Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| North Palm Springs 1A | Altus Power America Management, LLC | Palm Springs, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2012 | Dec 2025 | Solar |
| Wagner Wind LLC | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 10.1 GWh | Nov 2012 | Dec 2025 | Wind |
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2013 | Dec 2025 | Solar |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.8 GWh | May 2013 | Dec 2025 | Landfill Gas |
| Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 1.4 GWh | Jun 2013 | Dec 2025 | Solar |
| Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.3 GWh | Nov 2013 | Dec 2025 | Solar |
| West Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 14.1 GWh | Apr 2013 | Dec 2025 | Solar |
| Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2013 | Dec 2025 | Solar |
| Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 4.2 GWh | Jul 2013 | Dec 2025 | Solar |
| Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 294.7 GWh | Jul 2012 | Dec 2025 | Wind |
| Mesquite Solar 1 | RWE Clean Energy | Tonopah, AZ | California Independent System Operator (CISO) | 392.2 GWh | Oct 2011 | Dec 2025 | Solar |
| City of Madera WWTP | SunE GIL1, LLC | Madera, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2009 | Dec 2025 | Solar |
| Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2009 | Dec 2025 | Solar |
| West Valley High School Solar | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2012 | Dec 2025 | Solar |
| Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 969.2 GWh | Mar 2013 | Jun 2026 | Solar |
| Power Generation Station (PGS) 2 | East Bay Municipal Util Dist - (CA) | Oakland, CA | California Independent System Operator (CISO) | 20.3 GWh | Nov 2011 | Dec 2025 | Other Biomass Gas |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2013 | Dec 2025 | Solar |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 233.7 GWh | Nov 2011 | Oct 2025 | Wind |
| Montezuma Wind II | NextEra Energy Montezuma Wind II, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 195.8 GWh | Dec 2011 | Dec 2025 | Wind |
| Signal Hill West Unit | Signal Hill Petroleum, Inc | Signal Hill, CA | California Independent System Operator (CISO) | 39.2 GWh | Jun 2004 | Jun 2026 | Other Gas |
| Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2013 | Dec 2025 | Solar |
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 264.9 GWh | Nov 2012 | Nov 2025 | Solar |
| Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2001 | Jun 2026 | Natural Gas |
| North Palm Springs 4A | Altus Power America Management, LLC | Palm Springs, CA | California Independent System Operator (CISO) | 8.3 GWh | Sep 2012 | Dec 2025 | Solar |
| Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 292.7 GWh | Sep 2013 | Dec 2025 | Solar |
| C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 36.7 GWh | Sep 1957 | Jun 2026 | Purchased Steam |
| Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 292.8 GWh | Nov 2012 | Dec 2025 | Wind |
| McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 638.7 GWh | Jul 2015 | Dec 2025 | Solar |
| SEPV 8 | Deriva Energy | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.2 GWh | May 2013 | Dec 2025 | Solar |
| Venable Solar 2 | Madison Energy Investments LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Sep 2025 | Solar |
| Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 31.6 GWh | Jan 2014 | Dec 2025 | Landfill Gas |
| Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2024 | Solar |
| Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 255.0 GWh | Jan 2012 | Dec 2025 | Wind |
| Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2013 | Dec 2025 | Solar |
| Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 32.7 GWh | Feb 2013 | Dec 2025 | Landfill Gas |
| Venable Solar 1 | Madison Energy Investments LLC | Blythe, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2015 | Dec 2025 | Solar |
| CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 33.6 GWh | Sep 2010 | Jun 2026 | Natural Gas : 80.2% Solar : 19.8% |
| Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.1 GWh | Oct 2011 | Dec 2025 | Wind |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 404.0 MWh | Nov 2011 | Dec 2025 | Wind |
| Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 4.4 GWh | Jan 2007 | Dec 2025 | Natural Gas |
| Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 24.8 GWh | Mar 2014 | Dec 2025 | Landfill Gas |
| Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2012 | Dec 2025 | Solar |
| Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2012 | Dec 2025 | Natural Gas |
| Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2012 | Dec 2025 | Solar |
| Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 132.3 GWh | Jul 2014 | Jun 2026 | Landfill Gas |
| Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 64.0 GWh | Jul 2012 | Dec 2025 | Natural Gas |
| North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 364.8 GWh | Nov 2012 | Dec 2025 | Wind |
| TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 57.9 GWh | Feb 2013 | Dec 2025 | Solar |
| RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 50.5 GWh | May 2013 | Dec 2025 | Solar |
| Centinela Solar Energy | Centinela Solar Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 448.6 GWh | Jun 2013 | Dec 2025 | Solar |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 8.9 GWh | Oct 2011 | Dec 2025 | Natural Gas |
| RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 45.1 GWh | Nov 2013 | Dec 2025 | Solar |
| Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 66.9 GWh | Dec 1995 | Jun 2026 | Natural Gas |
| Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.6 GWh | Jul 2012 | Dec 2025 | Natural Gas |
| Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 24.2 GWh | Aug 2012 | Dec 2025 | Solar |
| Temescal Canyon RV, LLC | Temescal Canyon RV, LLC | Corona, CA | California Independent System Operator (CISO) | 1.6 GWh | Apr 2011 | Dec 2025 | Solar |
| Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 14.7 GWh | Jan 2013 | Dec 2025 | Landfill Gas |
| Adobe Solar | Southern Power Co | Arvin, CA | California Independent System Operator (CISO) | 36.4 GWh | Apr 2014 | Dec 2025 | Solar |
| Regulus Solar Project | Regulus Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 149.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 55.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 226.4 GWh | Nov 2018 | Jun 2026 | Solar |
| Green Beanworks C PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 8.3 GWh | Jul 2018 | Dec 2025 | Solar |
| CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Green Beanworks D PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2018 | Dec 2025 | Solar |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.9 GWh | Jul 2018 | Dec 2025 | Wind |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2017 | Dec 2025 | Solar |
| CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2013 | Dec 2025 | Solar |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 55.6 GWh | Feb 2018 | Dec 2025 | Solar |
| RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.0 GWh | Apr 2023 | Dec 2025 | Solar |
| CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2025 | Solar |
| Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2018 | Dec 2025 | Solar |
| Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 892.0 MWh | Nov 2017 | Dec 2025 | Solar |
| Bakersfield PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 5.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2017 | Oct 2025 | Solar |
| AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2016 | Dec 2025 | Natural Gas |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.9 GWh | Jun 2017 | Dec 2025 | Solar |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 124.2 GWh | Apr 2023 | Jun 2026 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.8 GWh | Apr 2023 | Dec 2025 | Solar |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2016 | Dec 2025 | Natural Gas |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 130.8 GWh | Oct 2017 | Jun 2026 | Wind |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 47.5 GWh | Apr 2023 | Dec 2025 | Solar |
| Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.5 GWh | Nov 2017 | Dec 2025 | Solar |
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| Wistaria Ranch Solar | RWE Clean Energy | Calexico, CA | California Independent System Operator (CISO) | 269.4 GWh | Nov 2018 | Jun 2026 | Solar |
| Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Tulare BioMAT Fuel Cell | Central CA Fuel Cell 2, LLC | Tulare, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2019 | Dec 2025 | Other Biomass Gas : 77.3% Natural Gas : 22.7% |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 635.0 GWh | Oct 2018 | Jun 2026 | Solar |
| One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 5.5 GWh | Aug 2017 | Dec 2025 | Solar |
| Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 364.5 GWh | Dec 2019 | Jun 2026 | Solar |
| Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 6.0 GWh | Mar 2018 | Dec 2025 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2016 | Dec 2025 | Solar |
| Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 431.4 GWh | Nov 2018 | Jun 2026 | Wind |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.1 GWh | Jan 2018 | Dec 2025 | Other Biomass Gas |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.6 GWh | Apr 2018 | Dec 2025 | Solar |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.7 GWh | Jul 2018 | Dec 2025 | Wind |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2017 | Dec 2025 | Wind |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 4.2 GWh | Aug 2017 | Dec 2025 | Wind |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |