Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| San Diego - EMDF at San Diego | California PV Energy 3, LLC | San Diego, CA | California Independent System Operator (CISO) | 4.9 GWh | Mar 2021 | Dec 2025 | Solar |
| San Diego - NCRC at Vista | California PV Energy 3, LLC | Vista, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2021 | Dec 2025 | Solar |
| Maverick Solar 6, LLC | Maverick Solar 6, LLC | Desert Center, CA | California Independent System Operator (CISO) | 237.8 GWh | Oct 2021 | Jun 2026 | Solar |
| Moonlight Packing - Phase 2 | CalCom Energy | Reedley, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2019 | Dec 2025 | Solar |
| TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 19.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| Walnut Unified School District Walnut HS | Tesla Inc. | Walnut, CA | California Independent System Operator (CISO) | 327.0 MWh | Jan 2020 | Jun 2025 | Solar |
| Camino Solar Hybrid | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 134.4 GWh | Mar 2025 | Jun 2026 | Solar |
| Titan Solar 1 (CA) | Titan Solar 1, LLC | Borrego Springs, CA | California Independent System Operator (CISO) | 139.9 GWh | Nov 2020 | Jun 2026 | Solar |
| ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2021 | Dec 2025 | Solar |
| Maverick Solar 7, LLC | Maverick Solar 7, LLC | Desert Center, CA | California Independent System Operator (CISO) | 400.7 GWh | Nov 2021 | Jun 2026 | Solar |
| SE Athos II, LLC | SE Athos II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 537.9 GWh | Nov 2021 | Jun 2026 | Solar |
| Vacaville Hospital | KP Vacaville Solar, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2019 | Dec 2025 | Solar |
| AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 17.4 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 698.2 GWh | Oct 2021 | Jun 2026 | Solar |
| Maverick Solar 4, LLC | Maverick Solar 4, LLC | Desert Center, CA | California Independent System Operator (CISO) | 296.8 GWh | Nov 2020 | Jun 2026 | Solar |
| PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2018 | Dec 2025 | Solar |
| Dissigno Healdsburg FPV, LLC | Palmetto Power Management LLC | Healdsburg, CA | California Independent System Operator (CISO) | 5.6 GWh | Nov 2020 | Dec 2025 | Solar |
| CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 236.3 GWh | Jun 2022 | Dec 2025 | Geothermal |
| Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 204.9 GWh | Feb 2021 | Jun 2026 | Wind |
| Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 193.3 GWh | Nov 2020 | Jun 2026 | Solar |
| D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.2 GWh | Feb 2019 | Dec 2025 | Solar |
| Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2020 | Dec 2025 | Solar |
| California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2018 | Dec 2025 | Solar |
| CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 9.0 GWh | Dec 2018 | Dec 2025 | Natural Gas |
| Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 2020 | Dec 2025 | Solar |
| KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 12.5 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 12.3 GWh | Nov 2018 | Dec 2025 | Natural Gas |
| Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2020 | Dec 2024 | Solar |
| EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 19.4 GWh | Aug 2019 | Dec 2025 | Natural Gas |
| EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 31.2 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 31.1 GWh | Dec 2017 | Dec 2025 | Natural Gas |
| GEN005 Antibody Fuel Cell | 2016 ESA Project Company, LLC | Oceanside, CA | California Independent System Operator (CISO) | 19.5 GWh | Mar 2019 | Dec 2025 | Natural Gas |
| KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 16.4 GWh | Mar 2018 | Dec 2025 | Natural Gas |
| JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2019 | Dec 2025 | Natural Gas |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 701.0 MWh | Mar 2016 | Dec 2025 | Solar |
| Mesa Wind Repower | Mesa Wind Repower | Whitewater, CA | California Independent System Operator (CISO) | 80.1 GWh | May 2024 | Dec 2024 | Wind |
| Luna Valley | Luna Valley Solar I, LLC | Mendota, CA | California Independent System Operator (CISO) | 314.9 GWh | Jul 2025 | Jun 2026 | Solar |
| Costa View Farms | 127 CVF, LLC | Madera, CA | California Independent System Operator (CISO) | 5.1 GWh | May 2024 | Dec 2024 | Solar |
| Bishop Ranch - BR 15-DD | Alcosta Boulevard BR 15-DD Solar Project 2020, LLC | San Ramon, CA | California Independent System Operator (CISO) | 62.0 MWh | Feb 2025 | May 2025 | Solar |
| Dos Palos Clean Power | Dos Palos Clean Power LLC | Dos Palos, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2025 | Dec 2025 | Solar |
| Foster Clean Power B | Foster Clean Power B LLC | Arcata, CA | California Independent System Operator (CISO) | 901.0 MWh | Aug 2025 | Dec 2025 | Solar |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 2.2 GWh | Jul 2024 | Dec 2025 | Solar |
| Paso Robles - Municipal Airport | Onyx Asset Services Group | Paso Robles, CA | California Independent System Operator (CISO) | 7.6 GWh | Dec 2023 | Dec 2025 | Solar |
| BCE Seal Beach | BCE Seal Beach | Seal Beach, CA | California Independent System Operator (CISO) | 9.8 GWh | Oct 2025 | Jun 2026 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.2 GWh | Feb 2024 | Dec 2025 | Solar |
| Wonderful Orchards - West Valley | Wonderful Renewable Energy, LLC. | Blackwells Corner, CA | California Independent System Operator (CISO) | 8.0 GWh | Sep 2020 | Dec 2025 | Solar |
| Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2023 | Dec 2024 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Hollister Wastewater Facility | SunStrong Management, LLC | Hollister, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2011 | Dec 2025 | Solar |
| North Kern 2 | Madison Energy Investments LLC | City of Shafter, CA | California Independent System Operator (CISO) | 6.1 GWh | Jun 2024 | Dec 2025 | Solar |
| Bishop Ranch BR 1-X | Bollinger Canyon Road BR 1-X Solar Project 2020 | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2024 | Solar |
| RB Inyokern Solar WDAT 1203 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 58.3 GWh | Nov 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1281 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 34.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Lone Oak | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 6.0 GWh | Feb 2023 | Dec 2025 | Solar |
| Lockhart Solar PV IV, LLC | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 18.7 GWh | - | Jun 2026 | Solar |
| Grossmont College | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 4.4 GWh | Feb 2023 | Dec 2024 | Solar |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 995.0 MWh | May 2024 | Dec 2025 | Solar |
| Rio Vista Solar | Rio Vista Executive Boat & RV Storage, LLC | Rio Vista, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2025 | Dec 2025 | Solar |
| Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 8.5 GWh | Oct 2023 | Dec 2025 | Solar |
| Foster Clean Power A | Foster Clean Power A, LLC | Arcata, CA | California Independent System Operator (CISO) | 846.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2024 | Dec 2025 | Solar |
| Rosamond South 1 | Golden Fields Solar IV, LLC | Rosamond, CA | California Independent System Operator (CISO) | 370.3 GWh | Jul 2025 | Jun 2026 | Solar |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2024 | Dec 2024 | Solar |
| Open Sky Ranch Inc | Bravo REC Management LLC | Riverdale, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2024 | Dec 2025 | Solar |
| City of Atwater NEM | SoCore Energy LLC | Atwater, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Dixie Creek Dairy Solar | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Jun 2024 | Dec 2025 | Solar |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2024 | Dec 2025 | Solar |
| Allied Potato | Renewable Solar, Inc | Bakersfield, CA | California Independent System Operator (CISO) | 309.9 MWh | Apr 2025 | Dec 2025 | Solar |
| Desert Breeze Solar, LLC | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 69.4 GWh | - | Jun 2026 | Solar |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 371.0 MWh | Aug 2023 | Dec 2025 | Solar |
| Lemoore West | Leprino Foods | Lemoore, CA | California Independent System Operator (CISO) | 16.7 GWh | Nov 2022 | Dec 2025 | Solar |
| Thermo Fisher Pleasanton | TotalEnergies Renewables USA LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.5 GWh | Jun 2025 | Dec 2025 | Solar |
| Amazon Visalia (FAT2) | Madison Energy Investments LLC | Visalia, CA | California Independent System Operator (CISO) | 3.7 GWh | Feb 2023 | Dec 2025 | Solar |
| KP Ontario Vineyard Solar | KP Ontario Vineyard O.P. Surgicenter B Solar LLC | Ontario, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Sun Pacific - Lerdo | JKB Energy | Shafter, CA | California Independent System Operator (CISO) | 6.0 GWh | Sep 2020 | Dec 2025 | Solar |
| North Kern 1 | Madison Energy Investments LLC | Shafter, CA | California Independent System Operator (CISO) | 6.9 GWh | May 2023 | Dec 2025 | Solar |
| AVI Bakersfield | Anthony Vineyards, Inc. | Bakersfield, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2022 | Dec 2025 | Solar |
| Wheeler Ridge 2 | Madison Energy Investments LLC | Arvin, CA | California Independent System Operator (CISO) | 13.8 GWh | Oct 2023 | Dec 2025 | Solar |
| Avalon Dairy | Renewable Solar, Inc | Wasco, CA | California Independent System Operator (CISO) | 792.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Oaks HOA | Onyx Asset Services Group | Ione, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2025 | Dec 2025 | Solar |
| Sutter Home Winery Westside | REC SHW, LLC | Lodi, CA | California Independent System Operator (CISO) | 295.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Las Positas College | Chabot Las Positas Community College District | Livermore, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2024 | Dec 2025 | Solar |
| GreenStruxure BBU004, LLC | ClearGen LLC | Montebello, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2023 | Dec 2025 | Solar |
| Sutter Home Winery GIR | Westbound Solar 3, LLC | American Canyon, CA | California Independent System Operator (CISO) | 1.9 GWh | Jul 2023 | Dec 2025 | Solar |
| Sutter Santa Rosa Solar | Sutter Santa Rosa Solar LLC | Santa Rosa, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Kern Del Oro | REC KDO, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Central San | REC CSD, LLC | Martinez, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2024 | Dec 2025 | Solar |
| North Kern 3 | Madison Energy Investments LLC | Bakersfield, CA | California Independent System Operator (CISO) | 13.6 GWh | Nov 2023 | Dec 2025 | Solar |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 418.8 MWh | Jun 2024 | Dec 2025 | Solar |
| Palm Springs DAC PV | Palm Springs USD | Palm Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2021 | Dec 2025 | Solar |
| Community Solar Utica 1, LLC | AETS OpCo Holdings LLC | Kettleman, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2025 | Dec 2025 | Solar |
| JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2020 | Dec 2025 | Solar |
| Pivot Energy PPA 22 | Pivot Energy | Visalia, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Blue Moon Farms | Bravo REC Management LLC | Tipton, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2024 | Dec 2025 | Solar |
| Tipton 2 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |