Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 45.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.2 GWh | Jul 2014 | Dec 2024 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 4.3 GWh | Oct 2014 | Sep 2025 | Wind |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
| City of Tulare Water Facility | City of Tulare Water Pollution Control | Tulare, CA | California Independent System Operator (CISO) | 20.7 GWh | Dec 1990 | Dec 2024 | Natural Gas : 62.5% Other Biomass Gas : 21.5% Solar : 16.0% |
| Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 72.0 MWh | Sep 2011 | Dec 2024 | Solar |
| Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 41.9 GWh | Jan 2015 | Dec 2024 | Solar |
| City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 11.3 GWh | Oct 2010 | Dec 2024 | Other Biomass Gas : 60.4% Solar : 27.7% Natural Gas : 12.0% |
| SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2014 | Dec 2024 | Solar |
| SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2014 | Dec 2024 | Solar |
| Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 257.0 GWh | Oct 2015 | Dec 2024 | Solar |
| Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 52.8 GWh | Jul 2015 | Dec 2024 | Solar |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 541.0 MWh | May 2014 | Dec 2024 | Solar |
| Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2014 | Dec 2024 | Wind |
| City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2014 | Dec 2024 | Wind |
| Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2014 | Sep 2025 | Wind |
| Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 46.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 555.7 GWh | Oct 2013 | Dec 2024 | Solar |
| Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 5.0 GWh | Jul 2014 | Dec 2024 | Solar |
| Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 13.1 GWh | Apr 2017 | Dec 2024 | Landfill Gas |
| California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2014 | Dec 2024 | Solar |
| Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.6 GWh | Aug 2013 | Dec 2024 | Natural Gas |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 458.0 MWh | May 2014 | Dec 2024 | Solar |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 177.0 MWh | Nov 2003 | Dec 2024 | Natural Gas |
| Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2024 | Solar |
| Industry Solar Power Generation Station | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2013 | Dec 2024 | Solar |
| Navajo Solar Power Generation Station 1 | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2024 | Solar |
| Powhatan Solar Power Generation Station | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2013 | Dec 2024 | Solar |
| Otoe Solar Power Generation Station 1 LL | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2013 | Dec 2024 | Solar |
| Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2024 | Solar |
| Enerparc CA1 LLC | Enerparc CA 1, LLC | Hollister, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2023 | Solar |
| Westlands Solar PV Farm | Boralex US Operations LLC | Huron, CA | California Independent System Operator (CISO) | 33.9 GWh | Jan 2014 | Dec 2024 | Solar |
| CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2024 | Solar |
| CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2013 | Dec 2024 | Solar |
| Solar Gen 2 Solar Facility | Southern Power Co | Calipatria, CA | California Independent System Operator (CISO) | 364.2 GWh | Oct 2014 | Dec 2024 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2024 | Solar |
| Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 621.0 MWh | Nov 2013 | Dec 2024 | Solar |
| Oltmans SCE at Champagne | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2013 | Dec 2024 | Solar |
| Oltmans SCE at Jurupa | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 2.4 GWh | Nov 2013 | Dec 2024 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.6 GWh | Jul 2016 | Dec 2024 | Solar |
| Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2024 | Solar |
| Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 9.6 GWh | Apr 2005 | Dec 2024 | Natural Gas : 76.8% Solar : 21.6% Other Biomass Gas : 1.6% |
| Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 51.5 GWh | Dec 2013 | Dec 2024 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2024 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2011 | Dec 2024 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2011 | Dec 2024 | Solar |
| E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.2 GWh | Nov 2013 | Dec 2024 | Solar |
| Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 21.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2013 | Dec 2024 | Solar |
| Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2017 | Dec 2024 | Solar |
| NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 40.6 GWh | Feb 2017 | Dec 2024 | Solar |
| CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2016 | Dec 2024 | Solar |
| CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 44.4 GWh | Feb 2017 | Dec 2024 | Solar |
| Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2017 | Dec 2024 | Solar |
| CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2024 | Solar |
| RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 7.7 GWh | May 2016 | Dec 2024 | Solar |
| SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 13.4 GWh | Sep 2017 | Dec 2024 | Solar |
| Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 10.7 GWh | Sep 2016 | Dec 2024 | Solar |
| RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 58.2 GWh | Aug 2016 | Dec 2024 | Solar |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2017 | Dec 2024 | Wind |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2017 | Dec 2024 | Wind |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 255.9 GWh | Dec 2018 | Sep 2025 | Solar |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 149.9 GWh | Nov 2016 | Sep 2025 | Solar |
| American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 334.0 GWh | Nov 2020 | Sep 2025 | Solar |
| PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2017 | Dec 2024 | Solar |
| SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Solar |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
| Sun Streams, LLC | EDP Renewables North America LLC | Arlington, AZ | California Independent System Operator (CISO) | 405.6 GWh | Dec 2019 | Sep 2025 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2020 | Sep 2025 | Natural Gas |
| Solar Star California, XLIV, LLC | MN8 Energy LLC | Pearblossom, CA | California Independent System Operator (CISO) | 17.7 GWh | Nov 2016 | Dec 2024 | Solar |
| San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 24.5 GWh | Sep 2018 | Dec 2024 | Solar |
| Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 413.4 GWh | Nov 2019 | Sep 2025 | Wind |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 139.2 GWh | Nov 2016 | Sep 2025 | Solar |
| Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 901.6 MWh | Sep 2016 | Dec 2024 | Other Biomass Gas |
| White Wing Solar | Leeward Asset Management, LLC | Yuma, AZ | California Independent System Operator (CISO) | 467.0 GWh | Sep 2024 | Sep 2025 | Solar |
| Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 38.1 GWh | Mar 2017 | Dec 2024 | Solar |
| NLP Granger | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2016 | Dec 2024 | Solar |
| Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 48.3 GWh | Jun 2017 | Dec 2024 | Solar |
| Valley Center | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2016 | Dec 2024 | Solar |
| Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2016 | Dec 2024 | Solar |
| Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 42.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 917.0 MWh | Mar 2016 | Dec 2023 | Solar |
| Mesquite Solar 2, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 288.9 GWh | Nov 2016 | Sep 2025 | Solar |
| Mesquite Solar 3, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 448.5 GWh | Nov 2016 | Sep 2025 | Solar |
| Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 54.0 GWh | Jul 2016 | Dec 2024 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Jan 2017 | Dec 2024 | Solar |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 25.3 GWh | Jan 2017 | Dec 2024 | Solar |
| Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.1 GWh | Jun 2016 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on September 2025 generation numbers.| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,052.47 GWh |
| Alaska | # 48 | 147 | 527.57 GWh |
| Arizona | # 9 | 183 | 11,602.92 GWh |
| Arkansas | # 21 | 117 | 5,844.09 GWh |
| California | # 4 | 1,769 | 19,371.91 GWh |
| Colorado | # 30 | 304 | 4,433.17 GWh |
| Connecticut | # 32 | 168 | 3,779.74 GWh |
| Delaware | # 49 | 33 | 419.31 GWh |
| District of Columbia | # 51 | 16 | 16.99 GWh |
| Florida | # 2 | 323 | 24,446.09 GWh |
| Georgia | # 8 | 266 | 11,628.97 GWh |
| Hawaii | # 47 | 73 | 826.54 GWh |
| Idaho | # 44 | 148 | 1,495.33 GWh |
| Illinois | # 5 | 385 | 14,642.93 GWh |
| Indiana | # 14 | 213 | 8,730.35 GWh |
| Iowa | # 26 | 295 | 5,224.35 GWh |
| Kansas | # 25 | 189 | 5,250.86 GWh |
| Kentucky | # 23 | 60 | 5,806.86 GWh |
| Louisiana | # 13 | 87 | 9,343.34 GWh |
| Maine | # 45 | 217 | 1,135.36 GWh |
| Maryland | # 39 | 204 | 2,935.42 GWh |
| Massachusetts | # 41 | 652 | 1,746.92 GWh |
| Michigan | # 11 | 279 | 10,468.02 GWh |
| Minnesota | # 29 | 769 | 4,717.95 GWh |
| Mississippi | # 20 | 58 | 6,625.37 GWh |
| Missouri | # 22 | 128 | 5,843.17 GWh |
| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 1,949.24 GWh |
| Nebraska | # 34 | 132 | 3,501.38 GWh |
| Nevada | # 31 | 114 | 4,053.88 GWh |
| New Hampshire | # 42 | 60 | 1,549.07 GWh |
| New Jersey | # 27 | 399 | 4,969.45 GWh |
| New Mexico | # 36 | 145 | 3,317.84 GWh |
| New York | # 12 | 966 | 10,145.62 GWh |
| North Carolina | # 10 | 917 | 11,211.15 GWh |
| North Dakota | # 37 | 60 | 3,089.17 GWh |
| Ohio | # 6 | 201 | 12,818.31 GWh |
| Oklahoma | # 17 | 143 | 7,364.05 GWh |
| Oregon | # 28 | 282 | 4,812.51 GWh |
| Pennsylvania | # 3 | 260 | 19,731.43 GWh |
| Rhode Island | # 46 | 100 | 863.62 GWh |
| South Carolina | # 16 | 207 | 7,861.23 GWh |
| South Dakota | # 43 | 52 | 1,535.17 GWh |
| Tennessee | # 19 | 88 | 6,829.06 GWh |
| Texas | # 1 | 946 | 51,969.48 GWh |
| Utah | # 35 | 126 | 3,419.48 GWh |
| Vermont | # 50 | 120 | 165.14 GWh |
| Virginia | # 15 | 241 | 8,580.52 GWh |
| Washington | # 18 | 138 | 7,120.43 GWh |
| West Virginia | # 38 | 39 | 3,057.29 GWh |
| Wisconsin | # 24 | 251 | 5,674.74 GWh |
| Wyoming | # 33 | 73 | 3,641.70 GWh |