Antelope Big Sky Ranch
8765U West Avenue J, Lancaster, CA 93536Plant Summary Information
Antelope Big Sky Ranch is ranked #153 out of 834 solar farms in California in terms of total annual net electricity generation.
Antelope Big Sky Ranch generated 9.5 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Antelope Big Sky Ranch |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Los Angeles County, CA |
| Initial Operation Date | August 2016 |
| Last Update | Dec 2024 |
| Annual Generation | 54.0 GWh |
| Annual Consumption | 191.9 k MMBtu |
| Ranked #4,052 out of 12,332 Power Plants Nationwide | |
| Ranked #1,030 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #442 out of 1,530 California Power Plants | |
| Ranked #153 out of 834 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Sustainable Power Group, LLC (2015 to 2020) AES Distributed Energy (2021 to 2024) |
Map of Antelope Big Sky Ranch
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Antelope Big Sky Ranch.
Monthly Net Generation for Antelope Big Sky Ranch
Monthly Plant Fuel Consumption for Antelope Big Sky Ranch
Antelope Big Sky Ranch Details
| Summary Information | |
|---|---|
| Plant Name | Antelope Big Sky Ranch (60279) |
| Plant Address | 8765U West Avenue J, Lancaster, CA 93536 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 34.69484, -118.28769 |
| Generation Dates on File | Aug 2016 to Dec 2024 |
| Initial Operation Date | August 2016 |
| Annual Generation | 54.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | No |
Generator ABSR Details Operating August 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 19 MW |
| Winter Capacity | 19 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 26 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Antelope Big Sky Ranch Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1020 | Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh |
| #1021 | Fort Benning Solar Facility | Fort Mitchell, AL | 55.6 GWh |
| #1022 | Apache Solar I | Cochise, AZ | 55.5 GWh |
| #1023 | Muskegon Solar | Muskegon, MI | 55.2 GWh |
| #1024 | Citizens Imperial Solar | Calipatria, CA | 55.2 GWh |
| #1025 | Ho'Ohana Solar 1 | Waipahu, HI | 52.1 GWh |
| #1026 | Caden Energix Endless Caverns, LLC | New Market, VA | 54.9 GWh |
| #1027 | Flatford | Myakka City, FL | 54.5 GWh |
| #1028 | Oberon IB | Odessa, TX | 54.4 GWh |
| #1029 | Seville 1 | Ocotillo Wells, CA | 54.1 GWh |
| #1031 | Barilla Solar | Fort Stockton, TX | 53.7 GWh |
| #1032 | SEPV Mojave West | Mojave, CA | 53.5 GWh |
| #1033 | Techren Solar IV LLC | Boulder, NV | 53.5 GWh |
| #1034 | Techren Solar III LLC | Boulder, NV | 53.3 GWh |
| #1035 | Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh |
| #1036 | Long Point Solar | Damon, TX | 53.1 GWh |
| #1037 | Innovative Solar 31 | Bladenboro, NC | 52.9 GWh |
| #1038 | Catalina Solar 2, LLC | Rosamond, CA | 52.8 GWh |
| #1039 | P66 Rodeo Solar | Rodeo, CA | 52.7 GWh |
| #1040 | Gaskell West 1 Solar Facility | Lancaster, CA | 52.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Antelope Big Sky Ranch.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope DSR 2 | Lancaster, CA | 12.0 GWh | 1.5 mi |
| Bayshore Solar A, LLC | Lancaster, CA | 46.4 GWh | 2 mi |
| Bayshore Solar B, LLC | Lancaster, CA | 45.4 GWh | 1.4 mi |
| Bayshore Solar C, LLC | Lancaster, CA | 41.3 GWh | 1.8 mi |
| Central Antelope Dry Ranch B LLC | Lancaster, CA | 6.7 GWh | 1.1 mi |
| Central Antelope Dry Ranch C | Lancaster, CA | 33.3 GWh | 1.9 mi |
| Horn | Lancaster, CA | 3.2 GWh | 1.2 mi |
| Lancaster Dry Farm Ranch B | Lancaster, CA | 7.8 GWh | 1.5 mi |
| Portal Ridge Solar B, LLC | Lancaster, CA | 46.9 GWh | 1.5 mi |
| Portal Ridge Solar C, LLC | Lancaster, CA | 25.3 GWh | 1.5 mi |
| Rodeo Solar C2 | Lancaster, CA | 2.9 GWh | 1.3 mi |
| Rodeo Solar D2 | Lancaster, CA | 2.6 GWh | 1.3 mi |
| Summer North Solar | Lancaster, CA | 10.0 GWh | 2 mi |
| Summer Solar A2 | Lancaster, CA | 3.2 GWh | 2 mi |
| Summer Solar B2 | Lancaster, CA | 3.0 GWh | 2 mi |
| Summer Solar C2 | Lancaster, CA | 2.5 GWh | 2 mi |
| Summer Solar D2 | Lancaster, CA | 1.8 GWh | 2 mi |
| Summer Solar LLC | Lancaster, CA | 49.1 GWh | 1.9 mi |
| TA-High Desert LLC | Lancaster, CA | 56.8 GWh | 1.4 mi |
| Western Antelope Dry Ranch | Lancaster, CA | 21.8 GWh | 1.9 mi |