PFMG Solar Grossmont Helix LLC
7323 University Ave, La Mesa, CA 91942Plant Summary Information
PFMG Solar Grossmont Helix LLC is ranked #677 out of 849 solar farms in California in terms of total annual net electricity generation.
PFMG Solar Grossmont Helix LLC generated 334.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | PFMG Solar Grossmont Helix LLC |
|---|---|
| Utility Name | Altus Power America Management, LLC |
| Location | San Diego County, CA |
| Initial Operation Date | May 2018 |
| Last Update | Dec 2024 |
| Annual Generation | 2.0 GWh |
| Annual Consumption | 7.4 k MMBtu |
| Ranked #10,406 out of 12,539 Power Plants Nationwide | |
| Ranked #5,191 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,397 out of 1,600 California Power Plants | |
| Ranked #677 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
PFMG Solar Grossmont Helix LLC (2018 to 2022) Altus Power America Management, LLC (2023 to 2024) |
Map of PFMG Solar Grossmont Helix LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for PFMG Solar Grossmont Helix LLC.
Monthly Net Generation for PFMG Solar Grossmont Helix LLC
PFMG Solar Grossmont Helix LLC Details
| Summary Information | |
|---|---|
| Plant Name | PFMG Solar Grossmont Helix LLC (62611) |
| Plant Address | 7323 University Ave, La Mesa, CA 91942 |
| Utility | Altus Power America Management, LLC (60281) |
| Latitude, Longitude | 32.75328, -117.03524 |
| Generation Dates on File | May 2018 to Dec 2024 |
| Initial Operation Date | May 2018 |
| Annual Generation | 2.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF18-469 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator HELIX Details Operating May 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 236 |
| Tilt Angle | 5 |
| DC Net Capacity | 1.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
PFMG Solar Grossmont Helix LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5181 | USS Jayhawk Solar LLC (CSG) | Mankato, MN | 2.1 GWh |
| #5182 | FastSun 8 CSG | Courtland, MN | 2.1 GWh |
| #5183 | Olinda Trail Solar | Lindstrom, MN | 2.1 GWh |
| #5184 | USS Foley Solar LLC | Foley, MN | 2.1 GWh |
| #5185 | USS Peach Solar LLC | Mankato, MN | 2.1 GWh |
| #5186 | USS DVL Solar CSG | Waconia, MN | 2.1 GWh |
| #5187 | USS Buckaroo Solar LLC CSG | Glydon, MN | 2.0 GWh |
| #5188 | New Munich Solar | Melrose, MN | 2.0 GWh |
| #5189 | Concord Solar Farm | Concord, MA | 2.0 GWh |
| #5190 | Pipestone City Solar LLC CSG | Pipestone, MN | 2.0 GWh |
| #5192 | Centerville Solar Park | Centerville, IN | 2.0 GWh |
| #5193 | USS Flower Solar LLC CSG | Nicollet, MN | 2.0 GWh |
| #5194 | Walkerton | Walkerton, IN | 2.0 GWh |
| #5195 | Novel Stavem Solar LLC CSG | Glenwood, MN | 2.0 GWh |
| #5196 | Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh |
| #5197 | Grafton Solar | Grafton, MA | 2.0 GWh |
| #5198 | MN CSG 2019-16 LLC | Mankato, MN | 2.0 GWh |
| #5199 | Hinterland CSG, LLC | Clearlake, MN | 2.0 GWh |
| #5200 | Hudson County Solar | Kearny, NJ | 2.0 GWh |
| #5201 | Stromsburg-Polk County | Stromsburg, NE | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding PFMG Solar Grossmont Helix LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Childrens Hospital | San Diego, CA | 25.3 GWh | 7.5 mi |
| County of San Diego COC Hybrid | San Diego, CA | 3.1 GWh | 7.9 mi |
| County of San Diego SBRC | Chula Vista, CA | 2.3 GWh | 8.7 mi |
| CP Kelco San Diego Plant | San Diego, CA | 71.3 GWh | 7.5 mi |
| Cuyamaca Peak Energy Plant | El Cajon, CA | 5.9 GWh | 4.7 mi |
| El Cajon Energy Center | El Cajon, CA | 9.0 GWh | 4.7 mi |
| Grossmont College | El Cajon, CA | 4.4 GWh | 4.7 mi |
| Grossmont Hospital | La Mesa, CA | 25.5 GWh | 2.5 mi |
| Grossmont HS Solar Project | El Cajon, CA | 1.8 GWh | 4.8 mi |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | El Cajon, CA | 2.8 GWh | 5.6 mi |
| ISH Solar Hospital SDMC | San Diego, CA | 1.2 GWh | 4.4 mi |
| Kyocera International Inc.(San Diego) | San Diego, CA | 9.1 GWh | 7.6 mi |
| Lindberg FIeld Solar | San Diego, CA | 3.0 GWh | 10.2 mi |
| Lindberg Field Solar 2 | San Diego, CA | 1.7 GWh | 10 mi |
| MM San Diego-Miramar | San Diego, CA | 46.1 GWh | 9.7 mi |
| Naval Hospital Medical Center | San Diego, CA | 16.2 GWh | 6.7 mi |
| San Diego Community College | San Diego, CA | 8.3 GWh | 8.5 mi |
| San Diego State University | San Diego, CA | 52.4 GWh | 2.7 mi |
| Sycamore Energy LLC | Santee, CA | 23.1 GWh | 7.2 mi |
| University of San Diego | San Diego, CA | 8.2 GWh | 9.2 mi |