| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.0 GWh | May 2021 | Dec 2024 | Solar |
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2019 | Dec 2024 | Solar |
| CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2019 | Dec 2024 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 662.4 GWh | Aug 2021 | Dec 2025 | Solar |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 308.3 GWh | Oct 2022 | Dec 2025 | Solar |
| Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 4.1 GWh | Oct 2014 | Dec 2025 | Wind |
| Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2015 | Dec 2024 | Solar |
| Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2015 | Dec 2024 | Solar |
| Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 46.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2014 | Dec 2025 | Wind |
| City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2014 | Dec 2024 | Wind |
| Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2014 | Dec 2024 | Wind |
| Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 3.0 GWh | Mar 2015 | Dec 2024 | Solar |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 52.8 GWh | Jul 2015 | Dec 2024 | Solar |
| Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 29.6 GWh | May 2017 | Dec 2024 | Landfill Gas |
| Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 257.0 GWh | Oct 2015 | Dec 2024 | Solar |
| Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 51.1 GWh | Feb 2015 | Dec 2024 | Solar |
| SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2014 | Dec 2024 | Solar |
| SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2014 | Dec 2024 | Solar |
| Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2015 | Dec 2024 | Solar |
| Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
| Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 27.4 GWh | Aug 2016 | Dec 2024 | Solar |
| Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 39.4 GWh | Aug 2016 | Dec 2024 | Solar |
| Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 47.6 GWh | Nov 2015 | Dec 2024 | Solar |
| AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 39.6 GWh | Jul 2015 | Dec 2024 | Solar |
| Kettleman Solar -Centaurus | Boralex US Operations LLC | Kettleman City, CA | California Independent System Operator (CISO) | 40.7 GWh | Jun 2015 | Dec 2024 | Solar |
| Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 37.4 GWh | Apr 2015 | Dec 2024 | Solar |
| SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 138.5 GWh | Jul 2015 | Oct 2024 | Wood/Wood Waste Solids : 99.0% Natural Gas : 1.0% |
| Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 5.0 GWh | Jul 2014 | Dec 2024 | Solar |
| Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 13.1 GWh | Apr 2017 | Dec 2024 | Landfill Gas |
| Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Apr 2015 | Dec 2024 | Solar |
| Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2016 | Dec 2024 | Solar |
| California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2014 | Dec 2024 | Solar |
| Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.6 GWh | Aug 2013 | Dec 2024 | Natural Gas |
| Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.5 GWh | Feb 2013 | Dec 2024 | Natural Gas |
| SEPV 18 | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 5.0 GWh | Dec 2015 | Dec 2024 | Solar |
| Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 21.3 GWh | Aug 2017 | Dec 2024 | Solar |
| Anaheim Solar Energy Plant | Anaheim Public Utilities | Anaheim, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2014 | Dec 2024 | Solar |
| Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 46.3 GWh | Apr 2015 | Dec 2024 | Solar |
| Madelyn Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Rudy Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Mitchell Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 41.1 GWh | Apr 2015 | Dec 2024 | Solar |
| Corcoran Solar 2 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 45.6 GWh | Apr 2015 | Dec 2024 | Solar |
| Atwell Island West Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 45.4 GWh | Apr 2015 | Dec 2024 | Solar |
| TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 52.0 GWh | Oct 2014 | Dec 2024 | Solar |
| P Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 30.5 GWh | Feb 2007 | Jul 2024 | Natural Gas |
| Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 53.2 GWh | Aug 2015 | Dec 2024 | Solar |
| SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 2014 | Dec 2024 | Solar |
| SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.8 GWh | Oct 2014 | Nov 2024 | Solar |
| SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
| Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 14.4 GWh | Jun 2015 | Dec 2024 | Solar |
| Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 39.5 GWh | Oct 2015 | Dec 2024 | Solar |
| Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2024 | Water |
| Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 41.9 GWh | Jan 2015 | Dec 2024 | Solar |
| Adera Solar | AES Distributed Energy | Chowchilla, CA | California Independent System Operator (CISO) | 17.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2014 | Dec 2024 | Solar |
| Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 113.4 GWh | May 2020 | Dec 2025 | Solar |
| Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 51.3 GWh | Dec 2015 | Dec 2024 | Solar |
| Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 402.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Blackwell Solar Park | Consolidated Edison Development Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 31.3 GWh | Dec 2018 | Dec 2024 | Solar |
| Five Points Solar Park | Boralex US Operations LLC | Five Points, CA | California Independent System Operator (CISO) | 93.3 GWh | Aug 2016 | Dec 2024 | Solar |
| Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 19.3 GWh | May 2017 | Dec 2024 | Solar |
| Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Dec 2024 | Solar |
| Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 17.4 GWh | May 2017 | Dec 2024 | Solar |
| Alamo Solar | Onward Energy | Oro Grande, CA | California Independent System Operator (CISO) | 47.7 GWh | Apr 2015 | Dec 2024 | Solar |
| Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 153.5 GWh | Mar 2016 | Dec 2024 | Landfill Gas |
| City of Tulare Water Facility | City of Tulare Water Pollution Control | Tulare, CA | California Independent System Operator (CISO) | 20.7 GWh | Dec 1990 | Dec 2024 | Natural Gas : 62.5% Other Biomass Gas : 21.5% Solar : 16.0% |
| W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 27.8 GWh | Jun 2005 | Nov 2025 | Natural Gas |
| Q Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 66.0 MWh | Jun 2013 | Dec 2024 | Natural Gas |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 63.0 GWh | Nov 2020 | Dec 2025 | Solar |
| SunE- E Philadelphia Ontario | SunEdison LLC | Ontario, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2016 | Dec 2024 | Solar |
| Oro Loma | Consolidated Edison Development Inc. | Oro Loma, CA | California Independent System Operator (CISO) | 25.5 GWh | Dec 2016 | Dec 2024 | Solar |
| Corcoran Solar 3 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 46.4 GWh | Jan 2016 | Dec 2024 | Solar |
| North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 397.2 GWh | May 2019 | Dec 2025 | Solar |
| Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 46.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Riverside RWQCP Fuel Cell | Riverside Fuel Cell, LLC | Riverside, CA | California Independent System Operator (CISO) | 8.5 GWh | Jul 2016 | Dec 2024 | Other Biomass Gas : 83.8% Natural Gas : 16.2% |
| UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 17.4 GWh | Feb 2015 | Dec 2024 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 822.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2014 | Dec 2024 | Solar |
| Rising Tree Wind Farm II | Rising Tree Wind Farm II LLC | Mojave, CA | California Independent System Operator (CISO) | 58.7 GWh | Dec 2014 | Dec 2024 | Wind |
| Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 261.4 GWh | May 2015 | Dec 2024 | Wind |
| Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 49.5 GWh | Nov 2014 | Dec 2024 | Solar |
| Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 45.8 GWh | Mar 2016 | Dec 2024 | Solar |
| Sunshine Valley Solar | EDP Renewables North America LLC | Armagosa, NV | California Independent System Operator (CISO) | 264.1 GWh | Nov 2019 | Dec 2025 | Solar |
| Copper Mountain Solar 4, LLC | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 211.3 GWh | Aug 2016 | Dec 2024 | Solar |
| Yahoo! - HQ | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2014 | Jul 2024 | Natural Gas |
| SEPV Palmdale East | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 25.0 GWh | Jul 2015 | Dec 2024 | Solar |
| RE Tranquillity | Southern Power Co | Cantua Creek, CA | California Independent System Operator (CISO) | 491.4 GWh | Jun 2016 | Dec 2024 | Solar |
| Great Valley Solar Portfolio Holdings, L | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 503.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 796.0 MWh | Aug 2015 | Dec 2024 | Solar |
| Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 58.7 GWh | Mar 2016 | Dec 2024 | Landfill Gas |
| Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 6.5 GWh | Jun 2014 | Dec 2024 | Solar |
| Western Antelope Blue Sky B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 50.2 GWh | Nov 2016 | Dec 2024 | Solar |
| North Lancaster Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 37.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Central Antelope Dry Ranch C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 33.3 GWh | Apr 2016 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on December 2025 generation numbers.| State | Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,766.12 GWh |
| Alaska | # 48 | 139 | 625.46 GWh |
| Arizona | # 16 | 183 | 8,962.31 GWh |
| Arkansas | # 29 | 114 | 5,525.50 GWh |
| California | # 5 | 1,683 | 14,393.99 GWh |
| Colorado | # 31 | 297 | 4,649.38 GWh |
| Connecticut | # 34 | 162 | 4,087.83 GWh |
| Delaware | # 49 | 33 | 469.96 GWh |
| District of Columbia | # 51 | 16 | 14.80 GWh |
| Florida | # 3 | 333 | 19,379.32 GWh |
| Georgia | # 8 | 248 | 12,492.24 GWh |
| Hawaii | # 46 | 70 | 814.97 GWh |
| Idaho | # 41 | 146 | 2,123.12 GWh |
| Illinois | # 4 | 379 | 17,546.79 GWh |
| Indiana | # 13 | 214 | 9,789.95 GWh |
| Iowa | # 20 | 293 | 7,310.28 GWh |
| Kansas | # 28 | 183 | 5,586.75 GWh |
| Kentucky | # 22 | 60 | 6,716.43 GWh |
| Louisiana | # 17 | 84 | 8,587.03 GWh |
| Maine | # 45 | 215 | 1,484.81 GWh |
| Maryland | # 37 | 203 | 3,225.85 GWh |
| Massachusetts | # 43 | 640 | 2,073.13 GWh |
| Michigan | # 11 | 269 | 11,734.82 GWh |
| Minnesota | # 27 | 764 | 5,712.30 GWh |
| Mississippi | # 24 | 56 | 6,090.79 GWh |
| Missouri | # 23 | 125 | 6,623.76 GWh |
| State | Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,639.28 GWh |
| Nebraska | # 36 | 125 | 3,667.32 GWh |
| Nevada | # 38 | 114 | 3,217.22 GWh |
| New Hampshire | # 44 | 56 | 1,878.83 GWh |
| New Jersey | # 30 | 387 | 5,182.27 GWh |
| New Mexico | # 35 | 142 | 3,818.41 GWh |
| New York | # 10 | 950 | 11,800.05 GWh |
| North Carolina | # 9 | 904 | 12,153.04 GWh |
| North Dakota | # 33 | 58 | 4,218.72 GWh |
| Ohio | # 6 | 198 | 13,425.53 GWh |
| Oklahoma | # 18 | 141 | 7,637.23 GWh |
| Oregon | # 21 | 272 | 6,788.64 GWh |
| Pennsylvania | # 2 | 252 | 22,539.49 GWh |
| Rhode Island | # 47 | 100 | 775.70 GWh |
| South Carolina | # 15 | 207 | 8,967.44 GWh |
| South Dakota | # 42 | 52 | 2,122.20 GWh |
| Tennessee | # 19 | 88 | 7,328.17 GWh |
| Texas | # 1 | 947 | 46,150.81 GWh |
| Utah | # 39 | 125 | 2,845.12 GWh |
| Vermont | # 50 | 116 | 189.85 GWh |
| Virginia | # 14 | 237 | 9,421.16 GWh |
| Washington | # 12 | 135 | 10,635.09 GWh |
| West Virginia | # 26 | 39 | 5,763.55 GWh |
| Wisconsin | # 25 | 243 | 5,804.32 GWh |
| Wyoming | # 32 | 70 | 4,436.68 GWh |