Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 264.9 GWh | Nov 2012 | Nov 2025 | Solar |
| Brea Expansion Plant | Brea Power II | Brea, CA | California Independent System Operator (CISO) | 245.8 GWh | Oct 2012 | May 2026 | Landfill Gas |
| North Palm Springs 4A | Altus Power America Management, LLC | Palm Springs, CA | California Independent System Operator (CISO) | 8.3 GWh | Sep 2012 | Dec 2025 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.6 GWh | Jun 2013 | Dec 2025 | Landfill Gas |
| Alpaugh 50 | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 57.3 GWh | Nov 2012 | Dec 2025 | Solar |
| Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 14.7 GWh | Jan 2013 | Dec 2025 | Landfill Gas |
| Alpaugh North | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 21.1 GWh | Nov 2012 | Dec 2025 | Solar |
| Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2024 | Solar |
| Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 255.0 GWh | Jan 2012 | Dec 2025 | Wind |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2013 | Dec 2025 | Solar |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.9 GWh | Feb 2013 | Dec 2025 | Solar |
| Kaiser Ontario | Bloom Energy 2009 PPA | Ontario, CA | California Independent System Operator (CISO) | 7.7 GWh | Sep 2012 | Dec 2025 | Natural Gas |
| Radiance Solar 5 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2013 | Dec 2025 | Solar |
| Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 8.4 GWh | May 2012 | Dec 2025 | Natural Gas |
| Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 132.0 GWh | Jul 2014 | May 2026 | Landfill Gas |
| Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 448.6 GWh | Jun 2013 | Dec 2025 | Solar |
| Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 64.0 GWh | Jul 2012 | Dec 2025 | Natural Gas |
| Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 2012 | Dec 2025 | Natural Gas |
| North Palm Springs 1A | Altus Power America Management, LLC | Palm Springs, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2012 | Dec 2025 | Solar |
| Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 292.8 GWh | Nov 2012 | Dec 2025 | Wind |
| Nickel 1 Solar Facility | Altus Power America Management, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2012 | Dec 2025 | Solar |
| La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 806.0 MWh | Nov 2012 | Dec 2025 | Solar |
| Radiance Solar 4 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2025 | Solar |
| Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 22.5 GWh | Nov 2012 | Dec 2025 | Wind |
| Axium Modesto Solar | Axium US Solar Holdings LLC | Modesto, CA | California Independent System Operator (CISO) | 53.2 GWh | Nov 2012 | Dec 2025 | Solar |
| Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 9.7 GWh | Nov 2012 | Dec 2025 | Wind |
| Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2013 | Dec 2025 | Solar |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 404.0 MWh | Nov 2011 | Dec 2025 | Wind |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 875.0 MWh | Nov 2012 | May 2026 | Wind |
| Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2025 | Wind |
| RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 50.5 GWh | May 2013 | Dec 2025 | Solar |
| Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2012 | Dec 2025 | Solar |
| Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 620.2 GWh | Oct 2013 | Dec 2025 | Solar |
| North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 364.8 GWh | Nov 2012 | Dec 2025 | Wind |
| Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.4 GWh | Oct 2004 | Dec 2025 | Landfill Gas |
| Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2012 | Dec 2025 | Solar |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 8.9 GWh | Oct 2011 | Dec 2025 | Natural Gas |
| Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2013 | Dec 2025 | Solar |
| Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.8 GWh | Dec 2013 | Dec 2025 | Solar |
| White River Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 36.1 GWh | Jun 2013 | Dec 2025 | Solar |
| Corcoran Solar | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.1 GWh | Jul 2013 | Dec 2025 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.1 GWh | May 2013 | Dec 2025 | Solar |
| Irwindale Brew Yard, LLC | Irwindale Brew Yard, LLC | Irwindale, CA | California Independent System Operator (CISO) | 517.0 MWh | Jan 2002 | Apr 2025 | Solar : 99.8% |
| TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 57.9 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2013 | Dec 2025 | Solar |
| Foundation Wal-Mart Red Bluff | Foundation CA Fund VI Manager LLC | Red Bluff, CA | California Independent System Operator (CISO) | 1.5 GWh | Aug 2012 | May 2026 | Wind |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.8 GWh | May 2013 | Dec 2025 | Landfill Gas |
| Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 967.4 GWh | Mar 2013 | May 2026 | Solar |
| Power Generation Station (PGS) 2 | East Bay Municipal Util Dist - (CA) | Oakland, CA | California Independent System Operator (CISO) | 20.3 GWh | Nov 2011 | Dec 2025 | Other Biomass Gas |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 233.7 GWh | Nov 2011 | Oct 2025 | Wind |
| Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2009 | Dec 2025 | Solar |
| City of Madera WWTP | SunE GIL1, LLC | Madera, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2009 | Dec 2025 | Solar |
| Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.1 GWh | Oct 2011 | Dec 2025 | Wind |
| Montezuma Wind II | NextEra Energy Montezuma Wind II, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 195.8 GWh | Dec 2011 | Dec 2025 | Wind |
| Signal Hill West Unit | Signal Hill Petroleum, Inc | Signal Hill, CA | California Independent System Operator (CISO) | 38.9 GWh | Jun 2004 | May 2026 | Other Gas |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 638.8 GWh | Oct 2018 | May 2026 | Solar |
| Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2017 | Dec 2025 | Solar |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2017 | Dec 2025 | Solar |
| Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 6.0 GWh | Mar 2018 | Dec 2025 | Solar |
| One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 5.5 GWh | Aug 2017 | Dec 2025 | Solar |
| Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 118.5 GWh | Nov 2018 | May 2026 | Wind |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 4.2 GWh | Aug 2017 | Dec 2025 | Wind |
| CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2013 | Dec 2025 | Solar |
| Green Beanworks C PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 8.3 GWh | Jul 2018 | Dec 2025 | Solar |
| Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 78.7 GWh | Nov 2018 | Dec 2025 | Wind |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.6 GWh | Apr 2018 | Dec 2025 | Solar |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.7 GWh | Jul 2018 | Dec 2025 | Wind |
| Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.8 GWh | Mar 2019 | Dec 2025 | Wind |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.9 GWh | Jul 2018 | Dec 2025 | Wind |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 55.6 GWh | Feb 2018 | Dec 2025 | Solar |
| CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 2013 | Dec 2025 | Solar |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 123.9 GWh | Apr 2023 | May 2026 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.8 GWh | Apr 2023 | Dec 2025 | Solar |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 47.5 GWh | Apr 2023 | Dec 2025 | Solar |
| RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.0 GWh | Apr 2023 | Dec 2025 | Solar |
| CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.5 GWh | Nov 2017 | Dec 2025 | Solar |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.1 GWh | Jan 2018 | Dec 2025 | Other Biomass Gas |
| Tulare BioMAT Fuel Cell | Central CA Fuel Cell 2, LLC | Tulare, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2019 | Dec 2025 | Other Biomass Gas : 77.3% Natural Gas : 22.7% |
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2016 | Dec 2025 | Solar |
| RPUWD Scheuer Well Solar Project | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2018 | Dec 2025 | Solar |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2016 | Dec 2025 | Natural Gas |
| Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 55.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2018 | Dec 2025 | Solar |
| Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2025 | Solar |
| AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2016 | Dec 2025 | Natural Gas |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 234.0 GWh | Nov 2018 | May 2026 | Solar |
| ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.4 GWh | Jan 2018 | Dec 2025 | Other Biomass Gas |
| ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 5.5 GWh | Jan 2018 | Dec 2025 | Other Biomass Gas |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2017 | Dec 2025 | Wind |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.9 GWh | Jun 2017 | Dec 2025 | Solar |
| Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 129.6 GWh | Oct 2017 | May 2026 | Wind |
| Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 373.2 GWh | Dec 2019 | May 2026 | Solar |
| Wistaria Ranch Solar | RWE Clean Energy | Calexico, CA | California Independent System Operator (CISO) | 271.3 GWh | Nov 2018 | May 2026 | Solar |
| Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 430.8 GWh | Nov 2018 | May 2026 | Wind |
| Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2017 | Oct 2025 | Solar |
| Bakersfield PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 5.6 GWh | Nov 2017 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |