Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Oro Loma | RWE Clean Energy | Oro Loma, CA | California Independent System Operator (CISO) | 49.2 GWh | Dec 2016 | Dec 2025 | Solar |
| Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 59.3 GWh | Aug 2015 | Dec 2025 | Solar |
| Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 18.0 GWh | Jun 2015 | Dec 2025 | Solar |
| SunE- E Philadelphia Ontario | SunEdison LLC | Ontario, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2016 | Dec 2025 | Solar |
| Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 35.4 GWh | Apr 2015 | Dec 2025 | Solar |
| Dulles | Golden Springs Development Company LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2016 | Dec 2025 | Solar |
| Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.2 GWh | Mar 2016 | Dec 2025 | Solar |
| Freeway Springs | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2016 | Dec 2025 | Solar |
| Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2025 | Water |
| Great Valley Solar Portfolio Holdings, L | RWE Clean Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 490.0 GWh | Nov 2017 | Jun 2026 | Solar |
| SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 201.8 GWh | Nov 2016 | Jun 2026 | Solar |
| SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2025 | Solar |
| SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.8 GWh | Oct 2014 | Dec 2025 | Solar |
| Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 14.0 GWh | Nov 2016 | Dec 2025 | Solar |
| RE Tranquillity | Southern Power Co | Cantua Creek, CA | California Independent System Operator (CISO) | 484.8 GWh | Jun 2016 | Dec 2025 | Solar |
| Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 118.5 GWh | Nov 2016 | Jun 2026 | Solar |
| Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 81.6 GWh | Feb 2022 | Jun 2026 | Solar |
| EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2021 | Dec 2025 | Solar |
| IGS KSBD | Altus Power America Management, LLC | Highland, CA | California Independent System Operator (CISO) | 9.1 GWh | Feb 2022 | Dec 2025 | Solar |
| Vallecitos Water District | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2021 | Dec 2025 | Solar |
| Catalina Express | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Marina South | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.1 GWh | Sep 2021 | Dec 2025 | Solar |
| EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2025 | Solar |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 98.6 GWh | Feb 2022 | Jun 2026 | Solar |
| EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 10.6 GWh | Apr 2022 | Dec 2025 | Solar |
| CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2025 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2024 | Dec 2024 | Solar |
| Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2024 | Solar |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 493.8 GWh | Nov 2023 | Jun 2026 | Solar |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 834.1 GWh | Jun 2023 | Jun 2026 | Solar |
| Deer Creek 2 | Altus Power America Management, LLC | Shingle Springs, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Chaparral Springs | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 406.7 GWh | Mar 2025 | Jun 2026 | Solar |
| EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2021 | Dec 2025 | Solar |
| California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2021 | Dec 2025 | Solar |
| El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 2021 | Dec 2025 | Solar |
| Prologis L.P | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 5.9 GWh | Jul 2018 | Dec 2025 | Solar |
| Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 8.0 GWh | Oct 2021 | Dec 2025 | Solar |
| BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 330.3 GWh | Jan 2022 | Jun 2026 | Solar |
| Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2024 | Solar |
| El Dorado Solar, LLC | Altus Power America Management, LLC | El Dorado Hills, CA | California Independent System Operator (CISO) | 3.3 GWh | Mar 2021 | Dec 2025 | Solar |
| Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 712.6 GWh | Jan 2025 | Jun 2026 | Solar |
| Rabbitbrush Solar, LLC | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 255.7 GWh | Sep 2022 | Jun 2026 | Solar |
| Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 291.6 GWh | Nov 2021 | Jun 2026 | Solar |
| Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 11.5 GWh | Sep 2021 | Dec 2025 | Other Biomass Gas |
| SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2020 | Dec 2025 | Solar |
| County of San Diego COC Hybrid | Solar Star California LXXVIII, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2020 | Dec 2025 | Solar |
| Berrenda Mesa Water District | The Greater Light USA LLC | Lost Hills, CA | California Independent System Operator (CISO) | 14.8 GWh | Jun 2023 | Nov 2025 | Solar |
| Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2014 | Dec 2025 | Solar |
| Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 333.9 GWh | Jul 2022 | Jun 2026 | Solar |
| Amazon PSP1 | Greenbacker Renewable Energy Corporation | Beaumont, CA | California Independent System Operator (CISO) | 7.5 GWh | Sep 2021 | Dec 2024 | Solar |
| Blythe Mesa Solar II | Intersect USA, LLC | Blythe, CA | California Independent System Operator (CISO) | 574.9 GWh | Nov 2022 | Jun 2026 | Solar |
| Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.8 GWh | Jul 2020 | Dec 2025 | Solar |
| CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.1 GWh | Jan 2020 | Dec 2025 | Solar |
| Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 243.4 GWh | Jul 2023 | Jun 2026 | Solar |
| Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 640.6 GWh | Feb 2022 | Jun 2026 | Solar |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 524.0 MWh | Feb 2022 | Dec 2025 | Solar |
| Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 12.0 GWh | Oct 2022 | Dec 2025 | Solar |
| EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 8.2 GWh | Jun 2021 | Dec 2025 | Solar |
| Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2021 | Dec 2024 | Solar |
| Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2018 | Dec 2025 | Solar |
| Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 293.4 GWh | Nov 2021 | Jun 2026 | Solar |
| Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 318.7 GWh | Jul 2022 | Jun 2026 | Solar |
| Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 58.8 GWh | Nov 2021 | Jun 2026 | Solar |
| University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2022 | Dec 2024 | Solar |
| Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2016 | Dec 2025 | Solar |
| Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2020 | Dec 2025 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 483.8 GWh | May 2024 | Jun 2026 | Solar |
| Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 140.2 GWh | Mar 2022 | Jun 2026 | Solar |
| Trona Solar III | Trona Solar III LLC | Trona, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2023 | Dec 2025 | Solar |
| Still Water Power | Still Water Power LLC | Hanford, CA | California Independent System Operator (CISO) | 1.5 GWh | Apr 2020 | Dec 2025 | Other Biomass Gas |
| Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 49.3 GWh | Mar 2021 | Dec 2025 | Wind |
| DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2021 | Dec 2024 | Solar |
| Chestnut | Chestnut Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 363.2 GWh | Nov 2023 | Jun 2026 | Solar |
| North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 7.4 GWh | Aug 2012 | Dec 2025 | Solar |
| Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 74.6 GWh | Jan 2021 | Jun 2026 | Solar |
| Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 63.9 GWh | Mar 2020 | Jun 2026 | Solar |
| Golden Field Solar III, LLC | Golden Fields Solar III, LLC | Rosamond, CA | California Independent System Operator (CISO) | 544.9 GWh | Nov 2020 | Jun 2026 | Solar : 99.5% |
| Wonderful Orchards - New Columbia | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.8 GWh | Aug 2020 | Dec 2025 | Solar |
| Silveira Ranch Road Solar | Silveira Ranch Road Solar | Novato, CA | California Independent System Operator (CISO) | 5.2 GWh | Feb 2021 | Dec 2025 | Solar |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2024 | Dec 2025 | Solar |
| Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2023 | Dec 2025 | Solar |
| Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 16.8 GWh | Oct 2023 | Dec 2024 | Other Biomass Gas |
| Fifth Standard Solar PV, LLC (Hybrid) | RWE Clean Energy | Huron, CA | California Independent System Operator (CISO) | 341.5 GWh | Aug 2023 | Jun 2026 | Solar |
| Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 27.5 GWh | Aug 2019 | Dec 2025 | Natural Gas |
| ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 8.4 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| Bellefield Solar and Energy Storage Farm | 50LW 8me LLC | Mojave, CA | California Independent System Operator (CISO) | 508.7 GWh | Nov 2025 | Jun 2026 | Solar |
| OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | - | Dec 2024 | Other Biomass Gas |
| Firebaugh-CCS-PV-1 | Mike Woolf Farming | Firebaugh, CA | California Independent System Operator (CISO) | 1.9 GWh | Feb 2015 | Dec 2025 | Solar |
| FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 747.6 MWh | May 2013 | Dec 2025 | Solar |
| Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.1 GWh | Jul 2020 | Dec 2025 | Solar |
| Solar Blue | Westlands Solar Blue | Lemoore, CA | California Independent System Operator (CISO) | 646.5 GWh | Nov 2023 | Jun 2026 | Solar |
| Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 20.6 GWh | Feb 2019 | Dec 2025 | Natural Gas |
| Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 13.2 GWh | Jul 2021 | Dec 2025 | Solar |
| Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 12.4 GWh | Nov 2020 | Dec 2025 | Solar |
| Summit Winds | Greenbacker Renewable Energy Corporation | Livermore, CA | California Independent System Operator (CISO) | 178.8 GWh | Jun 2021 | Jun 2026 | Wind |
| SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 9.4 GWh | May 2021 | Dec 2024 | Other Biomass Gas : 91.7% Natural Gas : 8.3% |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |