Directory of Power Plants in Florida
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
ACE-Stanton A PV | ACE-Stanton A, LLC | Orlando, FL | Florida Municipal Power Pool (FMPP) | 8.5 GWh | Aug 2017 | Dec 2022 | Solar |
ACE-Stanton PV | ACE-Stanton, LLC | Orlando, FL | Florida Municipal Power Pool (FMPP) | 9.7 GWh | Aug 2017 | Dec 2022 | Solar |
AEP Jacksonville Solar Project | AEP Onsite Partners, LLC | Duval, FL | JEA (JEA) | 13.1 GWh | Apr 2017 | Dec 2022 | Solar |
Alafia Solar | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 21.0 GWh | - | Feb 2024 | Solar |
Altamonte Mall | Altamonte Mall | Altamonte Springs, FL | Duke Energy Florida, Inc. (FPC) | 952.5 MWh | Apr 2016 | Dec 2022 | Solar |
Anclote | Duke Energy Florida, LLC | Holiday, FL | Duke Energy Florida, Inc. (FPC) | 2.0 TWh | Sep 1974 | Feb 2024 | Natural Gas |
Anheuser-Busch Jacksonville | Anheuser-Busch Inc | Jacksonville, FL | JEA (JEA) | 81.0 GWh | Oct 1987 | Dec 2022 | Natural Gas |
Anhinga Solar Energy Center | Florida Power & Light Co | Green Cove Springs, FL | Florida Power & Light Co. (FPL) | 143.6 GWh | - | Feb 2024 | Solar |
Apalachee | Florida Power & Light Co | Marianna, FL | Florida Power & Light Co. (FPL) | 162.7 GWh | - | Feb 2024 | Solar |
Arvah B Hopkins | City of Tallahassee - (FL) | Tallahassee, FL | City of Tallahassee (TAL) | 1.8 TWh | Jan 1970 | Feb 2024 | Natural Gas : 99.9% |
Babcock Preserve | Florida Power & Light Co | Punta Gorda, FL | Florida Power & Light Co. (FPL) | 165.8 GWh | Dec 2019 | Feb 2024 | Solar |
Babcock Solar Energy Center Hybrid | Florida Power & Light Co | Punta Gorda, FL | Florida Power & Light Co. (FPL) | 154.4 GWh | Nov 2016 | Feb 2024 | Solar |
Balm Solar | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 111.5 GWh | Aug 2018 | Feb 2024 | Solar |
Baptist Medical Center | Baptist Memorial Hospital | Jacksonville, FL | JEA (JEA) | 21.9 GWh | Nov 1983 | Feb 2024 | Natural Gas |
Barefoot Bay Solar Energy Center | Florida Power & Light Co | Sebastian, FL | Florida Power & Light Co. (FPL) | 161.9 GWh | Feb 2018 | Feb 2024 | Solar |
Bartow Solar Energy LLC | Alchemy Renewable Energy | Bartow, FL | Duke Energy Florida, Inc. (FPC) | 12.6 GWh | Feb 2018 | Dec 2022 | Solar |
Bay Ranch Solar Power Plant | Duke Energy Florida, LLC | Panama City, FL | Duke Energy Florida, Inc. (FPC) | 153.4 GWh | - | Feb 2024 | Solar |
Bay Trail Solar Power Plant | Duke Energy Florida, LLC | Crystal River, FL | Duke Energy Florida, Inc. (FPC) | 141.8 GWh | Oct 2022 | Feb 2024 | Solar |
Bayboro | Duke Energy Florida, LLC | St. Petersburg, FL | Duke Energy Florida, Inc. (FPC) | 3.7 GWh | Mar 1973 | Dec 2022 | Distillate Fuel Oil |
Beautyberry | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 16.4 GWh | - | Feb 2024 | Solar |
Bell Ridge Solar | Bell Ridge Solar, LLC | Trenton, FL | Seminole Electric Cooperative (SEC) | 78.6 GWh | - | Feb 2024 | Solar |
Big Bend | Tampa Electric Co | Apollo Beach, FL | Tampa Electric Company (TEC) | 5.5 TWh | Sep 1970 | Feb 2024 | Natural Gas : 86.9% Bituminous Coal : 12.8% |
Big Bend Agrivoltaics | Tampa Electric Co | Apollo Beach, FL | Tampa Electric Company (TEC) | 989.0 MWh | May 2022 | Dec 2022 | Solar |
Big Bend Floating Solar I | Tampa Electric Co | Gibsonton, FL | Tampa Electric Company (TEC) | 401.0 MWh | Feb 2022 | Dec 2022 | Solar |
Big Bend II Solar | Tampa Electric Co | Apollo Beach, FL | Tampa Electric Company (TEC) | 81.8 GWh | Dec 2021 | Feb 2024 | Solar |
Blackwater River Solar Energy Center | Florida Power & Light Co | Milton, FL | Florida Power & Light Co. (FPL) | 132.8 GWh | - | Feb 2024 | Solar |
Blue Cypress Solar Energy Center | Florida Power & Light Co | Vero Beach, FL | Florida Power & Light Co. (FPL) | 157.9 GWh | Feb 2018 | Feb 2024 | Solar |
Blue Heron Solar | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 165.0 GWh | Dec 2019 | Feb 2024 | Solar |
Blue Springs | Florida Power & Light Co | Marianna, FL | Southern Company Services, Inc. - Trans (SOCO) | 149.9 GWh | Nov 2021 | Feb 2024 | Solar |
Bluefield Preserve Solar | Florida Power & Light Co | Okeechobee, FL | Florida Power & Light Co. (FPL) | 166.4 GWh | - | Feb 2024 | Solar |
Bonnie Mine Solar | Tampa Electric Co | Bartow, FL | Tampa Electric Company (TEC) | 57.7 GWh | Dec 2018 | Feb 2024 | Solar |
Brandy Branch | JEA | Baldwin, FL | JEA (JEA) | 5.1 TWh | Apr 2001 | Feb 2024 | Natural Gas |
Brevard | EPP Renewable Energy | Cocoa, FL | Florida Power & Light Co. (FPL) | 32.2 GWh | Apr 2008 | Dec 2022 | Landfill Gas |
Buckeye Florida LP | Buckeye Florida Ltd Partners | Perry, FL | Duke Energy Florida, Inc. (FPC) | 292.1 GWh | Jun 1953 | Dec 2022 | Black Liquor : 53.9% Wood/Wood Waste Solids : 25.8% Natural Gas : 19.3% Residual Fuel Oil : 1.0% |
Butler Plaza | Clean Focus Yield, LLC | Gainesville, FL | Gainesville Regional Utilities (GVL) | 2.0 GWh | Nov 2010 | Dec 2022 | Solar |
C D McIntosh Jr | City of Lakeland - (FL) | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 1.9 TWh | Dec 1969 | Feb 2024 | Natural Gas |
Caloosahatchee | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 12.4 GWh | - | Feb 2024 | Solar |
Cane Island | Kissimmee Utility Authority | Intercession City, FL | Florida Municipal Power Pool (FMPP) | 4.4 TWh | Oct 1994 | Feb 2024 | Natural Gas |
Canoe | Florida Power & Light Co | Holt, FL | Florida Power & Light Co. (FPL) | 19.7 GWh | - | Feb 2024 | Solar |
Cape Canaveral | Florida Power & Light Co | Cocoa, FL | Florida Power & Light Co. (FPL) | 7.6 TWh | Mar 2013 | Feb 2024 | Natural Gas : 99.9% |
Cattle Ranch | Florida Power & Light Co | Arcadia, FL | Florida Power & Light Co. (FPL) | 155.4 GWh | Dec 2019 | Feb 2024 | Solar |
Central Energy Plant | Reedy Creek Improvement Dist | Lake Buena Vista, FL | Duke Energy Florida, Inc. (FPC) | 249.8 MWh | Dec 1988 | Dec 2022 | Natural Gas |
Charlie Creek Solar Power Plant | Duke Energy Florida, LLC | Wauchula, FL | Duke Energy Florida, Inc. (FPC) | 172.7 GWh | Jul 2022 | Feb 2024 | Solar |
Chautauqua Solar Energy Center | Florida Power & Light Co | Defuniak Springs, FL | Florida Power & Light Co. (FPL) | 160.8 GWh | - | Feb 2024 | Solar |
Citrus Ridge Solar | FL Solar 5, LLC | Bay Lake, FL | Duke Energy Florida, Inc. (FPC) | 75.2 GWh | Nov 2018 | Feb 2024 | Solar |
Citrus Solar Energy Center Hybrid | Florida Power & Light Co | Arcadia, FL | Florida Power & Light Co. (FPL) | 157.0 GWh | Nov 2016 | Feb 2024 | Solar |
Clewiston Sugar House | United States Sugar Corp | Clewiston, FL | Duke Energy Florida, Inc. (FPC) | 297.3 GWh | Oct 1997 | Feb 2024 | Agricultural By-Products : 99.7% |
Columbia Solar Power Plant | Duke Energy Florida, LLC | Fort White, FL | Duke Energy Florida, Inc. (FPC) | 150.7 GWh | Feb 2020 | Feb 2024 | Solar |
Coral Farms Solar Energy Center | Florida Power & Light Co | Florahome, FL | Florida Power & Light Co. (FPL) | 142.3 GWh | Dec 2017 | Feb 2024 | Solar |
CoTAL Solar Farm | FL Solar 1, LLC | Tallahassee, FL | City of Tallahassee (TAL) | 42.7 GWh | Nov 2017 | Dec 2022 | Solar |
Cotton Creek Solar Energy Center | Florida Power & Light Co | McDavid, FL | Southern Company Services, Inc. - Trans (SOCO) | 155.2 GWh | Nov 2021 | Feb 2024 | Solar |
Covanta Lake County Energy | Covanta Lake Inc | Okahumpka, FL | Duke Energy Florida, Inc. (FPC) | 88.0 GWh | Aug 1990 | Feb 2024 | Non-biogenic Municipal Solid Waste : 54.4% Biogenic Municipal Solid Waste : 44.5% Natural Gas : 1.2% |
Crystal River | Duke Energy Florida, LLC | Crystal River, FL | Duke Energy Florida, Inc. (FPC) | 17.3 TWh | Sep 1966 | Feb 2024 | Natural Gas : 75.3% Bituminous Coal : 24.5% |
CSL Gas Recovery | WM Renewable Energy LLC | Pompano Beach, FL | Florida Power & Light Co. (FPL) | 46.8 GWh | Feb 1989 | Dec 2022 | Landfill Gas |
Curtis H Stanton Energy Center | Stanton Clean Energy LLC | Orlando, FL | Duke Energy Florida, Inc. (FPC) | 3.8 TWh | Sep 2003 | Feb 2024 | Natural Gas |
Cutrale Citrus Juices USA I | Cutrale Citrus Juices USA Inc | Leesburg, FL | Duke Energy Florida, Inc. (FPC) | 21.9 GWh | Nov 2010 | Dec 2022 | Natural Gas |
Cutrale Citrus Juices USA II | Cutrale Citrus Juices USA Inc | Auburndale, FL | Tampa Electric Company (TEC) | 43.5 GWh | Nov 2010 | Dec 2022 | Natural Gas |
Dania Beach 7 | Florida Power & Light Co | Ft. Lauderdale, FL | Florida Power & Light Co. (FPL) | 6.7 TWh | Apr 2022 | Feb 2024 | Natural Gas |
Daytona International Speedway Solar | Florida Power & Light Co | Daytona Beach, FL | Florida Power & Light Co. (FPL) | 1.5 GWh | Apr 2016 | Dec 2022 | Solar |
DeBary | Duke Energy Florida, LLC | DeBary, FL | Duke Energy Florida, Inc. (FPC) | 123.2 GWh | Nov 1975 | Dec 2022 | Natural Gas : 82.2% Distillate Fuel Oil : 17.8% |
Debary Solar Power Plant | Duke Energy Florida, LLC | DeBary, FL | Duke Energy Florida, Inc. (FPC) | 127.2 GWh | Apr 2020 | Feb 2024 | Solar |
Deerhaven Generating Station | Gainesville Regional Utilities | Gainesville, FL | Gainesville Regional Utilities (GVL) | 865.2 GWh | Jul 1972 | Feb 2024 | Natural Gas : 97.8% Bituminous Coal : 2.2% |
Deerhaven Renewable | Gainesville Regional Utilities | Gainesville, FL | Gainesville Regional Utilities (GVL) | 297.5 GWh | Nov 2013 | Feb 2024 | Wood/Wood Waste Solids : 99.7% |
DeSoto Next Generation Solar Energy | Florida Power & Light Co | Arcadia, FL | Florida Power & Light Co. (FPL) | 40.4 GWh | Sep 2009 | Dec 2022 | Solar |
Discovery Solar Center | Florida Power & Light Co | Merrit Island, FL | Florida Power & Light Co. (FPL) | 156.2 GWh | Apr 2021 | Feb 2024 | Solar |
Dover Solar | Tampa Electric Co | Dover, FL | Tampa Electric Company (TEC) | 9.4 GWh | - | Feb 2024 | Solar |
Duette Solar Power Plant | Duke Energy Florida, LLC | Parrish, FL | Duke Energy Florida, Inc. (FPC) | 151.2 GWh | Sep 2021 | Feb 2024 | Solar |
Durrance | Tampa Electric Co | Mulberry, FL | Tampa Electric Company (TEC) | 114.5 GWh | Dec 2020 | Feb 2024 | Solar |
Echo River Solar | Florida Power & Light Co | Live Oak, FL | Florida Power & Light Co. (FPL) | 172.3 GWh | Mar 2020 | Feb 2024 | Solar |
Egret Solar Center | Florida Power & Light Co | Glen St. Mary, FL | Florida Power & Light Co. (FPL) | 149.2 GWh | Nov 2020 | Feb 2024 | Solar |
Eight Flags Energy | Eight Flags Energy LLC | Fernandina Beach, FL | JEA (JEA) | 159.3 GWh | Jun 2016 | Dec 2022 | Natural Gas |
Elder Branch | Florida Power & Light Co | Parrish, FL | Florida Power & Light Co. (FPL) | 190.2 GWh | Dec 2021 | Feb 2024 | Solar |
Everglades Solar Energy Center | Florida Power & Light Co | Homestead, FL | Florida Power & Light Co. (FPL) | 155.1 GWh | - | Feb 2024 | Solar |
Fernandina Beach Mill | WestRock, Fernandina Beach | Fernandina Beach, FL | JEA (JEA) | 579.8 GWh | Aug 1982 | Feb 2024 | Black Liquor : 50.1% Natural Gas : 25.5% Wood/Wood Waste Solids : 18.6% Bituminous Coal : 4.6% Distillate Fuel Oil : 1.2% |
Fernandina Plant | Rayonier Advanced Materials | Fernandina Beach, FL | JEA (JEA) | 244.2 GWh | Nov 1939 | Dec 2022 | Wood/Wood Waste Solids : 39.1% Wood Waste Liquids, excluding Black Liquor : 38.4% Natural Gas : 19.1% Other Biomass Solids : 2.4% Tire-derived Fuels : 0.7% |
First City Solar Energy Center | Florida Power & Light Co | McDavid, FL | Florida Power & Light Co. (FPL) | 125.9 GWh | - | Feb 2024 | Solar |
FIU Solar | Florida Power & Light Co | Miami, FL | Florida Power & Light Co. (FPL) | 917.9 MWh | Apr 2016 | Dec 2022 | Solar |
FL Solar 4, LLC | FL Solar 4, LLC | Tallahassee, FL | City of Tallahassee (TAL) | 75.3 GWh | Nov 2019 | Feb 2024 | Solar |
Florida's Natural Growers | Citrus World Inc | Lake Wales, FL | Duke Energy Florida, Inc. (FPC) | 62.6 GWh | Nov 1989 | Dec 2022 | Natural Gas |
Fort Drum Energy Center | Florida Power & Light Co | Vero Beach, FL | Florida Power & Light Co. (FPL) | 140.9 GWh | May 2021 | Feb 2024 | Solar |
Fort Green Solar Power Plant | Duke Energy Florida, LLC | Bowling Green, FL | Duke Energy Florida, Inc. (FPC) | 134.1 GWh | Jul 2022 | Feb 2024 | Solar |
Fort Myers | Florida Power & Light Co | Ft. Myers, FL | Florida Power & Light Co. (FPL) | 10.7 TWh | Oct 1958 | Feb 2024 | Natural Gas |
FPL Cavendish Solar Energy Center | Florida Power & Light Co | Okeechobee, FL | Florida Power & Light Co. (FPL) | 144.1 GWh | - | Feb 2024 | Solar |
FPL Chipola River Solar Energy Center | Florida Power & Light Co | Altha, FL | Florida Power & Light Co. (FPL) | 138.5 GWh | - | Feb 2024 | Solar |
FPL Cypress Pond Solar | Florida Power & Light Co | Vernon, FL | Florida Power & Light Co. (FPL) | 122.9 GWh | - | Feb 2024 | Solar |
FPL Etonia Creek | Florida Power & Light Co | Palatka, FL | Florida Power & Light Co. (FPL) | 105.3 GWh | - | Feb 2024 | Solar |
FPL Flowers Creek Solar Energy Center | Florida Power & Light Co | Altha, FL | Florida Power & Light Co. (FPL) | 134.9 GWh | - | Feb 2024 | Solar |
FPL Saw Palmetto Solar Energy Center | Florida Power & Light Co | Youngstown, FL | Florida Power & Light Co. (FPL) | 134.2 GWh | - | Feb 2024 | Solar |
FPL Shirer Branch Solar Energy Center | Florida Power & Light Co | Clarksville, FL | Florida Power & Light Co. (FPL) | 159.2 GWh | - | Feb 2024 | Solar |
G2 Energy Marion LLC | G2 Energy LLC | Ocala, FL | Duke Energy Florida, Inc. (FPC) | 13.5 GWh | Dec 2008 | Dec 2022 | Landfill Gas |
Georgia-Pacific Palatka Operations | Georgia-Pacific Consr Ops LLC-Palatka | Palatka, FL | Florida Power & Light Co. (FPL) | 318.4 GWh | May 1956 | Dec 2022 | Black Liquor : 53.2% Natural Gas : 46.8% |
Ghost Orchid Solar Energy Center | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 153.2 GWh | Dec 2021 | Feb 2024 | Solar |
Goldfinch | Goldfinch (Lakeland) | Lakeland, FL | Florida Municipal Power Pool (FMPP) | 2.8 GWh | Nov 2016 | Dec 2022 | Solar |
Grange Hall Solar | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 102.7 GWh | Dec 2018 | Feb 2024 | Solar |
Greenland Energy Center | JEA | Jacksonville, FL | JEA (JEA) | 574.3 GWh | May 2011 | Dec 2022 | Natural Gas |
Grove | Florida Power & Light Co | Vero Beach, FL | Florida Power & Light Co. (FPL) | 164.4 GWh | Dec 2021 | Feb 2024 | Solar |
Gulf Clean Energy Center | Florida Power & Light Co | Pensacola, FL | Southern Company Services, Inc. - Trans (SOCO) | 2.6 TWh | Jun 1959 | Feb 2024 | Natural Gas : 99.9% |
Gulf Coast Solar Center I | Arevon Energy, Inc. | Valparaiso, FL | Southern Company Services, Inc. - Trans (SOCO) | 57.3 GWh | May 2017 | Feb 2024 | Solar |
Gulf Coast Solar Center II | Arevon Energy, Inc. | Navarre, FL | Southern Company Services, Inc. - Trans (SOCO) | 82.6 GWh | Oct 2017 | Feb 2024 | Solar |
Gulf Coast Solar Center III | Arevon Energy, Inc. | Bellview, FL | Southern Company Services, Inc. - Trans (SOCO) | 89.6 GWh | Oct 2017 | Feb 2024 | Solar |
Browse Power Plants By Florida Counties
Figures are based on February 2024 generation numbers.County | State Rank | Active Plants | Feb 2024 Generation |
---|---|---|---|
Alachua County, FL | # 22 | 11 | 2.6 TWh |
Baker County, FL | # 40 | 2 | 283.1 GWh |
Bay County, FL | # 18 | 7 | 4.9 TWh |
Brevard County, FL | # 14 | 11 | 8.6 TWh |
Broward County, FL | # 7 | 7 | 13.2 TWh |
Calhoun County, FL | # 33 | 5 | 432.5 GWh |
Charlotte County, FL | # 36 | 4 | 323.7 GWh |
Citrus County, FL | # 5 | 3 | 17.4 TWh |
Clay County, FL | # 37 | 3 | 317.0 GWh |
Collier County, FL | # 42 | 3 | 195.5 GWh |
Columbia County, FL | # 39 | 3 | 297.0 GWh |
DeSoto County, FL | # 29 | 11 | 717.7 GWh |
Duval County, FL | # 12 | 22 | 9.6 TWh |
Escambia County, FL | # 21 | 10 | 3.9 TWh |
Gadsden County, FL | # 35 | 2 | 404.5 GWh |
Gilchrist County, FL | # 41 | 3 | 222.5 GWh |
Hamilton County, FL | # 34 | 5 | 425.7 GWh |
Hardee County, FL | # 20 | 7 | 4.6 TWh |
Hendry County, FL | # 28 | 10 | 960.8 GWh |
Hernando County, FL | # 53 | 2 | 13.7 GWh |
Highlands County, FL | # 50 | 6 | 68.6 GWh |
Hillsborough County, FL | # 6 | 31 | 13.3 TWh |
Indian River County, FL | # 30 | 7 | 667.2 GWh |
Jackson County, FL | # 31 | 5 | 497.0 GWh |
Lake County, FL | # 48 | 4 | 109.8 GWh |
Lee County, FL | # 10 | 2 | 10.9 TWh |
Leon County, FL | # 24 | 5 | 1.9 TWh |
Levy County, FL | # 46 | 2 | 142.6 GWh |
County | State Rank | Active Plants | Feb 2024 Generation |
---|---|---|---|
Manatee County, FL | # 16 | 11 | 8.2 TWh |
Marion County, FL | # 54 | 1 | 13.5 GWh |
Martin County, FL | # 15 | 6 | 8.3 TWh |
Miami-Dade County, FL | # 3 | 12 | 22.3 TWh |
Monroe County, FL | # 55 | 4 | 7.3 GWh |
Nassau County, FL | # 27 | 5 | 1.1 TWh |
Okaloosa County, FL | # 49 | 3 | 77.0 GWh |
Okeechobee County, FL | # 8 | 8 | 13.0 TWh |
Orange County, FL | # 11 | 13 | 10.9 TWh |
Osceola County, FL | # 19 | 8 | 4.9 TWh |
Palm Beach County, FL | # 1 | 11 | 30.2 TWh |
Pasco County, FL | # 23 | 7 | 2.5 TWh |
Pinellas County, FL | # 17 | 6 | 7.4 TWh |
Polk County, FL | # 2 | 37 | 25.9 TWh |
Putnam County, FL | # 9 | 9 | 11.7 TWh |
Santa Rosa County, FL | # 25 | 6 | 1.6 TWh |
Sarasota County, FL | # 51 | 1 | 35.7 GWh |
Seminole County, FL | # 52 | 3 | 22.1 GWh |
St. Johns County, FL | # 45 | 1 | 151.4 GWh |
St. Lucie County, FL | # 4 | 13 | 20.6 TWh |
Suwannee County, FL | # 32 | 5 | 433.5 GWh |
Taylor County, FL | # 38 | 3 | 300.3 GWh |
Union County, FL | # 43 | 1 | 161.2 GWh |
Volusia County, FL | # 13 | 11 | 8.6 TWh |
Wakulla County, FL | # 26 | 1 | 1.5 TWh |
Walton County, FL | # 44 | 4 | 160.8 GWh |
Washington County, FL | # 47 | 1 | 122.9 GWh |