Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2024 | Solar |
| Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 1.8 GWh | Jun 2014 | Dec 2024 | Solar |
| Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 23.6 GWh | Nov 2014 | Dec 2024 | Solar |
| Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2013 | Dec 2024 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2013 | Dec 2024 | Solar |
| Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2013 | Dec 2024 | Solar |
| Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.6 GWh | Jul 2013 | Dec 2024 | Solar |
| White River Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 44.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2015 | Dec 2024 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2013 | Dec 2024 | Solar |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2024 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2024 | Solar |
| Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2013 | Dec 2024 | Solar |
| McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 646.7 GWh | Jul 2015 | Dec 2024 | Solar |
| RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 125.1 GWh | Nov 2014 | Dec 2024 | Solar |
| Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 294.7 GWh | Sep 2013 | Dec 2024 | Solar |
| Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 269.5 GWh | Dec 2013 | Dec 2024 | Wind |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 379.0 GWh | Dec 2013 | Dec 2024 | Wind |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.3 GWh | Feb 2013 | Dec 2024 | Solar |
| Carlsbad Energy Center | NRG California Peaker Operations LLC | Carlsbad, CA | California Independent System Operator (CISO) | 193.1 GWh | Nov 2018 | Feb 2026 | Natural Gas |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.6 GWh | Jul 2016 | Dec 2024 | Solar |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.3 GWh | Feb 2013 | Dec 2024 | Landfill Gas |
| RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 44.3 GWh | Nov 2014 | Dec 2024 | Solar |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.7 GWh | Mar 2014 | Dec 2024 | Landfill Gas |
| RE Old River One, LLC | Onward Energy | Bakersfield, CA | California Independent System Operator (CISO) | 35.6 GWh | Nov 2014 | Dec 2024 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 77.9 GWh | Jul 2012 | Dec 2024 | Natural Gas |
| Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 31.8 GWh | Jan 2014 | Dec 2024 | Landfill Gas |
| RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 35.7 GWh | Nov 2014 | Dec 2024 | Solar |
| RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 39.3 GWh | Nov 2014 | Dec 2024 | Solar |
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 352.7 GWh | Jun 2013 | Dec 2024 | Solar |
| Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2013 | Dec 2024 | Solar |
| Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2013 | Dec 2024 | Solar |
| Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2013 | Dec 2024 | Solar |
| Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 130.6 GWh | Jul 2014 | Feb 2026 | Landfill Gas |
| Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Dec 2024 | Solar |
| Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Dec 2013 | Dec 2024 | Solar |
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2024 | Solar |
| Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 888.2 GWh | Feb 2014 | Feb 2026 | Solar |
| RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 40.4 GWh | Nov 2014 | Dec 2024 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2011 | Dec 2024 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2024 | Solar |
| Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 715.9 GWh | Feb 2014 | Feb 2026 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2011 | Dec 2024 | Solar |
| Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2016 | Dec 2024 | Solar |
| Silicon Valley Clean Water | Silicon Valley Clean Water | Redwood City, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2015 | Dec 2024 | Other Biomass Gas : 71.4% Natural Gas : 28.6% |
| Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.5 GWh | Jun 2020 | Feb 2026 | Natural Gas |
| Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Dec 2024 | Solar |
| Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 14.8 GWh | Dec 2016 | Dec 2024 | Solar |
| RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 483.5 GWh | Oct 2016 | Dec 2024 | Solar |
| Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2016 | Dec 2024 | Solar |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 16.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| Intel Santa Clara | Bloom Energy | Santa Clara, CA | California Independent System Operator (CISO) | 7.7 GWh | Dec 2014 | Dec 2024 | Natural Gas |
| Zero Waste Energy Development Co LLC | Zero Waste Energy Development Company LLC | San Jose, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2015 | Dec 2024 | Other Biomass Gas |
| Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 134.4 GWh | Nov 2016 | Feb 2026 | Solar |
| Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 4.2 GWh | Jan 2016 | Dec 2024 | Solar |
| Building F | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2016 | Dec 2024 | Solar |
| San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 24.5 GWh | Sep 2018 | Dec 2024 | Solar |
| Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 120.3 GWh | Nov 2016 | Feb 2026 | Solar |
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 201.9 GWh | Nov 2016 | Feb 2026 | Solar |
| Freeway Springs | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 3.1 GWh | Sep 2016 | Dec 2024 | Solar |
| Dulles | Golden Springs Development Company LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2016 | Dec 2024 | Solar |
| Buidling L | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2016 | Dec 2024 | Solar |
| Building G | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.0 GWh | Aug 2016 | Dec 2024 | Solar |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 244.1 GWh | Dec 2018 | Feb 2026 | Solar |
| RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 7.7 GWh | May 2016 | Dec 2024 | Solar |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 10.7 GWh | Sep 2016 | Dec 2024 | Solar |
| CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2024 | Solar |
| E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.2 GWh | Nov 2013 | Dec 2024 | Solar |
| Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2013 | Dec 2024 | Solar |
| RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 58.2 GWh | Aug 2016 | Dec 2024 | Solar |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 42.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Valley Center | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2016 | Dec 2024 | Solar |
| NLP Granger | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2016 | Dec 2024 | Solar |
| Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 364.8 GWh | Nov 2019 | Feb 2026 | Wind |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 25.3 GWh | Jan 2017 | Dec 2024 | Solar |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Jan 2017 | Dec 2024 | Solar |
| Mesquite Solar 3, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 441.5 GWh | Nov 2016 | Feb 2026 | Solar |
| Mesquite Solar 2, LLC | Consolidated Edison Development Inc. | Tonopah, AZ | California Independent System Operator (CISO) | 288.1 GWh | Nov 2016 | Feb 2026 | Solar |
| Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 38.1 GWh | Mar 2017 | Dec 2024 | Solar |
| White Wing Solar | Leeward Asset Management, LLC | Yuma, AZ | California Independent System Operator (CISO) | 445.1 GWh | Sep 2024 | Feb 2026 | Solar |
| Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.1 GWh | Jun 2016 | Dec 2024 | Solar |
| Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 54.0 GWh | Jul 2016 | Dec 2024 | Solar |
| Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 917.0 MWh | Mar 2016 | Dec 2023 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 991.0 MWh | Jul 2016 | Jul 2024 | Solar |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 143.1 GWh | Nov 2016 | Feb 2026 | Solar |
| CED Ducor 2 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 52.2 GWh | Nov 2016 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |