Directory of Power Plants in Indiana
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
A B Brown | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 64.4 GWh | Feb 1979 | Mar 2025 | Natural Gas : 99.9% |
AES Petersburg | AES Indiana | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 TWh | May 1967 | Mar 2025 | Bituminous Coal : 99.8% |
Anderson | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 1.0 TWh | May 1992 | Dec 2024 | Natural Gas : 97.7% Distillate Fuel Oil : 2.3% |
Anderson 3 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 16.8 GWh | Nov 2021 | Dec 2024 | Solar |
Anderson 4 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 15.0 GWh | Jul 2021 | Dec 2024 | Solar |
Anderson 5 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 6.0 GWh | Jul 2021 | Dec 2024 | Solar |
Anderson 6 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.3 GWh | May 2022 | Dec 2024 | Solar |
ArcelorMittal Burns Harbor | Cleveland-Cliffs Burns Harbor LLC | Burns Harbor, IN | Midcontinent Independent System Operator, Inc. (MISO) | 922.0 GWh | Dec 1968 | Dec 2024 | Blast Furnace Gas : 42.6% Other Gas : 32.9% Natural Gas : 24.4% |
Auburn Renewables LLC | Auburn Renewables, LLC | Garrett, IN | PJM Interconnection, LLC (PJM) | 9.5 GWh | Aug 2022 | Dec 2024 | Solar |
Bellflower Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Lewisville, IN | PJM Interconnection, LLC (PJM) | 266.3 GWh | Jan 2023 | Mar 2025 | Solar |
Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Oct 2015 | Dec 2024 | Solar |
Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 357.6 GWh | Apr 2008 | Dec 2024 | Wind |
BioTown Ag | Bio Town Biogas, LLC | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 33.3 GWh | May 2011 | Dec 2024 | Other Biomass Gas |
Bitter Ridge Wind Farm, LLC | Bitter Ridge Wind Farm, LLC | Redkey, IN | PJM Interconnection, LLC (PJM) | 378.9 GWh | Aug 2020 | Mar 2025 | Wind |
Bluff Point Wind Facility | Bluff Point Wind, LLC | Portland, IN | PJM Interconnection, LLC (PJM) | 390.9 GWh | Nov 2017 | Mar 2025 | Wind |
Bos Dairy, LLC | Bos Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Dec 2004 | Dec 2024 | Natural Gas |
Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.4 GWh | Oct 2022 | Dec 2024 | Solar |
Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | PJM Interconnection, LLC (PJM) | 10.2 GWh | Nov 1950 | Mar 2025 | Natural Gas |
C&B Graham Energy, LLC | SolRiver Capital LLC | Danville, IN | PJM Interconnection, LLC (PJM) | 13.9 GWh | Jul 2023 | Dec 2024 | Solar |
Camp Atterbury Microgrid Hybrid | Duke Energy Indiana, LLC | Edinburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Oct 2019 | Dec 2024 | Solar |
Caterpillar | Caterpillar Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 27.9 GWh | Nov 1983 | Mar 2025 | Natural Gas |
Cavalry Solar Hybrid | Cavalry Energy Center LLC | Monon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 335.4 GWh | Apr 2024 | Mar 2025 | Solar |
Cayuga | Duke Energy Indiana, LLC | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 TWh | Sep 1970 | Mar 2025 | Bituminous Coal : 99.7% |
CC Perry K | Citizens Thermal Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.9 GWh | Dec 1924 | Jun 2024 | Natural Gas |
Centerville Solar Park | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
Clifty Creek | Indiana-Kentucky Electric Corp | Madison, IN | PJM Interconnection, LLC (PJM) | 5.5 TWh | Jan 1955 | Mar 2025 | Bituminous Coal : 93.4% Subbituminous Coal : 6.5% |
Columbia City Solar Park | Indiana Municipal Power Agency | Columbia City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.6 GWh | Mar 2021 | Dec 2024 | Solar |
Crane Solar Facility | Duke Energy Indiana, LLC | Crane, IN | Midcontinent Independent System Operator, Inc. (MISO) | 28.6 GWh | Dec 2016 | Dec 2024 | Solar |
Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.5 GWh | Nov 2019 | Dec 2024 | Solar |
Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Nov 2019 | Dec 2024 | Solar |
Crawfordsville 5 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 17.7 GWh | Aug 2020 | Dec 2024 | Solar |
Crawfordsville Solar Park 4 | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | May 2020 | Dec 2024 | Solar |
Decatur Co. Solar RES (IN) | Hoosier Energy R E C, Inc | Greensburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 GWh | Aug 2017 | Dec 2024 | Solar |
Deer Creek PV | Indiana Michigan Power Co | Marion, IN | PJM Interconnection, LLC (PJM) | 3.3 GWh | Dec 2015 | Feb 2025 | Solar |
Deercroft I & II LFGTE | Wabash Valley Power Assn, Inc | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 19.2 GWh | Jul 1999 | Dec 2024 | Landfill Gas |
Duke Building 129 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Nov 2014 | Dec 2024 | Solar |
Duke Building 87 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2014 | Dec 2024 | Solar |
Duke Building 98 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Nov 2014 | Dec 2024 | Solar |
Dunns Bridge I Solar | Dunns Bridge Solar Center LLC | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 525.5 GWh | May 2023 | Mar 2025 | Solar |
Dunns Bridge II Solar | Dunns Bridge II Solar and Storage Generation LLC | San Pierre, IN | Midcontinent Independent System Operator, Inc. (MISO) | 133.7 GWh | - | Mar 2025 | Solar |
Eagle Valley (IN) | AES Indiana | Martinsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 TWh | Nov 1951 | Mar 2025 | Natural Gas |
Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 22.5 GWh | Sep 2010 | Dec 2024 | Landfill Gas |
East Chicago | Altus Power America Management, LLC | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Feb 2013 | Dec 2024 | Solar |
Edwardsport | Duke Energy Indiana, LLC | Edwardsport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 TWh | May 2013 | Mar 2025 | Natural Gas : 50.6% Coal-Derived Synthesis Gas : 42.1% Bituminous Coal : 7.3% |
Elkhart | Indiana Michigan Power Co | Elkhart, IN | PJM Interconnection, LLC (PJM) | 13.0 GWh | Dec 1912 | Dec 2024 | Water |
Ellettsville Solar RES | Hoosier Energy R E C, Inc | Ellettsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Sep 2016 | Dec 2024 | Solar |
Evonik Industries AG | Evonik Degussa Corporation | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Apr 1992 | Dec 2023 | Distillate Fuel Oil |
Expander Turbine | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 86.7 GWh | Apr 1981 | Mar 2025 | Blast Furnace Gas |
F B Culley | Southern Indiana Gas & Elec Co | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 TWh | Nov 1966 | Mar 2025 | Bituminous Coal : 96.1% Natural Gas : 3.9% |
Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 443.2 GWh | Dec 2015 | Mar 2025 | Wind |
Fowler Ridge Wind Farm LLC | AE Power Services LLC | Fowler, IN | PJM Interconnection, LLC (PJM) | 1.6 TWh | Jan 2009 | Mar 2025 | Wind |
Gary Works | United States Steel-Gary | Gary, IN | Midcontinent Independent System Operator, Inc. (MISO) | 766.0 GWh | Mar 1997 | Mar 2025 | Blast Furnace Gas : 50.6% Natural Gas : 49.3% |
Gas City 2 | Indiana Municipal Power Agency | Gas City, IN | PJM Interconnection, LLC (PJM) | 3.3 GWh | Dec 2022 | Dec 2024 | Solar |
Gas City Solar Park | Indiana Municipal Power Agency | Gas City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | May 2020 | Dec 2024 | Solar |
Georgetown | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 466.1 GWh | May 2000 | Dec 2024 | Natural Gas |
Gibson | Duke Energy Indiana, LLC | Owensville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.9 TWh | Mar 1975 | Mar 2025 | Bituminous Coal : 99.6% |
Green Cow Power | Green Cow Power LLC | Goshen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.5 GWh | Mar 2015 | Dec 2024 | Other Biomass Gas |
Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
Griffith | Altus Power America Management, LLC | Griffith, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Feb 2013 | Dec 2024 | Solar |
Harding Street | AES Indiana | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 TWh | May 1958 | Mar 2025 | Natural Gas |
Hardy Hills Solar Energy LLC | Hardy Hills Solar LLC | Frankfort, IN | Midcontinent Independent System Operator, Inc. (MISO) | 339.9 GWh | Feb 2024 | Mar 2025 | Solar |
Headwaters Wind Farm II LLC | EDP Renewables North America LLC | Losanville, IN | PJM Interconnection, LLC (PJM) | 570.0 GWh | May 2021 | Mar 2025 | Wind |
Headwaters Wind Farm LLC | Headwaters Wind Farm LLC | Winchester, IN | PJM Interconnection, LLC (PJM) | 622.9 GWh | Nov 2014 | Dec 2023 | Wind |
Heat Recovery Coke Facility | Cokenergy Inc | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 425.8 GWh | Mar 1998 | Mar 2025 | Waste Heat |
Hendricks Regional Health | Hendricks Regional Health | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | Aug 1992 | Mar 2025 | Distillate Fuel Oil |
Henry County | Duke Energy Indiana, LLC | New Castle, IN | Midcontinent Independent System Operator, Inc. (MISO) | 344.7 GWh | Jun 2001 | Dec 2024 | Natural Gas |
Henryville Solar RES | Hoosier Energy R E C, Inc | Underwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2016 | Dec 2024 | Solar |
Herrema Dairy | Herrema Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Mar 2022 | Dec 2024 | Natural Gas |
Hidden View Dairy, LLC | Hidden View Dairy, LLC | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jan 2007 | Dec 2024 | Natural Gas |
Hobart Solar, LLC | AES Distributed Energy | Hobart, IN | Midcontinent Independent System Operator, Inc. (MISO) | 215.0 MWh | Oct 2012 | Nov 2024 | Solar |
Honeysuckle Solar Farm | Lightsource Renewable Energy Asset Management, LLC | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 181.9 GWh | May 2024 | Mar 2025 | Solar |
Hoosier Wind Project LLC | AES Indiana | Goodland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.8 GWh | Oct 2009 | Dec 2023 | Wind |
Hurricane Creek Lift Station | Johnson County Rural E M C | Greenwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 143.0 MWh | Aug 2004 | Dec 2024 | Distillate Fuel Oil |
IMPA Anderson Solar Park | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 7.5 GWh | Dec 2016 | Dec 2024 | Solar |
IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.9 GWh | Nov 2017 | Dec 2024 | Solar |
IMPA Crawfordsville Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Aug 2015 | Dec 2024 | Solar |
IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jun 2014 | Dec 2024 | Solar |
IMPA Huntingburg Solar Park | Indiana Municipal Power Agency | Huntingburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Aug 2016 | Dec 2024 | Solar |
IMPA Knightstown Solar Park | Indiana Municipal Power Agency | Knightstown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Sep 2023 | Dec 2024 | Solar |
IMPA Middletown Solar Park | Indiana Municipal Power Agency | Middletown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Jul 2023 | Dec 2024 | Solar |
IMPA Pendleton Solar Park | Indiana Municipal Power Agency | Pendleton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Sep 2015 | Dec 2024 | Solar |
IMPA Peru Solar Park | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Jul 2015 | Dec 2024 | Solar |
IMPA Rensselaer Solar Park | Indiana Municipal Power Agency | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 985.0 MWh | Apr 2014 | Dec 2024 | Solar |
IMPA Richmond Solar Park | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 578.0 MWh | Aug 2014 | Nov 2024 | Solar |
IMPA Richmond Solar Park 7 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 7.6 GWh | Sep 2023 | Dec 2024 | Solar |
IMPA Tell City Solar Park | Indiana Municipal Power Agency | Tell City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jun 2015 | Dec 2024 | Solar |
IMPA Washington Solar Park | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Aug 2016 | Dec 2024 | Solar |
IMPA Washington Solar Park 2 | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.8 GWh | Jun 2023 | Dec 2024 | Solar |
IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.7 GWh | Oct 2013 | Dec 2024 | Solar |
IND Solar Farm (Phase IIA) | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 GWh | Nov 2014 | Dec 2024 | Solar |
Indiana Crossroads Solar Park | Meadow Lake Solar Park | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 371.7 GWh | May 2023 | Mar 2025 | Solar |
Indiana Crossroads Wind Farm II | Indiana Crossroads Wind Farm II LLC | Wolcott, IN | Midcontinent Independent System Operator, Inc. (MISO) | 305.2 GWh | Nov 2024 | Mar 2025 | Wind |
Indiana Crossroads Wind Farm LLC | Indiana Crossroads Wind Farms LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 952.0 GWh | Nov 2021 | Mar 2025 | Wind |
Indiana Harbor E 5 AC Station | Northlake Energy | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 655.1 GWh | Apr 1996 | Dec 2024 | Blast Furnace Gas : 92.6% Natural Gas : 7.4% |
Indiana Harbor West | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 245.0 GWh | Sep 1939 | Dec 2024 | Natural Gas |
Indianapolis Motor Speedway Solar PV | Boralex US Operations LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.2 GWh | May 2014 | Dec 2023 | Solar |
Indy Grocers | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | May 2015 | Dec 2024 | Solar |
INDY III | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 GWh | Jul 2015 | Dec 2024 | Solar |
Indy Solar I, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.2 GWh | Nov 2013 | Mar 2025 | Solar |
Indy Solar II, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.0 GWh | Nov 2013 | Mar 2025 | Solar |