SeaWorld Aquatica
2052 Entertainment Circle, Chula Vista, CA 91911Plant Summary Information
SeaWorld Aquatica is ranked #702 out of 849 solar farms in California in terms of total annual net electricity generation.
SeaWorld Aquatica generated 341.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | SeaWorld Aquatica |
|---|---|
| Utility Name | Onyx Asset Services Group |
| Location | San Diego County, CA |
| Initial Operation Date | May 2018 |
| Last Update | Dec 2024 |
| Annual Generation | 1.9 GWh |
| Annual Consumption | 6.7 k MMBtu |
| Ranked #10,668 out of 12,539 Power Plants Nationwide | |
| Ranked #5,425 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,423 out of 1,600 California Power Plants | |
| Ranked #702 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of SeaWorld Aquatica
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SeaWorld Aquatica.
Monthly Net Generation for SeaWorld Aquatica
SeaWorld Aquatica Details
| Summary Information | |
|---|---|
| Plant Name | SeaWorld Aquatica (61843) |
| Plant Address | 2052 Entertainment Circle, Chula Vista, CA 91911 |
| Utility | Onyx Asset Services Group (60584) |
| Latitude, Longitude | 32.58654, -117.00488 |
| Generation Dates on File | May 2018 to Dec 2024 |
| Initial Operation Date | May 2018 |
| Annual Generation | 1.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 18-1068-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator 10276 Details Operating May 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.1 MW |
| Summer Capacity | 1.1 MW |
| Winter Capacity | 1.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 181 |
| Tilt Angle | 7 |
| DC Net Capacity | 1.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1 MW |
| Virtual Net Metering Agreement | No |
SeaWorld Aquatica Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| SW Solar Mission III LLC | 230 Park Avenue, New York, NY 10169 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5415 | Novel Schmoll Farms Solar CSG | Dodge Center, MN | 1.9 GWh |
| #5416 | IGS CC, LLC | Washington, DC | 1.9 GWh |
| #5417 | Grimm Community Solar | Buffalo Lake, MN | 1.9 GWh |
| #5418 | Novel Debra Solar LLC CSG | Mantorville, MN | 1.9 GWh |
| #5419 | USS Solar Way LLC CSG | Hartland, MN | 1.9 GWh |
| #5420 | Wal-Mart Truth or Consequences PV | Truth or Consequences, NM | 1.9 GWh |
| #5421 | USS Dot Com Solar LLC CSG | Morgan, MN | 1.9 GWh |
| #5422 | Mayhill Solar LLC Community Solar | Saddle Brook, NJ | 1.9 GWh |
| #5423 | Guadalupe Solar Farm | San Jose, CA | 1.9 GWh |
| #5424 | FELPS 2 - Calaveras | Floresville, TX | 1.9 GWh |
| #5426 | FELPS 1 - Calaveras | Floresville, TX | 1.8 GWh |
| #5427 | Forrest City- Prison Site | Forrest City, AR | 1.8 GWh |
| #5428 | New Castle Solar RES | New Castle, IN | 1.8 GWh |
| #5429 | Dakota Community Solar One LLC CSG | Farmington, MN | 1.8 GWh |
| #5430 | Novel Reber Solar CSG | Albany, MN | 1.8 GWh |
| #5431 | Lake Elsinore Canopies - Lakeside HS | Lake Elsinore, CA | 1.8 GWh |
| #5432 | Old Cedar Solar Energy Storage | Asheboro, NC | 1.8 GWh |
| #5433 | Aquila Community Solar | Glenwood, MN | 1.8 GWh |
| #5434 | BPU Solar Farm | Kansas City, KS | 1.8 GWh |
| #5435 | USS Solar Sources LLC CSG | Scandia, MN | 1.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SeaWorld Aquatica.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amazon SAN3 Solar Project | San Diego, CA | 6.1 GWh | 4.4 mi |
| Border Hybrid Energy Center | San Diego, CA | 14.8 GWh | 3.9 mi |
| Chula Vista Energy Center | Chula Vista, CA | 1.8 GWh | 3.1 mi |
| County of San Diego SBRC | Chula Vista, CA | 2.3 GWh | 5.3 mi |
| CP Kelco San Diego Plant | San Diego, CA | 71.3 GWh | 11 mi |
| Cuyamaca Peak Energy Plant | El Cajon, CA | 5.9 GWh | 14.6 mi |
| El Cajon Energy Center | El Cajon, CA | 9.0 GWh | 14.6 mi |
| Gas Utilization Facility | San Diego, CA | 30.7 GWh | 15.5 mi |
| Grossmont Hospital | La Mesa, CA | 25.5 GWh | 13.3 mi |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | El Cajon, CA | 2.8 GWh | 11.7 mi |
| ISH Solar Hospital SDMC | San Diego, CA | 1.2 GWh | 15.1 mi |
| Larkspur Energy Facility | San Diego, CA | 24.4 GWh | 3.8 mi |
| Lindberg FIeld Solar | San Diego, CA | 3.0 GWh | 15.4 mi |
| Lindberg Field Solar 2 | San Diego, CA | 1.7 GWh | 15.3 mi |
| Naval Hospital Medical Center | San Diego, CA | 16.2 GWh | 12.7 mi |
| Otay Mesa Generating Project | San Diego, CA | 1.8 TWh | 5.2 mi |
| PFMG Solar Grossmont Helix LLC | La Mesa, CA | 2.0 GWh | 11.7 mi |
| Pio Pico Energy Center | San Diego, CA | 65.9 GWh | 5.1 mi |
| San Diego - EMDF at San Diego | San Diego, CA | 4.7 GWh | 5 mi |
| San Diego State University | San Diego, CA | 52.4 GWh | 13.8 mi |