Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 336.8 GWh | Jun 2016 | Feb 2026 | Solar |
| Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.8 GWh | Mar 2016 | Dec 2024 | Solar |
| CED Avenal | Consolidated Edison Development Inc. | Avenal, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2016 | Dec 2024 | Solar |
| Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2015 | Dec 2024 | Solar |
| SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 308.9 GWh | Jan 2019 | Feb 2026 | Solar |
| Sun Streams, LLC | EDP Renewables North America LLC | Arlington, AZ | California Independent System Operator (CISO) | 409.9 GWh | Dec 2019 | Feb 2026 | Solar |
| Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 12.7 GWh | Sep 2015 | Dec 2024 | Solar |
| CED Ducor 1 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 51.9 GWh | Nov 2016 | Dec 2024 | Solar |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2016 | Dec 2024 | Solar |
| CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 263.0 GWh | Oct 2017 | Feb 2026 | Solar |
| Frontier Solar LLC | Boralex US Operations LLC | Newman, CA | California Independent System Operator (CISO) | 38.6 GWh | May 2016 | Dec 2024 | Solar |
| CED Ducor 3 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 39.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
| CED Ducor 4 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 356.4 GWh | Oct 2020 | Feb 2026 | Solar |
| Blythe Solar 110, LLC | Blythe Solar 110, LLC | Blythe, CA | California Independent System Operator (CISO) | 580.5 GWh | Feb 2016 | Dec 2024 | Solar |
| Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 247.4 GWh | Nov 2015 | Dec 2024 | Wind |
| PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2017 | Dec 2024 | Solar |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.7 GWh | Sep 2015 | Dec 2024 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 64.5 GWh | Oct 2017 | Feb 2026 | Solar |
| Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 357.8 GWh | Apr 2020 | Feb 2026 | Solar |
| AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 2016 | Dec 2024 | Solar |
| American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 315.1 GWh | Nov 2020 | Feb 2026 | Solar |
| Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 651.0 MWh | Feb 2012 | Dec 2024 | Solar |
| Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2007 | Dec 2024 | Natural Gas |
| North Palm Springs 1A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 5.2 GWh | Mar 2012 | Dec 2024 | Solar |
| C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 42.9 GWh | Sep 1957 | Feb 2026 | Purchased Steam |
| SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 24.3 GWh | May 2013 | Dec 2024 | Solar |
| Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 263.0 GWh | Jan 2012 | Dec 2024 | Wind |
| Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2024 | Solar |
| West Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 19.2 GWh | Apr 2013 | Dec 2024 | Solar |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 2011 | Dec 2024 | Natural Gas |
| Tahquitz High School | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2012 | Dec 2024 | Solar |
| Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 311.2 GWh | Jul 2012 | Dec 2024 | Wind |
| J.R. Simplot Company | J.R. Simplot Company | Lathrop, CA | California Independent System Operator (CISO) | 8.9 GWh | Sep 1993 | Dec 2023 | Waste Heat |
| Wagner Wind LLC | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 15.5 GWh | Nov 2012 | Dec 2024 | Wind |
| Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2012 | Dec 2024 | Solar |
| West Valley High School Solar | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2012 | Dec 2024 | Solar |
| Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Jun 2024 | Solar |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 373.0 MWh | Nov 2011 | Dec 2024 | Wind |
| Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2011 | Dec 2024 | Wind |
| Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.8 GWh | Jan 2013 | Dec 2024 | Landfill Gas |
| Hoag Hospital Cogen Plant | Hoag Memorial Presbyterian Hospital | Newport Beach, CA | California Independent System Operator (CISO) | 27.1 GWh | Jun 2006 | Feb 2026 | Natural Gas |
| Newberry Solar 1 LLC | Newberry Solar 1 LLC | Newberry Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2013 | Dec 2023 | Solar |
| Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 22.0 GWh | Aug 2012 | Dec 2024 | Solar |
| SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.7 GWh | May 2013 | Dec 2024 | Solar |
| SEPV 1 | CVI CleanCapital Solar 1 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2012 | Dec 2024 | Solar |
| Tule Wind LLC | Avangrid Power LLC | Boulevard, CA | California Independent System Operator (CISO) | 348.4 GWh | Nov 2017 | Feb 2026 | Wind |
| Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation Cemex Madison | Foundation CA Fund V Manager, LLC | Madison, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2012 | Dec 2024 | Wind |
| Foundation Wal-Mart Red Bluff | Foundation CA Fund VI Manager LLC | Red Bluff, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2012 | Feb 2026 | Wind |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 902.0 MWh | Nov 2012 | Feb 2026 | Wind |
| Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2012 | Dec 2024 | Wind |
| Kern Oil & Refining Co | Kern Oil & Refining Co | Bakersfield, CA | California Independent System Operator (CISO) | 35.5 GWh | Sep 2002 | Feb 2026 | Natural Gas |
| Desert Green Solar Farm LLC | Invenergy Services LLC | Boulevard, CA | California Independent System Operator (CISO) | 10.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Brookfield Tehachapi 1 | Coram California Development, L.P. | Mojave, CA | California Independent System Operator (CISO) | 276.9 GWh | Feb 2012 | Dec 2024 | Wind |
| Edwards Air Force Base | CleanCapital Holdings | Edwards, CA | California Independent System Operator (CISO) | 866.0 MWh | Nov 2011 | Dec 2023 | Solar |
| SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2012 | Dec 2024 | Solar |
| Butte College Main Campus Solar | Butte-Glenn Community College District | Oroville, CA | California Independent System Operator (CISO) | 6.3 GWh | Jun 2011 | Dec 2024 | Solar |
| SF Southeast Cogen Plant | City & County of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 3.9 GWh | May 2002 | Dec 2024 | Other Biomass Gas |
| Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 18.1 GWh | Nov 2012 | Dec 2024 | Wind |
| High Sierra Cogeneration Plant | Plumas Sierra Rural Electric Coop | Susanville, CA | California Independent System Operator (CISO) | 36.7 GWh | Jan 2010 | Dec 2024 | Natural Gas |
| Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 408.5 GWh | Oct 2012 | Feb 2026 | Natural Gas |
| Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2010 | Dec 2024 | Solar |
| Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.5 GWh | Oct 2004 | Dec 2024 | Landfill Gas |
| Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 666.9 GWh | Oct 2013 | Dec 2024 | Solar |
| Irwindale Brew Yard, LLC | Irwindale Brew Yard, LLC | Irwindale, CA | California Independent System Operator (CISO) | 517.0 MWh | Jan 2002 | Apr 2025 | Solar : 99.8% |
| Alpaugh North | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 31.4 GWh | Nov 2012 | Dec 2024 | Solar |
| Alpaugh 50 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 84.7 GWh | Nov 2012 | Dec 2024 | Solar |
| Brea Expansion Plant | Brea Power II | Brea, CA | California Independent System Operator (CISO) | 234.8 GWh | Oct 2012 | Feb 2026 | Landfill Gas |
| Axium Modesto Solar | Axium US Solar Holdings LLC | Modesto, CA | California Independent System Operator (CISO) | 47.4 GWh | Nov 2012 | Dec 2024 | Solar |
| Copper Mountain Solar 2 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 356.1 GWh | Jun 2012 | Dec 2024 | Solar |
| Nickel 1 Solar Facility | Altus Power America Management, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2012 | Dec 2024 | Solar |
| IKEA Tejon 345 | IKEA Property Inc | Lebec, CA | California Independent System Operator (CISO) | 929.0 MWh | Mar 2011 | Oct 2024 | Solar |
| North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 435.0 GWh | Nov 2012 | Dec 2024 | Wind |
| Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 66.2 GWh | Dec 1995 | Feb 2026 | Natural Gas |
| Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.4 GWh | Oct 2011 | Dec 2024 | Solar |
| Heliocentric | Heliocentric LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2012 | Dec 2024 | Solar |
| Mustang Hills LLC | Mustang Hills, LLC (Longroad) | Mojave, CA | California Independent System Operator (CISO) | 301.5 GWh | Apr 2012 | Dec 2024 | Wind |
| Pinyon Pine I | Pinyon Pines Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 306.6 GWh | Oct 2012 | Dec 2024 | Wind |
| Alta Wind VIII | Nextera Energy Resources | Mojave, CA | California Independent System Operator (CISO) | 222.0 GWh | Dec 2011 | Dec 2024 | Wind |
| L-8 Solar Project | L-8 Solar Project LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Apr 2012 | Dec 2024 | Solar |
| Pinyon Pine II | Pinyon Pines Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 233.1 GWh | Oct 2012 | Dec 2024 | Wind |
| ISH Solar Hospital SDMC | SunEdison LLC | San Diego, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2011 | Dec 2024 | Solar |
| ISH Solar Hospital Downey | SunEdison LLC | Downey, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2011 | Dec 2024 | Solar |
| CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 36.5 GWh | Sep 2010 | Feb 2026 | Natural Gas : 82.3% Solar : 17.7% |
| Westside Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 13.9 GWh | Jul 2011 | Dec 2024 | Solar |
| Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2008 | Dec 2024 | Solar |
| Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2012 | Dec 2024 | Solar |
| RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 44.7 GWh | Nov 2013 | Dec 2024 | Solar |
| Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2010 | Dec 2024 | Solar |
| TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 56.8 GWh | Feb 2013 | Dec 2024 | Solar |
| RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 49.2 GWh | May 2013 | Dec 2024 | Solar |
| Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 4.6 GWh | Oct 2009 | Dec 2024 | Landfill Gas |
| Kaiser Ontario | Bloom Energy 2009 PPA | Ontario, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2012 | Dec 2024 | Natural Gas |
| Guernsey Solar Station | Pacific Gas & Electric Co. | Hanford, CA | California Independent System Operator (CISO) | 22.7 GWh | Jul 2013 | Dec 2024 | Solar |
| Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2013 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |