Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 713.0 GWh | Oct 2021 | May 2026 | Solar |
| TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 19.9 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 12.5 GWh | Apr 2018 | Dec 2025 | Natural Gas |
| Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Gilead Foster City Solar Project | Gilead Sciences Inc. Foster City | Foster City, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2021 | Dec 2024 | Solar |
| Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 952.0 MWh | Nov 2021 | Dec 2025 | Solar |
| Bodega Avenue Solar LLC | Bodega Avenue Solar LLC | Petaluma, CA | California Independent System Operator (CISO) | 3.8 GWh | Dec 2020 | Dec 2025 | Solar |
| Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2021 | Dec 2025 | Solar |
| CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 4.5 GWh | Jul 2023 | Dec 2024 | Solar |
| Danell Bros Inc | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2021 | Dec 2025 | Solar |
| CalTech - Pasadena Wilson Ave | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 18.7 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2016 | Dec 2025 | Natural Gas |
| Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 41.4 GWh | Aug 2021 | Dec 2025 | Solar |
| Wonderful Huller & Shelling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 3.7 GWh | Jul 2021 | Dec 2025 | Solar |
| CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2022 | Dec 2024 | Solar |
| Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2018 | Dec 2025 | Solar |
| Chambers 4 - Redland LGB4 | MN8 Energy LLC | Redlands, CA | California Independent System Operator (CISO) | 4.2 GWh | Feb 2019 | Dec 2025 | Solar |
| Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2019 | Dec 2024 | Solar |
| OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.3 GWh | Dec 2018 | Dec 2025 | Solar |
| Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 6.9 GWh | Aug 2021 | Dec 2025 | Natural Gas |
| Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 14.5 GWh | May 2021 | Dec 2025 | Natural Gas |
| AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2016 | Dec 2025 | Natural Gas |
| AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 8.5 GWh | Sep 2016 | Dec 2025 | Natural Gas |
| AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 7.8 GWh | May 2013 | Dec 2025 | Natural Gas |
| Amazon Bakersfield 1 Solar Project | Solar Star Prime 3, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 8.3 GWh | Dec 2023 | Dec 2025 | Solar |
| Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 329.8 GWh | Nov 2022 | May 2026 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 254.0 GWh | Nov 2024 | May 2026 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 445.3 GWh | Nov 2024 | May 2026 | Solar |
| Niagara Bottling - Rialto | SkyHigh 2 Solar | Rialto, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2021 | Dec 2025 | Solar |
| BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2021 | Dec 2025 | Solar |
| CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2023 | Dec 2024 | Solar |
| Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2022 | Dec 2025 | Solar |
| Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 2.5 GWh | Jun 2021 | Dec 2025 | Solar |
| Google Moffett Park Solar Project | Google, Inc. | Sunnyvale, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2021 | Dec 2025 | Solar |
| Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
| El Dorado Solar, LLC | Altus Power America Management, LLC | El Dorado Hills, CA | California Independent System Operator (CISO) | 3.3 GWh | Mar 2021 | Dec 2025 | Solar |
| CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 552.0 MWh | Feb 2022 | Dec 2024 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2024 | Solar |
| CA-DGS RFP-Salinas Valley State Prison | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 6.8 GWh | Oct 2023 | Dec 2024 | Solar |
| CA-DGS- RFP-Correctional Training Fac | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2024 | Dec 2024 | Solar |
| CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2023 | Dec 2024 | Solar |
| Abel Road Bioenergy | ACC Renewable Resources | Williams, CA | California Independent System Operator (CISO) | 22.7 GWh | Jun 2022 | Dec 2025 | Agricultural By-Products |
| Sierra Pacific Chinese Camp | Sierra Pacific Industries | Chinese Camp, CA | California Independent System Operator (CISO) | 4.5 GWh | Feb 2022 | Dec 2025 | Solar |
| Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 8.8 GWh | Aug 2022 | Dec 2025 | Solar |
| Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 7.3 GWh | Apr 2022 | Dec 2025 | Solar |
| Lerdo Detention Facility - Solar 2, 3 | County of Kern - (CA) | Bakersfield, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2021 | Dec 2025 | Solar |
| Catalina Express | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Berrenda Mesa Water District | The Greater Light USA LLC | Lost Hills, CA | California Independent System Operator (CISO) | 14.8 GWh | Jun 2023 | Nov 2025 | Solar |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 524.0 MWh | Feb 2022 | Dec 2025 | Solar |
| Blythe Mesa Solar II | Intersect USA, LLC | Blythe, CA | California Independent System Operator (CISO) | 578.3 GWh | Nov 2022 | May 2026 | Solar |
| Amazon PSP1 | Greenbacker Renewable Energy Corporation | Beaumont, CA | California Independent System Operator (CISO) | 7.5 GWh | Sep 2021 | Dec 2024 | Solar |
| BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 329.6 GWh | Jan 2022 | May 2026 | Solar |
| Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 97.6 GWh | Feb 2022 | May 2026 | Solar |
| Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 81.1 GWh | Feb 2022 | May 2026 | Solar |
| Trona Solar III | Trona Solar III LLC | Trona, CA | California Independent System Operator (CISO) | 5.4 GWh | Mar 2023 | Dec 2025 | Solar |
| Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 137.0 GWh | Mar 2022 | May 2026 | Solar |
| Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Marina South | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 482.6 GWh | May 2024 | May 2026 | Solar |
| Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 291.6 GWh | Nov 2021 | May 2026 | Solar |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 504.1 GWh | Nov 2023 | May 2026 | Solar |
| Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 317.5 GWh | Jul 2022 | May 2026 | Solar |
| Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 58.4 GWh | Nov 2021 | May 2026 | Solar |
| Chaparral Springs | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 410.3 GWh | Mar 2025 | May 2026 | Solar |
| Deer Creek 2 | Altus Power America Management, LLC | Shingle Springs, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 844.0 GWh | Jun 2023 | May 2026 | Solar |
| Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2016 | Dec 2025 | Solar |
| DirecTV - Los Angeles | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 7.9 GWh | Sep 2016 | Dec 2025 | Natural Gas |
| Keysight - Santa Rosa | Bloom Energy | Santa Rosa, CA | California Independent System Operator (CISO) | 34.5 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.5 GWh | Feb 2014 | Dec 2025 | Natural Gas |
| CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2016 | Dec 2025 | Natural Gas |
| University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 7.7 GWh | Nov 2016 | Dec 2025 | Natural Gas |
| West Village Solar - Array 2 Community S | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 619.0 MWh | Apr 2022 | Dec 2025 | Solar |
| West Village Solar - Array 1Community So | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 746.0 MWh | Apr 2022 | Dec 2025 | Solar |
| Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2018 | Dec 2025 | Solar |
| AT&T - Redwood City | Bloom Energy | Redwood City, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2013 | Dec 2025 | Natural Gas |
| Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 929.0 MWh | Sep 2009 | Dec 2025 | Solar |
| CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.7 GWh | Sep 2022 | Dec 2025 | Solar |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.1 GWh | Sep 2021 | Dec 2025 | Solar |
| Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2021 | Dec 2024 | Solar |
| University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2022 | Dec 2024 | Solar |
| Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2016 | Dec 2025 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2024 | Dec 2024 | Solar |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| IGS KSBD | Altus Power America Management, LLC | Highland, CA | California Independent System Operator (CISO) | 9.1 GWh | Feb 2022 | Dec 2025 | Solar |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 8.7 GWh | Sep 2016 | Dec 2025 | Solar |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 8.3 GWh | May 2016 | Dec 2025 | Solar |
| CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2025 | Solar |
| CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2014 | Dec 2025 | Solar |
| E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2013 | Dec 2025 | Solar |
| DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2014 | Dec 2025 | Solar |
| SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 52.7 GWh | May 2016 | Dec 2025 | Solar |
| Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 1.8 GWh | Dec 2013 | Dec 2025 | Solar |
| Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.2 GWh | Mar 2017 | Dec 2025 | Solar |
| Waterman Turnout Hydroelectric | San Bernardino Valley Mun. Water Dist. | San Bernardino, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2024 | Dec 2025 | Water |
| Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.7 GWh | Nov 2017 | Dec 2025 | Solar |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.9 GWh | Jul 2014 | Dec 2025 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |