Directory of Power Plants in Indiana
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
A B Brown | Southern Indiana Gas & Elec Co | Mount Vernon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 905.2 GWh | Feb 1979 | Jun 2024 | Bituminous Coal : 93.9% Natural Gas : 6.1% |
AES Petersburg | Indianapolis Power & Light Co | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 TWh | May 1967 | Jun 2024 | Bituminous Coal : 99.8% |
Anderson | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 51.6 GWh | May 1992 | Dec 2023 | Natural Gas : 99.6% |
Anderson 3 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 17.1 GWh | Nov 2021 | Dec 2023 | Solar |
Anderson 4 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 15.4 GWh | Jul 2021 | Dec 2023 | Solar |
Anderson 5 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 6.2 GWh | Jul 2021 | Dec 2023 | Solar |
Anderson 6 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 13.7 GWh | May 2022 | Dec 2023 | Solar |
ArcelorMittal Burns Harbor | Cleveland-Cliffs Burns Harbor LLC | Burns Harbor, IN | Midcontinent Independent System Operator, Inc. (MISO) | 912.0 GWh | Dec 1968 | Dec 2023 | Blast Furnace Gas : 35.2% Other Gas : 35.2% Natural Gas : 29.6% |
Auburn Renewables LLC | Auburn Renewables, LLC | Garrett, IN | PJM Interconnection, LLC (PJM) | 16.4 GWh | Aug 2022 | Dec 2023 | Solar |
Bellflower Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Lewisville, IN | PJM Interconnection, LLC (PJM) | 286.9 GWh | Jan 2023 | Jun 2024 | Solar |
Belmont | Marion Solar LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Oct 2015 | Dec 2023 | Solar |
Benton County Wind Farm | Orion Energy Group LLC | Earl Park, IN | Midcontinent Independent System Operator, Inc. (MISO) | 406.8 GWh | Apr 2008 | Dec 2022 | Wind |
BioTown Ag | Bio Town Biogas, LLC | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 32.7 GWh | May 2011 | Dec 2023 | Other Biomass Gas |
Bitter Ridge Wind Farm, LLC | Bitter Ridge Wind Farm, LLC | Redkey, IN | PJM Interconnection, LLC (PJM) | 379.9 GWh | Aug 2020 | Jun 2024 | Wind |
Bluff Point Wind Facility | Bluff Point Wind, LLC | Portland, IN | PJM Interconnection, LLC (PJM) | 380.5 GWh | Nov 2017 | Jun 2024 | Wind |
Bos Dairy, LLC | Bos Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.5 GWh | Dec 2004 | Dec 2023 | Natural Gas |
Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.8 GWh | Oct 2022 | Dec 2023 | Solar |
Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | PJM Interconnection, LLC (PJM) | 9.9 GWh | Nov 1950 | Jun 2024 | Natural Gas |
C&B Graham Energy, LLC | SolRiver Capital LLC | Danville, IN | PJM Interconnection, LLC (PJM) | 4.3 GWh | Jul 2023 | Dec 2023 | Solar |
Camp Atterbury Microgrid Hybrid | Duke Energy Indiana, LLC | Edinburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 692.6 MWh | Oct 2019 | Dec 2023 | Solar |
Caterpillar | Caterpillar Inc | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 23.3 GWh | Nov 1983 | Jun 2024 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
Cavalry Solar Hybrid | Cavalry Energy Center LLC | Monon, IN | Midcontinent Independent System Operator, Inc. (MISO) | 79.8 GWh | - | Jun 2024 | Solar |
Cayuga | Duke Energy Indiana, LLC | Cayuga, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 TWh | Sep 1970 | Jun 2024 | Bituminous Coal : 99.4% |
CC Perry K | Citizens Thermal Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.8 GWh | Dec 1924 | Jun 2024 | Natural Gas |
Centerville Solar Park | Indiana Municipal Power Agency | Centerville, IN | PJM Interconnection, LLC (PJM) | 2.1 GWh | Sep 2020 | Dec 2023 | Solar |
Clifty Creek | Indiana-Kentucky Electric Corp | Madison, IN | PJM Interconnection, LLC (PJM) | 5.4 TWh | Jan 1955 | Jun 2024 | Bituminous Coal : 92.4% Subbituminous Coal : 7.5% |
Columbia City Solar Park | Indiana Municipal Power Agency | Columbia City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | Mar 2021 | Dec 2023 | Solar |
Crane Solar Facility | Duke Energy Indiana, LLC | Crane, IN | Midcontinent Independent System Operator, Inc. (MISO) | 29.8 GWh | Dec 2016 | Dec 2023 | Solar |
Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.8 GWh | Nov 2019 | Dec 2022 | Solar |
Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Nov 2019 | Dec 2023 | Solar |
Crawfordsville 5 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 GWh | Aug 2020 | Dec 2023 | Solar |
Crawfordsville Solar Park 4 | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | May 2020 | Dec 2023 | Solar |
Decatur Co. Solar RES (IN) | Hoosier Energy R E C, Inc | Greensburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2017 | Dec 2023 | Solar |
Deer Creek PV | Indiana Michigan Power Co | Marion, IN | PJM Interconnection, LLC (PJM) | 3.8 GWh | Dec 2015 | Jun 2024 | Solar |
Deercroft I & II LFGTE | Wabash Valley Power Assn, Inc | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 GWh | Jul 1999 | Dec 2023 | Landfill Gas |
Duke Building 129 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 GWh | Nov 2014 | Dec 2023 | Solar |
Duke Building 87 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2014 | Dec 2023 | Solar |
Duke Building 98 | Concord New Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Nov 2014 | Dec 2023 | Solar |
Dunn's Bridge 1 Solar | Dunns Bridge Solar Center LLC | Wheatfield, IN | Midcontinent Independent System Operator, Inc. (MISO) | 545.3 GWh | May 2023 | Jun 2024 | Solar |
Eagle Valley (IN) | Indianapolis Power & Light Co | Martinsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 TWh | Nov 1951 | Jun 2024 | Natural Gas |
Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 27.1 GWh | Sep 2010 | Dec 2023 | Landfill Gas |
East Chicago | Altus Power America Management, LLC | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Feb 2013 | Nov 2023 | Solar |
Edwardsport | Duke Energy Indiana, LLC | Edwardsport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 TWh | May 2013 | Jun 2024 | Coal-Derived Synthesis Gas : 55.5% Natural Gas : 34.8% Bituminous Coal : 9.7% |
Elkhart | Indiana Michigan Power Co | Elkhart, IN | PJM Interconnection, LLC (PJM) | 12.2 GWh | Dec 1912 | Dec 2023 | Water |
Ellettsville Solar RES | Hoosier Energy R E C, Inc | Ellettsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Sep 2016 | Dec 2023 | Solar |
Evonik Industries AG | Evonik Degussa Corporation | Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.0 MWh | Apr 1992 | Dec 2023 | Distillate Fuel Oil |
Expander Turbine | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 47.5 GWh | Apr 1981 | Jun 2024 | Blast Furnace Gas |
F B Culley | Southern Indiana Gas & Elec Co | Newburgh, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 TWh | Nov 1966 | Jun 2024 | Bituminous Coal : 97.7% Natural Gas : 2.3% |
Fowler Ridge IV Wind Farm LLC | Pattern Operators LP | Fowler, IN | PJM Interconnection, LLC (PJM) | 425.1 GWh | Dec 2015 | Jun 2024 | Wind |
Fowler Ridge Wind Farm LLC | AE Power Services LLC | Fowler, IN | PJM Interconnection, LLC (PJM) | 1.4 TWh | Jan 2009 | Jun 2024 | Wind |
Gary Works | United States Steel-Gary | Gary, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 TWh | Mar 1997 | Jun 2024 | Blast Furnace Gas : 50.6% Natural Gas : 49.4% |
Gas City 2 | Indiana Municipal Power Agency | Gas City, IN | PJM Interconnection, LLC (PJM) | 3.4 GWh | Dec 2022 | Dec 2023 | Solar |
Gas City Solar Park | Indiana Municipal Power Agency | Gas City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | May 2020 | Dec 2023 | Solar |
Georgetown | Indianapolis Power & Light Co | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 256.4 GWh | May 2000 | Dec 2023 | Natural Gas |
Gibson | Duke Energy Indiana, LLC | Owensville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 TWh | Mar 1975 | Jun 2024 | Bituminous Coal : 99.7% |
Green Cow Power | Green Cow Power LLC | Goshen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.2 GWh | Mar 2015 | Dec 2022 | Other Biomass Gas |
Greenfield Solar Park | Indiana Municipal Power Agency | Greenfield, IN | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2017 | Dec 2023 | Solar |
Griffith | Altus Power America Management, LLC | Griffith, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Feb 2013 | Dec 2023 | Solar |
Harding Street | Indianapolis Power & Light Co | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 TWh | May 1958 | Jun 2024 | Natural Gas : 99.9% |
Headwaters Wind Farm II LLC | EDP Renewables North America LLC | Losanville, IN | PJM Interconnection, LLC (PJM) | 568.6 GWh | May 2021 | Jun 2024 | Wind |
Headwaters Wind Farm LLC | Headwaters Wind Farm LLC | Winchester, IN | PJM Interconnection, LLC (PJM) | 744.9 GWh | Nov 2014 | Dec 2022 | Wind |
Heat Recovery Coke Facility | Cokenergy Inc | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 498.3 GWh | Mar 1998 | Jun 2024 | Waste Heat |
Hendricks Regional Health | Hendricks Regional Health | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 27.0 MWh | Aug 1992 | Jun 2024 | Distillate Fuel Oil |
Henry County | Duke Energy Indiana, LLC | New Castle, IN | Midcontinent Independent System Operator, Inc. (MISO) | 264.8 GWh | Jun 2001 | Dec 2023 | Natural Gas |
Henryville Solar RES | Hoosier Energy R E C, Inc | Underwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2016 | Dec 2023 | Solar |
Herrema Dairy | Herrema Dairy, LLC | Fair Oaks, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Mar 2022 | Dec 2023 | Natural Gas |
Hidden View Dairy, LLC | Hidden View Dairy, LLC | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Jan 2007 | Dec 2023 | Natural Gas : 99.2% Other Biomass Gas : 0.8% |
Hobart Solar, LLC | AES Distributed Energy | Hobart, IN | Midcontinent Independent System Operator, Inc. (MISO) | 731.5 MWh | Oct 2012 | Dec 2023 | Solar |
Honeysuckle Solar Farm | Lightsource Renewable Energy Asset Management, LLC | New Carlisle, IN | PJM Interconnection, LLC (PJM) | 16.8 GWh | - | Jun 2024 | Solar |
Hoosier Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Goodland, IN | Midcontinent Independent System Operator, Inc. (MISO) | 288.4 GWh | Oct 2009 | Dec 2022 | Wind |
Hurricane Creek Lift Station | Johnson County Rural E M C | Greenwood, IN | Midcontinent Independent System Operator, Inc. (MISO) | 143.7 MWh | Aug 2004 | Dec 2023 | Distillate Fuel Oil |
IMPA Anderson Solar Park | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 3.8 GWh | Dec 2016 | Dec 2023 | Solar |
IMPA Anderson Solar Park 2 | Indiana Municipal Power Agency | Anderson, IN | PJM Interconnection, LLC (PJM) | 14.4 GWh | Nov 2017 | Dec 2023 | Solar |
IMPA Crawfordsville Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Aug 2015 | Dec 2023 | Solar |
IMPA Frankton Solar Park | Indiana Municipal Power Agency | Frankton, IN | PJM Interconnection, LLC (PJM) | 1.2 GWh | Jun 2014 | Dec 2023 | Solar |
IMPA Huntingburg Solar Park | Indiana Municipal Power Agency | Huntingburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Aug 2016 | Dec 2023 | Solar |
IMPA Knightstown Solar Park | Indiana Municipal Power Agency | Knightstown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 207.0 MWh | Sep 2023 | Dec 2023 | Solar |
IMPA Middletown Solar Park | Indiana Municipal Power Agency | Middletown, IN | Midcontinent Independent System Operator, Inc. (MISO) | 663.0 MWh | Jul 2023 | Dec 2023 | Solar |
IMPA Pendleton Solar Park | Indiana Municipal Power Agency | Pendleton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Sep 2015 | Dec 2023 | Solar |
IMPA Peru Solar Park | Indiana Municipal Power Agency | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jul 2015 | Dec 2023 | Solar |
IMPA Rensselaer Solar Park | Indiana Municipal Power Agency | Rensselaer, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Apr 2014 | Aug 2023 | Solar |
IMPA Richmond Solar Park | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 814.6 MWh | Aug 2014 | Dec 2023 | Solar |
IMPA Richmond Solar Park 7 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 986.0 MWh | Sep 2023 | Dec 2023 | Solar |
IMPA Tell City Solar Park | Indiana Municipal Power Agency | Tell City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jun 2015 | Dec 2023 | Solar |
IMPA Washington Solar Park | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Aug 2016 | Dec 2023 | Solar |
IMPA Washington Solar Park 2 | Indiana Municipal Power Agency | Washington, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Jun 2023 | Dec 2023 | Solar |
IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 15.4 GWh | Oct 2013 | Dec 2022 | Solar |
IND Solar Farm (Phase IIA) | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 11.2 GWh | Nov 2014 | Dec 2023 | Solar |
Indiana Crossroads Solar Park | Meadow Lake Solar Park | Reynolds, IN | Midcontinent Independent System Operator, Inc. (MISO) | 399.3 GWh | May 2023 | Jun 2024 | Solar |
Indiana Crossroads Wind Farm LLC | Indiana Crossroads Wind Farms LLC | Chalmers, IN | Midcontinent Independent System Operator, Inc. (MISO) | 925.0 GWh | Nov 2021 | Jun 2024 | Wind |
Indiana Harbor E 5 AC Station | Northlake Energy | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 702.8 GWh | Apr 1996 | Dec 2023 | Blast Furnace Gas : 93.0% Natural Gas : 7.0% |
Indiana Harbor West | Cleveland Cliffs | East Chicago, IN | Midcontinent Independent System Operator, Inc. (MISO) | 155.2 GWh | Sep 1939 | Dec 2022 | Natural Gas : 81.7% Blast Furnace Gas : 18.3% |
Indianapolis Motor Speedway Solar PV | Blue Renewable Energy IMS, LLC | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 12.6 GWh | May 2014 | Dec 2023 | Solar |
Indy Grocers | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | May 2015 | Dec 2023 | Solar |
INDY III | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Jul 2015 | Dec 2023 | Solar |
Indy Solar I, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 16.5 GWh | Nov 2013 | Jun 2024 | Solar |
Indy Solar II, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 16.8 GWh | Nov 2013 | Jun 2024 | Solar |
Indy Solar III, LLC | Onward Energy | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 14.2 GWh | Nov 2013 | Jun 2024 | Solar |
Jackson Co. Solar RES | Hoosier Energy R E C, Inc | Columbus, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2017 | Dec 2023 | Solar |
Jay County LFGTE | Wabash Valley Power Assn, Inc | Portland, IN | PJM Interconnection, LLC (PJM) | 18.1 GWh | Mar 2005 | Dec 2023 | Landfill Gas |
Browse Power Plants By Indiana Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Marion County, IN | # 12 | 24 | 3.9 TWh |
Marshall County, IN | # 33 | 2 | 66.6 GWh |
Martin County, IN | # 39 | 2 | 29.8 GWh |
Miami County, IN | # 40 | 4 | 28.2 GWh |
Monroe County, IN | # 60 | 1 | 1.7 GWh |
Montgomery County, IN | # 35 | 6 | 47.3 GWh |
Morgan County, IN | # 6 | 1 | 5.8 TWh |
Perry County, IN | # 50 | 2 | 6.9 GWh |
Pike County, IN | # 11 | 5 | 3.9 TWh |
Porter County, IN | # 23 | 5 | 1.2 TWh |
Posey County, IN | # 20 | 4 | 1.5 TWh |
Randolph County, IN | # 18 | 7 | 1.7 TWh |
Scott County, IN | # 46 | 1 | 12.7 GWh |
Shelby County, IN | # 38 | 2 | 33.0 GWh |
Spencer County, IN | # 9 | 3 | 4.5 TWh |
St. Joseph County, IN | # 5 | 12 | 6.4 TWh |
Sullivan County, IN | # 10 | 3 | 4.0 TWh |
Switzerland County, IN | # 28 | 1 | 312.9 GWh |
Tippecanoe County, IN | # 25 | 8 | 749.0 GWh |
Tipton County, IN | # 26 | 3 | 733.0 GWh |
Vanderburgh County, IN | # 53 | 4 | 5.8 GWh |
Vermillion County, IN | # 7 | 3 | 5.5 TWh |
Vigo County, IN | # 13 | 4 | 3.7 TWh |
Wabash County, IN | # 42 | 3 | 21.9 GWh |
Warren County, IN | # 22 | 1 | 1.3 TWh |
Warrick County, IN | # 4 | 2 | 6.4 TWh |
Wayne County, IN | # 31 | 11 | 95.7 GWh |
Wells County, IN | # 29 | 2 | 147.9 GWh |
White County, IN | # 14 | 15 | 3.3 TWh |
Whitley County, IN | # 49 | 2 | 7.4 GWh |