Liberty HS Solar Project
925 Jewetta, Bakersfield, CA 93312Plant Summary Information
Liberty HS Solar Project is ranked #659 out of 885 solar farms in California in terms of total annual net electricity generation.
Liberty HS Solar Project generated 373.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Liberty HS Solar Project |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Kern County, CA |
| Initial Operation Date | December 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 2.5 GWh |
| Annual Consumption | 8.8 k MMBtu |
| Ranked #10,348 out of 13,081 Power Plants Nationwide | |
| Ranked #5,274 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,330 out of 1,606 California Power Plants | |
| Ranked #659 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Kern Highschool District Solar,LLC (2018 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2025) |
Map of Liberty HS Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Liberty HS Solar Project.
Monthly Net Generation for Liberty HS Solar Project
Monthly Plant Fuel Consumption for Liberty HS Solar Project
Liberty HS Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Liberty HS Solar Project (62274) |
| Plant Address | 925 Jewetta, Bakersfield, CA 93312 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 35.36441, -119.1275 |
| Generation Dates on File | Dec 2018 to Dec 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 2.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 19-572 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial Non-CHP (4) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator LHSSP Details Operating December 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 0.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 1.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.6 MW |
| Virtual Net Metering Agreement | No |
Liberty HS Solar Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| SunTrust Equipment Finance & Leasing Corp | 245 Peachtree Center Avenue, 17th Floor, Atlanta, GA 30303 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5264 | Bayer - Whippany, NJ | Whippany, NJ | 2.5 GWh |
| #5265 | ASA Gouverneur NY Solar I LLC | Richville, NY | 2.5 GWh |
| #5266 | City of Hayward WWTP | Hayward, CA | 10.5 GWh |
| #5267 | Sigmon Catawba Farm | Newton, NC | 2.5 GWh |
| #5268 | Panda Solar NC 7, LLC | Faison, NC | 2.5 GWh |
| #5269 | Charter Durabar at Woodstock | Woodstock, IL | 2.5 GWh |
| #5270 | SV CSG Plato Solar 1 LLC | Elgin, IL | 2.5 GWh |
| #5271 | IMPA Middletown Solar Park | Middletown, IN | 2.5 GWh |
| #5272 | Westminster | Westminster, VT | 2.5 GWh |
| #5273 | Lafayette 2 - McHenry Franks 2 | Huntley, IL | 2.5 GWh |
| #5275 | Westborough Solar LLC | Westborough, MA | 2.5 GWh |
| #5276 | General Electric Aircraft Engines | Lynn, MA | 2.5 GWh |
| #5277 | Axio Green LLC | Greenfield Township, MA | 2.5 GWh |
| #5278 | Manheim New England | North Dighton, MA | 2.5 GWh |
| #5279 | Middlesex Vo Tech Solar 1 LLC | Piscataway, NJ | 2.5 GWh |
| #5280 | Butler Plaza | Gainesville, FL | 2.5 GWh |
| #5281 | Dynamic Energy CT STAG | Milford, CT | 2.5 GWh |
| #5282 | FedEx Hagerstown | Hagerstown, MD | 2.5 GWh |
| #5283 | JD Foods - JD Foods | Fresno, CA | 2.5 GWh |
| #5284 | Oak Leaf - CSG Portfolio (OL 37) | Watkins, CO | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Liberty HS Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amazon Bakersfield 1 Solar Project | Bakersfield, CA | 8.3 GWh | 7.1 mi |
| Badger Creek Limited | Bakersfield, CA | 4.5 GWh | 9.9 mi |
| Bakersfield 111 | Bakersfield, CA | 1.9 GWh | 8.4 mi |
| Bakersfield Industrial PV 1 | Bakersfield, CA | 1.2 GWh | 7.9 mi |
| Bakersfield PV 1 | Bakersfield, CA | 5.6 GWh | 8.7 mi |
| Broadway 4 - Target Shafter | Shafter, CA | 2.8 GWh | 7.7 mi |
| Calibrant Bakersfield LLC | Bakersfield, CA | 3.9 GWh | 5.7 mi |
| Frontier HS Solar Project | Bakersfield, CA | 2.3 GWh | 3.9 mi |
| Improvement Dst No. 4 | Bakersfield, CA | 12.0 MWh | 5.7 mi |
| Kern Del Oro | Bakersfield, CA | 1.5 GWh | 9.5 mi |
| Kern River Cogeneration | Bakersfield, CA | 100.3 GWh | 10 mi |
| Live Oak Limited | Bakersfield, CA | 20.1 GWh | 9.9 mi |
| North Kern 1 | Shafter, CA | 6.9 GWh | 7.6 mi |
| North Kern 2 | City of Shafter, CA | 6.1 GWh | 7.3 mi |
| RE Old River One, LLC | Bakersfield, CA | 37.5 GWh | 10 mi |
| Shafter Solar LLC | Bakersfield, CA | 41.2 GWh | 2 mi |
| Southeast Kern River Cogen | Bakersfield, CA | 30.5 GWh | 10 mi |
| Sun Pacific - Lerdo | Shafter, CA | 6.0 GWh | 9.4 mi |
| Sunny Cow Solar, LLC | Bakersfield, CA | 5.0 GWh | 7.4 mi |
| Western Power & Steam Inc | Bakersfield, CA | 17.7 GWh | 8.3 mi |