Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 297.2 GWh | Nov 2021 | Feb 2025 | Solar |
EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.2 GWh | Apr 2022 | Nov 2023 | Solar |
CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2021 | Dec 2023 | Solar |
El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2021 | Dec 2023 | Solar |
California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.7 GWh | Nov 2021 | Dec 2023 | Solar |
OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.1 GWh | Dec 2018 | Dec 2023 | Solar |
IGS KSBD | Greenbacker Renewable Energy Corporation | Highland, CA | California Independent System Operator (CISO) | 9.0 GWh | Feb 2022 | Dec 2023 | Solar |
Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2021 | Dec 2023 | Natural Gas |
County of San Diego COC Hybrid | Solar Star California LXXVIII, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2020 | Dec 2023 | Solar : 95.9% Electricity used for energy storage : 4.1% |
Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.1 GWh | Aug 2018 | Dec 2023 | Solar |
Amazon PSP1 | Greenbacker Renewable Energy Corporation | Beaumont, CA | California Independent System Operator (CISO) | 7.5 GWh | Sep 2021 | Dec 2023 | Solar |
Five H Farms Solar Array | Maas Energy Works | Merced, CA | California Independent System Operator (CISO) | 2.3 GWh | Mar 2021 | Dec 2023 | Solar |
Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 31.5 GWh | - | Feb 2025 | Solar |
Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.9 GWh | Mar 2021 | Dec 2023 | Solar |
Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 256.0 GWh | Sep 2022 | Feb 2025 | Solar : 99.9% |
Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 285.7 GWh | Nov 2021 | Feb 2025 | Solar |
Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 10.9 GWh | Sep 2021 | Dec 2023 | Other Biomass Gas |
SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 14.5 GWh | Mar 2020 | Dec 2023 | Electricity used for energy storage : 53.9% Solar : 46.1% |
CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 5.6 GWh | Feb 2016 | Dec 2023 | Natural Gas |
SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2014 | Dec 2023 | Natural Gas |
ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.6 GWh | Aug 2021 | Dec 2023 | Solar |
Prologis L.P | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2018 | Dec 2023 | Solar |
Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.3 GWh | Sep 2021 | Dec 2023 | Solar |
CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2023 | Solar |
Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 1.2 GWh | Sep 2009 | Dec 2023 | Solar |
Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2016 | Dec 2023 | Solar |
Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 283.8 GWh | Jul 2022 | Feb 2025 | Solar |
AT&T San Diego | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2015 | Dec 2023 | Natural Gas |
University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Nov 2016 | Dec 2023 | Natural Gas |
Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 3.7 GWh | Aug 2014 | Dec 2023 | Solar |
Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2023 | Solar |
West Village Solar - Array 1Community Solar | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2022 | Dec 2023 | Solar |
Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 173.4 GWh | Jun 2021 | Feb 2025 | Wind |
Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 243.3 GWh | Jul 2023 | Feb 2025 | Solar |
Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 216.0 GWh | Feb 2021 | Feb 2025 | Wind |
West Village Solar - Array 2 Community Solar | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2022 | Dec 2023 | Solar |
BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 342.8 GWh | Jan 2022 | Feb 2025 | Solar |
Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 81.1 GWh | Feb 2022 | Feb 2025 | Solar |
Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 93.3 GWh | Feb 2022 | Feb 2025 | Solar |
Dissigno Healdsburg FPV, LLC | Palmetto Power Management LLC | Healdsburg, CA | California Independent System Operator (CISO) | 5.9 GWh | Nov 2020 | Dec 2023 | Solar |
El Dorado Solar, LLC | Greenbacker Renewable Energy Corporation | El Dorado Hills, CA | California Independent System Operator (CISO) | 3.3 GWh | Mar 2021 | Dec 2023 | Solar |
Van der Hoek Solar Array/ Dairy | Maas Energy Works | Helm, CA | California Independent System Operator (CISO) | 178.0 MWh | Jul 2017 | Dec 2022 | Solar |
Wonderful Huller & Shellling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 3.8 GWh | Jul 2021 | Dec 2023 | Solar |
Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 48.3 GWh | Aug 2021 | Dec 2023 | Solar |
Kings River Syphon | Orange Cove Irrigation District | Sanger, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 1990 | May 2023 | Water |
Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 13.1 GWh | Oct 2021 | Dec 2023 | Solar |
SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 503.2 GWh | Nov 2021 | Feb 2025 | Solar |
Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2016 | Dec 2023 | Solar |
CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2020 | Dec 2023 | Solar |
University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.2 GWh | Apr 2022 | Dec 2023 | Solar |
Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.8 GWh | Jul 2020 | Dec 2023 | Solar |
Diablo Canyon | Pacific Gas & Electric Co. | Avila Beach, CA | California Independent System Operator (CISO) | 18.3 TWh | Apr 1985 | Feb 2025 | Nuclear |
Coalinga Cogeneration Facility | Aera Energy LLC-Coalinga | Coalinga, CA | California Independent System Operator (CISO) | 44.4 GWh | May 1988 | Dec 2023 | Natural Gas |
Biola University Hybrid | Biola University | La Mirada, CA | California Independent System Operator (CISO) | 12.3 GWh | Mar 1990 | Feb 2025 | Natural Gas |
Southeast Kern River Cogen | Chevron USA Inc | Bakersfield, CA | California Independent System Operator (CISO) | 59.0 GWh | Jan 1989 | Feb 2025 | Natural Gas |
Watson Cogeneration | ARCO Products Co-Watson | Carson, CA | California Independent System Operator (CISO) | 2.3 TWh | Nov 1987 | Feb 2025 | Natural Gas : 84.2% Other Gas : 15.5% |
South Belridge Cogeneration Facility | AERA Energy LLC | McKittrick, CA | California Independent System Operator (CISO) | 477.1 GWh | Nov 1985 | Feb 2025 | Natural Gas |
Nacimiento Hydro Project | Monterey Cnty Water Res Agency | Bradley, CA | California Independent System Operator (CISO) | 18.6 GWh | Jun 1987 | Nov 2023 | Water |
Agnews Power Plant | OLS Energy-Agnews Inc. | San Jose, CA | California Independent System Operator (CISO) | 35.7 GWh | Oct 1990 | Dec 2023 | Natural Gas |
Stockton Biomass | DTE Stockton LLC | Stockton, CA | California Independent System Operator (CISO) | 326.3 GWh | Nov 1987 | Dec 2023 | Wood/Wood Waste Solids : 99.6% |
San Gorgonio Farms Wind Farm | San Gorgonio Farms Inc | Whitewater, CA | California Independent System Operator (CISO) | 61.8 GWh | Feb 1983 | Dec 2023 | Wind |
Wadham Energy LP | Wadham Energy Ltd Partners | Williams, CA | California Independent System Operator (CISO) | 74.4 GWh | Feb 1989 | Dec 2023 | Agricultural By-Products : 99.5% Natural Gas : 0.5% |
AltaGas Ripon Energy Inc. | AltaGas Ripon Energy Inc. | Ripon, CA | California Independent System Operator (CISO) | 2.8 GWh | Mar 1988 | Feb 2025 | Natural Gas |
East Portal Generator | Calleguas Mun Water District | Chatsworth, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 1986 | Dec 2023 | Water |
Wheelabrator Shasta | Shasta Sustainable Resource Management, Inc. | Anderson, CA | California Independent System Operator (CISO) | 276.1 GWh | Sep 1987 | Feb 2025 | Wood/Wood Waste Solids |
Site 980 65 | Madera-Chowchilla Power Auth | Madera, CA | California Independent System Operator (CISO) | 6.3 GWh | Jan 1985 | Nov 2023 | Water |
Forks of Butte Hydro Project | HYPOWER INC | Magalia, CA | California Independent System Operator (CISO) | 41.9 GWh | Feb 1992 | Dec 2023 | Water |
Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 61.3 GWh | Feb 1990 | Dec 2023 | Water |
Humboldt Sawmill Company | Mendocino Forest Products | Scotia, CA | California Independent System Operator (CISO) | 117.8 GWh | Dec 1937 | Feb 2025 | Wood/Wood Waste Solids : 99.7% |
San Diego State University | San Diego State University | San Diego, CA | California Independent System Operator (CISO) | 50.2 GWh | Aug 2002 | Feb 2025 | Natural Gas : 98.0% Solar : 2.0% |
University of California Santa Cruz | University of California Santa Cruz | Santa Cruz, CA | California Independent System Operator (CISO) | 35.9 GWh | Aug 2013 | Dec 2023 | Natural Gas : 90.8% Solar : 9.2% |
Calistoga Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 466.5 GWh | Feb 1984 | Feb 2025 | Geothermal |
Western Power & Steam Inc | Western Power and Steam II LLC | Bakersfield, CA | California Independent System Operator (CISO) | 22.9 GWh | Feb 1990 | Jan 2025 | Natural Gas |
Sierra Pacific Burney Facility | Sierra Pacific Industries | Burney, CA | California Independent System Operator (CISO) | 94.5 GWh | Sep 1986 | Dec 2023 | Wood/Wood Waste Solids |
Sierra Pacific Quincy Facility | Sierra Pacific Industries | Quincy, CA | California Independent System Operator (CISO) | 171.5 GWh | Nov 1986 | Dec 2023 | Wood/Wood Waste Solids |
US Borax | U S Borax Inc | Boron, CA | California Independent System Operator (CISO) | 267.4 GWh | Jun 1984 | Feb 2025 | Natural Gas |
Phillips 66 Rodeo Refinery | Phillips 66 Company | Rodeo, CA | California Independent System Operator (CISO) | 291.0 GWh | Apr 1987 | Aug 2024 | Other Gas : 72.8% Natural Gas : 27.2% |
Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 5.9 GWh | Sep 1983 | Sep 2023 | Water |
Sycamore Cogeneration | Sycamore Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 273.4 GWh | Nov 1987 | Feb 2025 | Natural Gas |
Bear Creek | Central Rivers Power US, LLC | Shingletown, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 1989 | Dec 2023 | Water |
Coram Energy LLC (ECT) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 32.0 GWh | Apr 2005 | Dec 2023 | Wind |
Berry Cogen | Berry Petroleum Co | Taft, CA | California Independent System Operator (CISO) | 13.7 GWh | Nov 1986 | Feb 2025 | Natural Gas |
New Hogan Power Plant | Modesto Irrigation District | Valley Springs, CA | California Independent System Operator (CISO) | 10.8 GWh | Mar 1989 | Dec 2023 | Water |
Olsen | Olsen Power Partners | Whitmore, CA | California Independent System Operator (CISO) | 18.4 GWh | Dec 1989 | Dec 2023 | Water |
Oak Creek Energy Systems I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 37.8 GWh | May 1982 | Dec 2023 | Wind |
B Braun Medical | B Braun Medical Inc | Irvine, CA | California Independent System Operator (CISO) | 27.2 GWh | Oct 1982 | Dec 2023 | Natural Gas |
Sand Bar Power Plant | Tri-Dam Power Authority | Stanislaus Ntl. Fores, CA | California Independent System Operator (CISO) | 124.3 GWh | Apr 1986 | Dec 2023 | Water |
Frankenheimer Power Plant | Turlock Irrigation District | Oakdale, CA | California Independent System Operator (CISO) | 3.3 GWh | Feb 1983 | Oct 2023 | Water |
Nelson Creek | Nelson Creek Power Inc | Big Bend, CA | California Independent System Operator (CISO) | 2.6 GWh | Sep 1989 | Dec 2023 | Water |
Oxnard Wastewater Treatment Plant | Oxnard City of | Oxnard, CA | California Independent System Operator (CISO) | 4.7 GWh | Jul 1981 | Feb 2025 | Other Biomass Gas : 92.6% Natural Gas : 7.4% |
San Dimas Wash Generating Station | San Gabriel Valley Mun Wtr Dt | San Dimas, CA | California Independent System Operator (CISO) | 2.9 GWh | Feb 1986 | Dec 2023 | Water |
San Antonio Regional Hospital | San Antonio Regional Hospital | Upland, CA | California Independent System Operator (CISO) | 10.7 GWh | Dec 1984 | Dec 2023 | Natural Gas |
Coram Energy LLC | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 36.3 GWh | Dec 2004 | Dec 2023 | Wind |
Pacific-Ultrapower Chinese Station | IHI Power Services Corp | Jamestown, CA | California Independent System Operator (CISO) | 143.6 GWh | Sep 1986 | Feb 2025 | Wood/Wood Waste Solids : 99.6% |
Kern Front Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 22.0 GWh | Jan 1989 | Dec 2023 | Natural Gas |
High Sierra Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 23.3 GWh | Feb 1989 | Dec 2023 | Natural Gas |
Dominguez Plant | Eco Services Corp. | Long Beach, CA | California Independent System Operator (CISO) | 13.7 GWh | Jul 1976 | Dec 2023 | Waste Heat |
Victory Garden (Tehachapi) | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 25.3 GWh | Nov 1981 | Dec 2023 | Wind |
Painted Hills Wind Park | Terra-Gen Operating Co-Wind | Whitewater, CA | California Independent System Operator (CISO) | 172.8 GWh | Oct 1985 | Feb 2025 | Wind |
Sky River Wind Energy Center | Sky River Wind LLC | Tehachapi, CA | California Independent System Operator (CISO) | 201.6 GWh | Jan 1991 | Dec 2023 | Wind |
Summary of Power Plants By State
Figures are based on February 2025 generation numbers.State | Rank | Active Plants | Feb 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,454.23 GWh |
Alaska | # 48 | 136 | 486.57 GWh |
Arizona | # 15 | 165 | 7,949.76 GWh |
Arkansas | # 28 | 80 | 4,750.62 GWh |
California | # 5 | 1,593 | 15,002.38 GWh |
Colorado | # 30 | 265 | 4,484.87 GWh |
Connecticut | # 34 | 152 | 3,568.74 GWh |
Delaware | # 49 | 31 | 376.39 GWh |
District of Columbia | # 51 | 12 | 16.79 GWh |
Florida | # 3 | 304 | 17,498.62 GWh |
Georgia | # 8 | 241 | 10,439.72 GWh |
Hawaii | # 46 | 66 | 666.80 GWh |
Idaho | # 44 | 143 | 1,423.14 GWh |
Illinois | # 4 | 338 | 15,696.94 GWh |
Indiana | # 12 | 203 | 9,055.86 GWh |
Iowa | # 20 | 281 | 6,506.74 GWh |
Kansas | # 24 | 157 | 5,156.03 GWh |
Kentucky | # 21 | 56 | 6,138.53 GWh |
Louisiana | # 17 | 80 | 7,192.83 GWh |
Maine | # 45 | 159 | 1,123.08 GWh |
Maryland | # 39 | 181 | 2,579.41 GWh |
Massachusetts | # 42 | 599 | 1,604.74 GWh |
Michigan | # 10 | 267 | 10,280.63 GWh |
Minnesota | # 27 | 740 | 5,066.98 GWh |
Mississippi | # 22 | 55 | 5,414.37 GWh |
Missouri | # 19 | 118 | 6,559.07 GWh |
State | Rank | Active Plants | Feb 2025 Generation |
---|---|---|---|
Montana | # 40 | 69 | 2,324.85 GWh |
Nebraska | # 36 | 119 | 3,333.41 GWh |
Nevada | # 37 | 109 | 3,002.03 GWh |
New Hampshire | # 43 | 56 | 1,435.29 GWh |
New Jersey | # 31 | 375 | 4,428.89 GWh |
New Mexico | # 38 | 140 | 2,585.31 GWh |
New York | # 11 | 830 | 10,266.35 GWh |
North Carolina | # 9 | 880 | 10,422.85 GWh |
North Dakota | # 33 | 57 | 3,825.72 GWh |
Ohio | # 6 | 190 | 12,150.65 GWh |
Oklahoma | # 18 | 131 | 6,818.46 GWh |
Oregon | # 25 | 259 | 5,152.36 GWh |
Pennsylvania | # 2 | 240 | 21,039.59 GWh |
Rhode Island | # 47 | 95 | 598.64 GWh |
South Carolina | # 14 | 198 | 8,120.13 GWh |
South Dakota | # 41 | 52 | 1,740.50 GWh |
Tennessee | # 26 | 84 | 5,101.16 GWh |
Texas | # 1 | 813 | 43,152.96 GWh |
Utah | # 35 | 119 | 3,334.96 GWh |
Vermont | # 50 | 112 | 195.02 GWh |
Virginia | # 13 | 215 | 8,814.15 GWh |
Washington | # 16 | 137 | 7,908.11 GWh |
West Virginia | # 29 | 36 | 4,645.25 GWh |
Wisconsin | # 23 | 221 | 5,315.49 GWh |
Wyoming | # 32 | 73 | 3,941.95 GWh |