Mustang Two
17189 Avenal Cutoff Road, Lemoore, CA 93245Plant Summary Information
Mustang Two is ranked #45 out of 834 solar farms in California in terms of total annual net electricity generation.
Mustang Two generated 74.3 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Mustang Two |
|---|---|
| Utility Name | RE Mustang Two LLC |
| Location | Kings County, CA |
| Initial Operation Date | November 2020 |
| Last Update | Mar 2026 |
| Annual Generation | 398.9 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,612 out of 12,332 Power Plants Nationwide | |
| Ranked #177 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #114 out of 1,530 California Power Plants | |
| Ranked #45 out of 834 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
RE Mustang Two LLC (2018 to 2024) Idemitsu Renewables (2019 to 2019) |
Map of Mustang Two
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mustang Two.
Monthly Net Generation for Mustang Two
Monthly Plant Fuel Consumption for Mustang Two
Mustang Two Details
| Summary Information | |
|---|---|
| Plant Name | Mustang Two (62015) |
| Plant Address | 17189 Avenal Cutoff Road, Lemoore, CA 93245 |
| Utility | RE Mustang Two LLC (61589) |
| Latitude, Longitude | 36.21681, -119.89639 |
| Generation Dates on File | Nov 2020 to Mar 2026 |
| Initial Operation Date | November 2020 |
| Annual Generation | 398.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator M2BAR Details Operating November 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 71.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator M2WHI Details Operating November 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 139.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Mustang Two Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Idemitsu Renewables | 50 W. Liberty Dr., Suite 640, Reno, NV 89501 | Generator M2BAR | 100.00% |
| Idemitsu Renewables | 50 W. Liberty Dr., Suite 640, Reno, NV 89501 | Generator M2WHI | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #167 | Chestnut | Lemoore, CA | 381.3 GWh |
| #168 | Sherco Solar I | Clear Lake, MN | 404.1 GWh |
| #169 | Crane Solar Project | Crane, TX | 403.8 GWh |
| #170 | Swift Air Solar I | Goldsmith, TX | 402.4 GWh |
| #171 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
| #172 | Misae Solar | Childress, TX | 401.3 GWh |
| #173 | Scarlet II Hybrid | Cantua Creek, CA | 378.1 GWh |
| #174 | Mount Signal Solar Farm II | Calexico, CA | 399.3 GWh |
| #175 | Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 385.2 GWh |
| #176 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
| #178 | Pixley Solar Energy | Pixley, KS | 397.6 GWh |
| #179 | Madison Fields Solar Project, LLC | Irwin, OH | 394.7 GWh |
| #180 | Maverick Solar 7, LLC | Desert Center, CA | 391.5 GWh |
| #181 | Shakes Solar | Carrizo Springs, TX | 391.4 GWh |
| #182 | Buena Vista Energy Center | Chaparral, NM | 388.2 GWh |
| #183 | Riverstart Solar Park LLC | Modoc, IN | 389.4 GWh |
| #184 | Crooked Lake Solar, LLC | Blytheville, AR | 388.2 GWh |
| #185 | North Rosamond Solar LLC | Rosamond, CA | 388.1 GWh |
| #186 | Yellow Pine II | Enterprise, NV | 372.9 GWh |
| #187 | Yellow Pine Solar | Enterprise, NV | 376.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mustang Two.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Almond | Lemoore, CA | 39.2 GWh | 0.8 mi |
| American Kings Solar, LLC | Lemoore, CA | 314.4 GWh | 1.6 mi |
| Aquamarine | Lemoore, CA | 663.5 GWh | 1.9 mi |
| Chestnut | Lemoore, CA | 381.3 GWh | 3.9 mi |
| Henrietta Peaker | Lemoore, CA | 4.2 GWh | 1.6 mi |
| Henrietta Solar Project | Lemoore, CA | 218.0 GWh | 5 mi |
| Huron Solar Station | Huron, CA | 28.8 GWh | 7.9 mi |
| Java Solar, LLC | Lemoore, CA | 27.2 GWh | 4.6 mi |
| Kettleman Solar -Centaurus | Kettleman City, CA | 40.7 GWh | 11.8 mi |
| Lemoore 1 | Lemoore, CA | 1.4 GWh | 6.2 mi |
| Lemoore West | Lemoore, CA | 14.4 GWh | 7.1 mi |
| RE Kansas Solar, LLC | Lemoore, CA | 35.7 GWh | 4.1 mi |
| RE Kansas South LLC | Lemoore, CA | 49.2 GWh | 3.5 mi |
| RE Kent South, LLC | Lemoore, CA | 44.3 GWh | 0.8 mi |
| RE Mustang LLC | Lemoore, CA | 220.6 GWh | 0.5 mi |
| Slate Hybrid | Stratford, CA | 726.8 GWh | 0.7 mi |
| Solar Blue | Lemoore, CA | 650.5 GWh | 3 mi |
| Van der Kooi Dairy Solar Array | Riverdale, CA | 3.7 GWh | 8.7 mi |
| Westlands Solar PV Farm | Huron, CA | 33.9 GWh | 11.4 mi |
| Westside Solar Power PV1 | Lemoore, CA | 4.9 GWh | 0.6 mi |