Redwood 4 Solar Farm
4238 Towerline Rd, Edison, CA 93307Plant Summary Information
Redwood 4 Solar Farm is ranked #210 out of 849 solar farms in California in terms of total annual net electricity generation.
Redwood 4 Solar Farm generated 4.9 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Redwood 4 Solar Farm |
|---|---|
| Utility Name | 54 KR 8me LLC |
| Location | Kern County, CA |
| Initial Operation Date | December 2017 |
| Last Update | Dec 2024 |
| Annual Generation | 39.9 GWh |
| Annual Consumption | 142.5 k MMBtu |
| Ranked #4,360 out of 12,539 Power Plants Nationwide | |
| Ranked #1,089 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #533 out of 1,600 California Power Plants | |
| Ranked #210 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Redwood 4 Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Redwood 4 Solar Farm.
Monthly Net Generation for Redwood 4 Solar Farm
Redwood 4 Solar Farm Details
| Summary Information | |
|---|---|
| Plant Name | Redwood 4 Solar Farm (60490) |
| Plant Address | 4238 Towerline Rd, Edison, CA 93307 |
| Utility | 54 KR 8me LLC (60277) |
| Latitude, Longitude | 35.3142, -118.81192 |
| Generation Dates on File | Dec 2017 to Dec 2024 |
| Initial Operation Date | December 2017 |
| Annual Generation | 39.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF18-10-000 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG18-8-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator RW4SF Details Operating December 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 26.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Redwood 4 Solar Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1079 | Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 40.5 GWh |
| #1080 | Lyons Road | Owosso, MI | 40.5 GWh |
| #1081 | RE Columbia Two, LLC | Mojave, CA | 40.4 GWh |
| #1082 | Fusion Solar Center LLC | Baltic, CT | 40.3 GWh |
| #1083 | Citizens Imperial Solar | Calipatria, CA | 40.3 GWh |
| #1084 | Energix Buckingham, LLC | Cumberland, VA | 40.3 GWh |
| #1085 | Garnet Mesa Solar | Delta, CO | 40.2 GWh |
| #1086 | Pleasant Hill Solar | Suffolk, VA | 40.2 GWh |
| #1087 | Fort Huachuca Solar PV Project | Sierra Vista, AZ | 40.1 GWh |
| #1088 | Temperance Solar, LLC | Erie, MI | 40.0 GWh |
| #1090 | Johnson Corner Solar 1 | Johnson City, KS | 39.7 GWh |
| #1091 | Vandenberg Solar Project | Vandenberg Airforce B, CA | 39.7 GWh |
| #1092 | AP North Lake I, LP | Hemet, CA | 39.6 GWh |
| #1093 | Adobe Solar | Arvin, CA | 39.6 GWh |
| #1094 | Watlington Solar | Halifax, VA | 39.6 GWh |
| #1095 | Energix Nokesville, LLC | Nokesville, VA | 39.6 GWh |
| #1096 | Sierra Solar Greenworks | Lancaster, CA | 39.5 GWh |
| #1097 | Cotton Center Solar Hybrid | Gila Bend, AZ | 36.5 GWh |
| #1098 | Nicolis Solar PV Plant | Delano, CA | 39.4 GWh |
| #1099 | Cameron Solar | Cameron, SC | 39.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Redwood 4 Solar Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bakersfield 111 | Bakersfield, CA | 1.9 GWh | 10 mi |
| Bakersfield Industrial PV 1 | Bakersfield, CA | 2.1 GWh | 10.3 mi |
| Bakersfield PV 1 | Bakersfield, CA | 5.2 GWh | 9.6 mi |
| Bear Mountain Limited | Bakersfield, CA | 32.6 GWh | 9.7 mi |
| Hayworth Solar | Edison, CA | 46.0 GWh | 3.8 mi |
| Improvement Dst No. 4 | Bakersfield, CA | 12.0 MWh | 14.2 mi |
| Kern Del Oro | Bakersfield, CA | 4.0 MWh | 9.6 mi |
| Kern Oil & Refining Co | Bakersfield, CA | 34.1 GWh | 6.1 mi |
| Kern River 1 | Bakersfield, CA | 192.1 GWh | 10.3 mi |
| Kern River Cogeneration | Bakersfield, CA | 154.9 GWh | 13.6 mi |
| Kern River Eastridge Cogen | Bakersfield, CA | 221.6 GWh | 12.1 mi |
| Kern Sunset 1886-WD | Bakersfield, CA | 270.0 MWh | 8.5 mi |
| Orion Solar I | Arvin, CA | 28.3 GWh | 11.8 mi |
| Orion Solar II | Arvin, CA | 19.0 GWh | 11.8 mi |
| Redcrest Solar Farm | Edison, CA | 25.1 GWh | 0.5 mi |
| Regulus Solar Project | Bakersfield, CA | 153.6 GWh | 2.5 mi |
| Rio Bravo Hydro Project | Bakersfield, CA | 34.6 GWh | 8 mi |
| Southeast Kern River Cogen | Bakersfield, CA | 47.1 GWh | 11.3 mi |
| Sycamore Cogeneration | Bakersfield, CA | 304.3 GWh | 13.7 mi |
| Woodmere Solar Farm | Edison, CA | 24.4 GWh | 0.8 mi |