PFMG Solar Grossmont Helix LLC

7323 University Ave, La Mesa, CA 91942

Plant Summary Information

PFMG Solar Grossmont Helix LLC is ranked #677 out of 849 solar farms in California in terms of total annual net electricity generation.

PFMG Solar Grossmont Helix LLC generated 334.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NamePFMG Solar Grossmont Helix LLC
Utility NameAltus Power America Management, LLC
LocationSan Diego County, CA
Initial Operation DateMay 2018
Last Update Dec 2024
Annual Generation 2.0 GWh
Annual Consumption 7.4 k MMBtu
Ranked #10,406 out of 12,539 Power Plants Nationwide
Ranked #5,191 out of 6,400 Solar Power Plants Nationwide
Ranked #1,397 out of 1,600 California Power Plants
Ranked #677 out of 849 California Solar Power Plants
Fuel Types Solar
Previous Operator PFMG Solar Grossmont Helix LLC (2018 to 2022)
Altus Power America Management, LLC (2023 to 2024)

Map of PFMG Solar Grossmont Helix LLC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for PFMG Solar Grossmont Helix LLC.

Create Your Account Today

Monthly Net Generation for PFMG Solar Grossmont Helix LLC

PFMG Solar Grossmont Helix LLC Details

Summary Information
Plant NamePFMG Solar Grossmont Helix LLC (62611)
Plant Address7323 University Ave, La Mesa, CA 91942
UtilityAltus Power America Management, LLC (60281)
Latitude, Longitude32.75328, -117.03524
Generation Dates on FileMay 2018 to Dec 2024
Initial Operation DateMay 2018
Annual Generation 2.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF18-469
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSan Diego Gas & Electric Co (16609) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator HELIX Details Operating May 2018

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.2 MW
Summer Capacity1.2 MW
Winter Capacity1.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2018
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle236
Tilt Angle5
DC Net Capacity1.4 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

PFMG Solar Grossmont Helix LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5181USS Jayhawk Solar LLC (CSG)Mankato, MN2.1 GWh
#5182FastSun 8 CSGCourtland, MN2.1 GWh
#5183Olinda Trail SolarLindstrom, MN2.1 GWh
#5184USS Foley Solar LLCFoley, MN2.1 GWh
#5185USS Peach Solar LLCMankato, MN2.1 GWh
#5186USS DVL Solar CSGWaconia, MN2.1 GWh
#5187USS Buckaroo Solar LLC CSGGlydon, MN2.0 GWh
#5188New Munich SolarMelrose, MN2.0 GWh
#5189Concord Solar FarmConcord, MA2.0 GWh
#5190Pipestone City Solar LLC CSGPipestone, MN2.0 GWh
#5192Centerville Solar ParkCenterville, IN2.0 GWh
#5193USS Flower Solar LLC CSGNicollet, MN2.0 GWh
#5194WalkertonWalkerton, IN2.0 GWh
#5195Novel Stavem Solar LLC CSGGlenwood, MN2.0 GWh
#5196Rancho Cordova Medical OfficesRancho Cordova, CA2.0 GWh
#5197Grafton SolarGrafton, MA2.0 GWh
#5198MN CSG 2019-16 LLCMankato, MN2.0 GWh
#5199Hinterland CSG, LLCClearlake, MN2.0 GWh
#5200Hudson County SolarKearny, NJ2.0 GWh
#5201Stromsburg-Polk CountyStromsburg, NE2.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding PFMG Solar Grossmont Helix LLC.

Plant NamePlant LocationAnnual GenerationDistance
Childrens HospitalSan Diego, CA25.3 GWh7.5 mi
County of San Diego COC HybridSan Diego, CA3.1 GWh7.9 mi
County of San Diego SBRCChula Vista, CA2.3 GWh8.7 mi
CP Kelco San Diego PlantSan Diego, CA71.3 GWh7.5 mi
Cuyamaca Peak Energy PlantEl Cajon, CA5.9 GWh4.7 mi
El Cajon Energy CenterEl Cajon, CA9.0 GWh4.7 mi
Grossmont CollegeEl Cajon, CA4.4 GWh4.7 mi
Grossmont HospitalLa Mesa, CA25.5 GWh2.5 mi
Grossmont HS Solar ProjectEl Cajon, CA1.8 GWh4.8 mi
Grossmont-Cuyamaca-Cuyamaca Col. Solar &El Cajon, CA2.8 GWh5.6 mi
ISH Solar Hospital SDMCSan Diego, CA1.2 GWh4.4 mi
Kyocera International Inc.(San Diego)San Diego, CA9.1 GWh7.6 mi
Lindberg FIeld SolarSan Diego, CA3.0 GWh10.2 mi
Lindberg Field Solar 2San Diego, CA1.7 GWh10 mi
MM San Diego-MiramarSan Diego, CA46.1 GWh9.7 mi
Naval Hospital Medical CenterSan Diego, CA16.2 GWh6.7 mi
San Diego Community CollegeSan Diego, CA8.3 GWh8.5 mi
San Diego State UniversitySan Diego, CA52.4 GWh2.7 mi
Sycamore Energy LLCSantee, CA23.1 GWh7.2 mi
University of San DiegoSan Diego, CA8.2 GWh9.2 mi