Solar Blythe 2
NRG Solar Blythe II LLC, Blythe, CA 92225Plant Summary Information
Solar Blythe 2 is ranked #181 out of 763 solar farms in California in terms of total annual net electricity generation.
Solar Blythe 2 generated 12.2 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Solar Blythe 2 |
---|---|
Utility Name | NRG Solar Blythe II LLC |
Location | Riverside County, CA |
Initial Operation Date | April 2017 |
Last Update | Dec 2022 |
Annual Generation | 47.5 GWh |
Annual Consumption | 172.3 k MMBtu |
Ranked #3,906 out of 11,455 Power Plants Nationwide | |
Ranked #703 out of 5,173 Solar Power Plants Nationwide | |
Ranked #497 out of 1,543 California Power Plants | |
Ranked #181 out of 763 California Solar Power Plants | |
Fuel Types | Solar |
Map of Solar Blythe 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Blythe 2.
Monthly Net Generation for Solar Blythe 2
Solar Blythe 2 Details
Summary Information | |
---|---|
Plant Name | Solar Blythe 2 (60558) |
Plant Address | NRG Solar Blythe II LLC Blythe, CA 92225 |
Utility | NRG Solar Blythe II LLC (60307) |
Latitude, Longitude | 33.61868, -114.69618 |
Generation Dates on File | Apr 2017 to Dec 2022 |
Initial Operation Date | April 2017 |
Annual Generation | 47.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Generator PV1 Details Operating April 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Azimuth Angle | 180 |
DC Net Capacity | 27 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Solar Blythe 2 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
NRG Energy, Inc | 300 Carnegie Center, Suite 300, Princenton, NJ 8540 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#693 | CED Ducor 2 | Ducor, CA | 48.5 GWh |
#694 | Alpaugh North | Alpaugh, CA | 48.5 GWh |
#695 | Ruff Solar LLC | Ellenboro, NC | 48.4 GWh |
#696 | Rio Bravo Solar 1 LLC | McKittrick, CA | 48.3 GWh |
#697 | Simcoe Solar | Mountain Home, ID | 48.3 GWh |
#698 | CED Ducor 4 | Ducor, CA | 48.2 GWh |
#699 | RE Old River One, LLC | Bakersfield, CA | 48.2 GWh |
#700 | Pavant Solar III | Filmore, UT | 48.2 GWh |
#701 | CED Ducor 1 | Ducor, CA | 48.0 GWh |
#702 | Antelope Expansion 3A | Lancaster, CA | 47.7 GWh |
#704 | Todd Solar | Hurlock, MD | 47.3 GWh |
#705 | Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 47.1 GWh |
#706 | Blackwell Solar Park | Lost Hills, CA | 47.0 GWh |
#707 | Johnson Corner Solar 1 | Johnson City, KS | 46.9 GWh |
#708 | Windhub Solar A LLC | Mojave, CA | 46.8 GWh |
#709 | Longboat Solar, LLC | Barstow, CA | 46.8 GWh |
#710 | Arbor Hill Solar | Greenfield, IA | 46.8 GWh |
#711 | Cameron Solar | Cameron, SC | 46.7 GWh |
#712 | Gaskell West 1 Solar Facility | Lancaster, CA | 46.5 GWh |
#713 | Orchard Ranch Solar | Orchard, ID | 46.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Blythe 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Energy Center II | Blythe, CA | 388.0 GWh | 6.7 mi |
Arlington Energy Center III | Blythe, CA | 299.2 GWh | 6.7 mi |
Athos Solar Project | Desert Center, CA | 731.5 GWh | 39 mi |
Blythe Energy Inc | Blythe, CA | 1.6 TWh | 0.6 mi |
Blythe Mesa Solar II | Blythe, CA | 615.3 GWh | 1.8 mi |
Blythe Solar 110, LLC | Blythe, CA | 287.2 GWh | 5 mi |
Blythe Solar II, LLC | Blythe, CA | 334.3 GWh | 4.7 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 321.9 GWh | 3.7 mi |
Blythe Solar IV, LLC | Blythe, CA | 307.4 GWh | 6 mi |
Chuckawalla Solar | Blythe, CA | 8.3 GWh | 13.2 mi |
Chuckawalla Valley State Prison | Blythe, CA | 544.1 MWh | 12.5 mi |
Genesis Solar Energy Project | Blythe, CA | 633.2 GWh | 17.7 mi |
Ironwood Solar LLC | Blythe, CA | 9.5 GWh | 13.3 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 669.5 GWh | 5.8 mi |
Palo Verde College | Blythe, CA | 2.1 GWh | 3.9 mi |
SE Athos II, LLC | Desert Center, CA | 590.5 GWh | 39 mi |
Solar Blythe LLC | Blythe, CA | 43.7 GWh | 3.3 mi |
SunEdison Ironwood State Prison | Blythe, CA | 494.5 MWh | 13.3 mi |
Venable Solar 1 | Blythe, CA | 1.7 GWh | 7.3 mi |
Venable Solar 2 | Blythe, CA | 1.7 GWh | 7.3 mi |