NLP Granger
30645 Mesa Crest Road, Valley Center, CA 92082Plant Summary Information
NLP Granger is ranked #477 out of 885 solar farms in California in terms of total annual net electricity generation.
NLP Granger generated 1.3 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | NLP Granger |
|---|---|
| Utility Name | Heelstone Energy Holdings, LLC |
| Location | San Diego County, CA |
| Initial Operation Date | September 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 4.5 GWh |
| Annual Consumption | 16.2 k MMBtu |
| Ranked #8,501 out of 13,081 Power Plants Nationwide | |
| Ranked #3,714 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,099 out of 1,606 California Power Plants | |
| Ranked #477 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of NLP Granger
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NLP Granger.
Monthly Net Generation for NLP Granger
Monthly Plant Fuel Consumption for NLP Granger
NLP Granger Details
| Summary Information | |
|---|---|
| Plant Name | NLP Granger (60516) |
| Plant Address | 30645 Mesa Crest Road, Valley Center, CA 92082 |
| Utility | Heelstone Energy Holdings, LLC (59462) |
| Latitude, Longitude | 33.2704, -117.0588 |
| Generation Dates on File | Sep 2016 to Dec 2025 |
| Initial Operation Date | September 2016 |
| Annual Generation | 4.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 14-638-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator PV1 Details Operating September 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2016 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 3.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
NLP Granger Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3704 | SunE CPS1 LLC | San Antonio, TX | 4.5 GWh |
| #3705 | Round Grove 2 | Lyndon, IL | 4.5 GWh |
| #3706 | NLRED 2MW | North Little Rock, AR | 4.5 GWh |
| #3707 | Whitethorn Solar LLC | Livermore, CA | 4.5 GWh |
| #3708 | Chisago Holdco LLC, CSG | Center City, MN | 4.5 GWh |
| #3709 | Argo Navis Community Solar | Scandia, MN | 4.5 GWh |
| #3710 | BristolSolar | Woodburn, OR | 4.5 GWh |
| #3711 | CA - Ventura Co CCD - Moorpark College | Moorpark, CA | 4.5 GWh |
| #3712 | Sierra Pacific Chinese Camp | Chinese Camp, CA | 4.5 GWh |
| #3713 | Kern Sunset 1886-WD | Bakersfield, CA | 4.5 GWh |
| #3715 | Boutillier Solar, LLC CSG | Leicester, MA | 4.5 GWh |
| #3716 | Waterford Holdco CSG | Waterford, MN | 4.5 GWh |
| #3717 | Soscol Ferry Solar | Napa, CA | 4.5 GWh |
| #3718 | Wallace Solar LLC (CSG) | Salem, OR | 4.5 GWh |
| #3719 | Pleasant Valley Solar | Monroe, GA | 4.5 GWh |
| #3720 | Zena Solar | Northwest Salem, OR | 4.5 GWh |
| #3721 | Burlington Coat Factory Solar | Florence, NJ | 4.5 GWh |
| #3722 | GSPP Held LLC CSG | St. Cloud, MN | 4.5 GWh |
| #3723 | Dakota Solar 1, LLC | Dakota, IL | 4.5 GWh |
| #3724 | French Road Solar II | Burlington, IL | 4.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NLP Granger.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bear Valley | Escondido, CA | 2.7 GWh | 7.6 mi |
| CalPeak Power Enterprise Peaker Plant | Escondido, CA | 2.2 GWh | 10.8 mi |
| Carlsbad Energy Center | Carlsbad, CA | 195.0 GWh | 18.3 mi |
| Encina Water Pollution Control | Carlsbad, CA | 14.3 GWh | 18.5 mi |
| Escondido Energy Center | Escondido, CA | 3.2 GWh | 10.5 mi |
| GEN005 Antibody Fuel Cell | Oceanside, CA | 19.5 GWh | 14.5 mi |
| Genentech-Oceanside Hybrid | Oceanside, CA | 3.6 GWh | 14.5 mi |
| Gilead Oceanside Solar Project | Oceanside, CA | 952.0 MWh | 14.7 mi |
| Goal Line LP | Escondido, CA | 11.7 GWh | 10.8 mi |
| Legoland CA Phase I | Carlsbad, CA | 1.4 GWh | 17.5 mi |
| Life Technologies Carlsbad | Carlsbad, CA | 8.6 GWh | 16.1 mi |
| Orange Grove Peaking Facility | Pala, CA | 9.1 GWh | 6.9 mi |
| Palomar Energy | Escondido, CA | 1.3 TWh | 11 mi |
| San Diego - NCRC at Vista | Vista, CA | 2.8 GWh | 12.6 mi |
| SDCWA - Twin Oaks | San Marcos, CA | 1.6 GWh | 7.7 mi |
| Vallecitos Water District | San Marcos, CA | 2.8 GWh | 7.9 mi |
| Valley Center | Valley Center, CA | 4.3 GWh | 2.5 mi |
| Valley Center 1 | Valley Center, CA | 3.6 GWh | 4.1 mi |
| Valley Center 2 | Valley Center, CA | 8.5 GWh | 4.1 mi |
| Watkins Manufacturing Co. | San Diego, CA | 7.6 GWh | 13.5 mi |