Fresno Sunnyside High School Hybrid
1019 S Peach Avenue, Fresno, CA 93727Plant Summary Information
Fresno Sunnyside High School Hybrid is ranked #680 out of 917 solar farms in California in terms of total annual net electricity generation.
Fresno Sunnyside High School Hybrid generated 301.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Fresno Sunnyside High School Hybrid |
|---|---|
| Utility Name | Forefront Power, LLC |
| Location | Fresno County, CA |
| Initial Operation Date | December 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 2.3 GWh |
| Annual Consumption | 8.4 k MMBtu |
| Ranked #10,604 out of 13,301 Power Plants Nationwide | |
| Ranked #5,429 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,364 out of 1,641 California Power Plants | |
| Ranked #680 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Fresno Sunnyside High School Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fresno Sunnyside High School Hybrid.
Monthly Net Generation for Fresno Sunnyside High School Hybrid
Monthly Plant Fuel Consumption for Fresno Sunnyside High School Hybrid
Fresno Sunnyside High School Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Fresno Sunnyside High School Hybrid (63422) |
| Plant Address | 1019 S Peach Avenue, Fresno, CA 93727 |
| Utility | Forefront Power, LLC (62856) |
| Latitude, Longitude | 36.73401, -119.71781 |
| Generation Dates on File | Dec 2020 to Dec 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 2.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 22-391-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | Yes |
Generator 1122 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| East West Fixed Tilt | Yes |
| Azimuth Angle | 270 |
| Tilt Angle | 7 |
| DC Net Capacity | 1.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.7 MW |
| Virtual Net Metering Agreement | No |
Generator BA112 Details Operating December 2020
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 0.3 |
|---|---|
| Maximum Charge Rate | 0.3 MW |
| Maximum Discharge Rate | 0.3 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.2 |
| Storage Enclosure Type | CS |
| System Peak Shaving | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 63422 |
| Direct Support Gen Id | 1122 |
| Support T D Asset | No |
Fresno Sunnyside High School Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5419 | Prescott Airport | Prescott, AZ | 2.4 GWh |
| #5420 | Whittier | Ogden, NY | 2.4 GWh |
| #5421 | Dennison | Hauppauge, NY | 2.4 GWh |
| #5422 | General Electric Aircraft Engines | Lynn, MA | 2.4 GWh |
| #5423 | Crowne Plaza | Cherry Hill, NJ | 2.4 GWh |
| #5424 | SunGen Sharon 1 LLC | Sharon, VT | 2.4 GWh |
| #5425 | Dickinson Solar Array | Buffalo, MN | 2.4 GWh |
| #5426 | Winchendon Landfill Solar | Winchendon, MA | 2.4 GWh |
| #5427 | Searsmont Road Lincolnville Solar, LLC | Lincolnville, ME | 2.4 GWh |
| #5428 | Baer Road CSG | New York, NY | 2.4 GWh |
| #5430 | South County Detention Center Solar | Porterville, CA | 2.4 GWh |
| #5431 | Holly Swamp Solar, LLC | Lumberton, NC | 2.4 GWh |
| #5432 | Bryan Solar Field | Bryan, OH | 2.4 GWh |
| #5433 | Town of Uxbridge MA at Commerce Dr | Uxbridge, MA | 2.4 GWh |
| #5434 | West Greenwich Solar | West Greenwich, RI | 2.4 GWh |
| #5435 | Camp San Luis Obispo | San Luis Obispo, CA | 2.4 GWh |
| #5436 | Orefield | Orefield, PA | 2.4 GWh |
| #5437 | Theodore Drive Community Solar | Westminster, MA | 2.4 GWh |
| #5438 | Chicopee Granby Road Solar | Chicopee, MA | 2.4 GWh |
| #5439 | Chatham Landfill | Chatham, MA | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fresno Sunnyside High School Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Algonquin Power Sanger LLC | Sanger, CA | 3.0 GWh | 9.8 mi |
| CA - Fresno County - Juvenile Hall | Fresno, CA | 6.8 GWh | 5.1 mi |
| CA - Fresno, City of - SE Surface WTP | Fresno, CA | 7.1 GWh | 3.9 mi |
| Clovis East High School | Clovis, CA | 1.3 GWh | 6.2 mi |
| Clovis High School | Clovis, CA | 1.6 GWh | 6.1 mi |
| CSU Fresno Solar Project | Fresno, CA | 1.3 GWh | 5.4 mi |
| Fresno Bullard High School Hybrid | Fresno, CA | 2.1 GWh | 7.8 mi |
| Fresno Community Solar | Fresno, CA | 16.9 GWh | 9.6 mi |
| Fresno Hoover High School Hybrid | Fresno, CA | 2.0 GWh | 6.5 mi |
| Fresno-Clovis RWRF | Fresno, CA | 27.6 GWh | 9.9 mi |
| Gap Pacific Distribution Center | Fresno, CA | 5.4 GWh | 3.3 mi |
| JD Foods - JD Foods | Fresno, CA | 2.5 GWh | 2.7 mi |
| La Joya Del Sol | Fresno, CA | 806.0 MWh | 5.8 mi |
| Malaga Power LLC | Fresno, CA | 6.0 GWh | 3.3 mi |
| National Raisin | Fowler, CA | 4.6 GWh | 8 mi |
| OK Produce Fresno Carport | Fresno, CA | 3.3 GWh | 3.2 mi |
| POM Plant 1 | Del Rey, CA | 5.1 GWh | 9 mi |
| POM Plant 2 | Del Rey, CA | 3.4 GWh | 8.8 mi |
| Saint Agnes Medical Center | Fresno, CA | 32.0 GWh | 7.5 mi |
| SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh | 5 mi |