 GWh | Jul 2016 | Dec 2024 | Other Biomass Gas : 83.8% Natural Gas : 16.2% |
| CED Ducor 2 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 52.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 111.3 GWh | May 2020 | Mar 2026 | Solar |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 25.3 GWh | Jan 2017 | Dec 2024 | Solar |
| Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 51.3 GWh | Dec 2015 | Dec 2024 | Solar |
| CED Ducor 3 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 39.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 409.9 GWh | Nov 2019 | Mar 2026 | Solar |
| Blackwell Solar Park | Consolidated Edison Development Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 31.3 GWh | Dec 2018 | Dec 2024 | Solar |
| Five Points Solar Park | Boralex US Operations LLC | Five Points, CA | California Independent System Operator (CISO) | 93.3 GWh | Aug 2016 | Dec 2024 | Solar |
| Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 19.3 GWh | May 2017 | Dec 2024 | Solar |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 239.9 GWh | Dec 2018 | Mar 2026 | Solar |
| Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 51.1 GWh | Feb 2015 | Dec 2024 | Solar |
| Morelos del Sol | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 29.9 GWh | Oct 2015 | Dec 2024 | Solar |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.7 GWh | Sep 2015 | Dec 2024 | Solar |
| AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 2016 | Dec 2024 | Solar |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 29.6 GWh | May 2017 | Dec 2024 | Landfill Gas |
| Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.8 GWh | Mar 2016 | Dec 2024 | Solar |
| Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 336.8 GWh | Jun 2016 | Mar 2026 | Solar |
| Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2024 | Solar |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 52.8 GWh | Jul 2015 | Dec 2024 | Solar |
| Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 25.1 GWh | Sep 2015 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |