SCV Water - Gladbach Water Treatment Plant Phases I and II

27234 Bouquet Canyon, Santa Clara, CA 91350

Plant Summary Information

SCV Water - Gladbach Water Treatment Plant Phases I and II is ranked #430 out of 852 solar farms in California in terms of total annual net electricity generation.

SCV Water - Gladbach Water Treatment Plant Phases I and II generated 238.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameSCV Water - Gladbach Water Treatment Plant Phases I and II
Utility NameSCV Water
LocationLos Angeles County, CA
Initial Operation DateDecember 2014
Last Update Dec 2024
Annual Generation 5.0 GWh
Annual Consumption 18.3 k MMBtu
Ranked #8,054 out of 12,613 Power Plants Nationwide
Ranked #3,218 out of 6,463 Solar Power Plants Nationwide
Ranked #1,089 out of 1,603 California Power Plants
Ranked #430 out of 852 California Solar Power Plants
Fuel Types Solar
Previous Operators Solar Star California XXVIII, LLC (2019 to 2019)
Goldman Sachs Renewable Power Group (2020 to 2020)
Goldman Sachs Renewable Power LLC (2021 to 2021)
MN8 Energy LLC (2022 to 2023)
SCV Water (2024 to 2024)

Map of SCV Water - Gladbach Water Treatment Plant Phases I and II

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SCV Water - Gladbach Water Treatment Plant Phases I and II.

Create Your Account Today

Monthly Net Generation for SCV Water - Gladbach Water Treatment Plant Phases I and II

Monthly Plant Fuel Consumption for SCV Water - Gladbach Water Treatment Plant Phases I and II

SCV Water - Gladbach Water Treatment Plant Phases I and II Details

Summary Information
Plant NameSCV Water - Gladbach Water Treatment Plant Phases I and II (63385)
Plant Address27234 Bouquet Canyon, Santa Clara, CA 91350
UtilitySCV Water (66983)
Latitude, Longitude34.43333, -118.51084
Generation Dates on FileJan 2019 to Dec 2024
Initial Operation DateDecember 2014
Annual Generation 5.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number15-191
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeWater Supply and Irrigation Systems (22131)
Sector Commercial Non-CHP (4)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 27.00 kV
Energy StorageNo

Generator CA135 Details Operating December 2014

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity4.5 MW
Summer Capacity4.5 MW
Winter Capacity4.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2014
Combined Heat & Power No
Sector NameCommercial Non-CHP (4)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity5.5 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

SCV Water - Gladbach Water Treatment Plant Phases I and II Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3208Onyx - Brockton Thatcher Landfill SolarBrockton, MA5.1 GWh
#3209Town of Rocky Hill PV CSGRocky Hill, CT5.1 GWh
#3210Lenape IIIndianapolis, IN5.1 GWh
#3211TES RowtierWestminster, MA5.1 GWh
#32123ColtonMillbury, MA5.1 GWh
#3213Vermillion River_MN_GRE DEA-GMFarmington, MN5.1 GWh
#3214Elm StreetDighton, MA5.1 GWh
#3215Suffolk CSG, LLCSuffolk, VA5.1 GWh
#3216Spring Grove Solar 2Spring Grove, VA5.0 GWh
#3217Morgan Community SolarMorgan, MN5.0 GWh
#3219IGS SBD1Bloomington, CA5.0 GWh
#3220Clinton Solar (OH)Martinsville, OH5.0 GWh
#3221Source Power NY III - RemsenRemsen, NY5.0 GWh
#3222Niagara Depot SolarNiagara Falls, NY5.0 GWh
#3223BWC Wading River One, Two, Three CSGMendon, MA5.0 GWh
#3224Croton SolarCortlandt, NY5.0 GWh
#3225Pine RidgeApache, OK5.0 GWh
#3226Gulfport Naval Base CSG PV SystemGulfport, MS5.0 GWh
#3227Ramona Solar EnergyRamona, CA5.0 GWh
#3228Hanford 1 and 2Hanford, CA5.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding SCV Water - Gladbach Water Treatment Plant Phases I and II.

Plant NamePlant LocationAnnual GenerationDistance
20701 Plummer PV, LLCChatsworth, CA3.1 GWh13.8 mi
8500 Balboa PV, LLCNorthridge, CA3.6 GWh14.5 mi
Ameresco Chiquita CanyonCastaic, CA2.1 GWh7.5 mi
Berry Placerita CogenSanta Clarita, CA3.8 GWh3.5 mi
CastaicCastaic, CA158.9 GWh13.5 mi
CFW Solar X LLC - VaughnSan Fernando, CA642.0 MWh11.7 mi
CSU Northridge PlantNorthridge, CA865.0 MWh13.2 mi
East Portal GeneratorChatsworth, CA3.9 GWh13.5 mi
FoothillSylmar, CA39.6 GWh8 mi
Foothill FeederCastaic, CA19.6 GWh7.9 mi
Maclay Solar ProjectSylmar, CA1.1 GWh9.1 mi
MM Lopez EnergyLake View Terrace, CA25.5 GWh11.9 mi
Nordhoff PlaceChatsworth, CA1.1 GWh13.9 mi
Olive View Medical CenterSylmar, CA11.4 GWh8.3 mi
PrairieChatsworth, CA2.7 GWh14 mi
San Francisquito 1Saugus, CA177.7 GWh11.3 mi
San Francisquito 2Saugus, CA44.7 GWh7 mi
Sunshine Gas ProducersSylmar, CA130.3 GWh6.8 mi
VA Sepulveda Ambulatory Care CenterNorth Hills, CA3.9 GWh12.8 mi
Valley (CA)Sun Valley, CA1.0 TWh14.7 mi