Target Woodland Solar Project

2050 E Beamer Street, Woodland, CA 95776

Plant Summary Information

Target Woodland Solar Project is ranked #619 out of 885 solar farms in California in terms of total annual net electricity generation.

Target Woodland Solar Project generated 368.0 MWh during the 3-month period between September 2025 to December 2025.

Plant NameTarget Woodland Solar Project
Utility NameMN8 Energy LLC
LocationYolo County, CA
Initial Operation DateDecember 2018
Last Update Dec 2025
Annual Generation 2.8 GWh
Annual Consumption 10.0 k MMBtu
Ranked #10,029 out of 13,081 Power Plants Nationwide
Ranked #5,018 out of 7,015 Solar Power Plants Nationwide
Ranked #1,279 out of 1,606 California Power Plants
Ranked #619 out of 885 California Solar Power Plants
Fuel Types Solar
Previous Operators Good Fellow Solar 1 PH1, LLC (2018 to 2019)
Goldman Sachs Renewable Power Group (2020 to 2020)
Goldman Sachs Renewable Power LLC (2021 to 2021)
MN8 Energy LLC (2022 to 2025)

Map of Target Woodland Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Target Woodland Solar Project.

Create Your Account Today

Monthly Net Generation for Target Woodland Solar Project

Monthly Plant Fuel Consumption for Target Woodland Solar Project

Target Woodland Solar Project Details

Summary Information
Plant NameTarget Woodland Solar Project (62246)
Plant Address2050 E Beamer Street, Woodland, CA 95776
UtilityMN8 Energy LLC (61944)
Latitude, Longitude38.68275, -121.72345
Generation Dates on FileDec 2018 to Dec 2025
Initial Operation DateDecember 2018
Annual Generation 2.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number19-578
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator TWSP Details Operating December 2018

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity2.3 MW
Summer Capacity1.8 MW
Winter Capacity2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2018
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle181
Tilt Angle10
DC Net Capacity2.5 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.5 MW
Virtual Net Metering AgreementNo

Target Woodland Solar Project Plant Owners

Owner NameAddressOwnership
SunTrust Equipment Finance & Leasing Corp245 Peachtree Center Avenue, 17th Floor, Atlanta, GA 30303100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5008Atascadero State HospitalAtascadero, CA2.8 GWh
#5009Dunn Road SolarSandy, OR2.8 GWh
#5010San Diego - NCRC at VistaVista, CA2.8 GWh
#5011Chambers 3 - Erie County AldenAlden, NY2.8 GWh
#5012Medford DPC SolarMedford, WI2.8 GWh
#5013River Valley SolarWoodburn, OR2.8 GWh
#5014Grossmont-Cuyamaca-Cuyamaca Col. Solar &El Cajon, CA2.8 GWh
#5015SCCCD - Fresno Community CollegeFresno, CA2.8 GWh
#5016Dignity - Siena CampusHenderson, NV2.8 GWh
#5017Curtis Hill Solar CSGCharlton, MA2.8 GWh
#5019DPC YorkThomson, IL2.8 GWh
#5020Caelum Community SolarFoley, MN2.8 GWh
#5021Rappahannock Solar, LLCWhite Stone, VA2.8 GWh
#5022SCH County - (2D) 98 Cheltingham Ave SchSchenectady, NY2.8 GWh
#5023New Beginnings SolarKingston, NY2.8 GWh
#5024Atkinson Solar IIBeulaville, NC2.8 GWh
#5025KDC Solar CV Cedar Lane Park LLCWest Friendship, MD2.8 GWh
#5026Otarre Solar ParkCayce, SC2.8 GWh
#5027ME CDG 005Veazie, ME2.8 GWh
#5028Vallecitos Water DistrictSan Marcos, CA2.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Target Woodland Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
CA- US Foods- Sacramento (McClellan)McClellan, CA1.4 GWh17 mi
Campbell Power PlantSacramento, CA504.9 GWh18 mi
Chambers 4 - Sacramento SMF1Sacramento, CA2.3 GWh8 mi
CSU Sacramento ISacramento, CA2.1 GWh18.6 mi
Department of JusticeSacramento, CA3.5 GWh17.5 mi
Foundation Cemex MadisonMadison, CA1.5 GWh11.3 mi
McClellan (CA)Sacramento, CA1.2 GWh17.9 mi
MM Yolo PowerWoodland, CA16.2 GWh6.3 mi
Sacramento (SMUD)Sacramento, CA2.3 GWh15.8 mi
Sacramento Point West Medical OfficesSacramento, CA2.2 GWh17 mi
SCDA Solar 1Sacramento, CA14.2 GWh7.4 mi
Solar Star California II LLCSacramento, CA3.8 GWh17.7 mi
Strata Roof 1Sacramento, CA1.4 GWh12.1 mi
UC Davis South CampusDavis, CA11.9 GWh9.3 mi
US GSA - SacramentoSacramento, CA1.5 GWh18.4 mi
Walgreens Woodland Distribution CenterWoodland, CA432.0 MWh0.8 mi
West Village Solar - Array 1Community SoDavis, CA746.0 MWh10.1 mi
West Village Solar - Array 2 Community SDavis, CA619.0 MWh10.1 mi
Wildflower Solar 1Elverta, CA28.1 GWh13.4 mi
Woodland Biomass Power LtdWoodland, CA161.9 GWh0.9 mi