Kroger La Habra
850 S Leslie St, La Habra, CA 90631Plant Summary Information
Kroger La Habra is ranked #766 out of 917 solar farms in California in terms of total annual net electricity generation.
Kroger La Habra generated 295.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Kroger La Habra |
|---|---|
| Utility Name | Ralph's Grocery Company |
| Location | Orange County, CA |
| Initial Operation Date | April 2020 |
| Last Update | Dec 2024 |
| Annual Generation | 1.7 GWh |
| Annual Consumption | 6.0 k MMBtu |
| Ranked #11,485 out of 13,301 Power Plants Nationwide | |
| Ranked #6,282 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,454 out of 1,641 California Power Plants | |
| Ranked #766 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Kroger La Habra
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kroger La Habra.
Monthly Net Generation for Kroger La Habra
Monthly Plant Fuel Consumption for Kroger La Habra
Kroger La Habra Details
| Summary Information | |
|---|---|
| Plant Name | Kroger La Habra (63758) |
| Plant Address | 850 S Leslie St, La Habra, CA 90631 |
| Utility | Ralph's Grocery Company (63452) |
| Latitude, Longitude | 33.92214, -117.9391 |
| Generation Dates on File | Apr 2020 to Dec 2024 |
| Initial Operation Date | April 2020 |
| Annual Generation | 1.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Food Manufacturing (311) |
| Sector | Industrial Non-CHP (6) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator KROLH Details Operating April 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2020 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 1.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.8 MW |
| Virtual Net Metering Agreement | No |
Kroger La Habra Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6272 | BWC Origination 19 | Hopedale, MA | 1.7 GWh |
| #6273 | WWRF Solar Plant | Rifle, CO | 1.7 GWh |
| #6274 | IKEA College Park 411 | College Park, MD | 1.7 GWh |
| #6275 | Russell | Russell, KS | 1.7 GWh |
| #6276 | Libra Community Solar | Glenwood, MN | 1.7 GWh |
| #6277 | Straight Garden Solar | Faribault, MN | 1.7 GWh |
| #6278 | MN CSG 2019-67 | Clear Lake, MN | 1.7 GWh |
| #6279 | Oaks HOA | Ione, CA | 1.7 GWh |
| #6280 | Las Positas College | Livermore, CA | 1.7 GWh |
| #6281 | Johnson CSG 1 | Lindstrom, MN | 1.7 GWh |
| #6283 | Brickchurch Solar | North Rose, NY | 1.7 GWh |
| #6284 | Anthony Wayne Solar #1 | Toledo, OH | 1.7 GWh |
| #6285 | Anne Arundel County Public Schools | Pasadena, MD | 1.7 GWh |
| #6286 | Douglas Todd Community Solar One LLC CSG | Osakis, MN | 1.7 GWh |
| #6287 | Preston Garden (CSG) | Franklin, MN | 1.7 GWh |
| #6288 | Nuby Run Solar, LLC | Windsor, VA | 1.7 GWh |
| #6289 | Johnson 1 Community Solar | Lindstrom, MN | 1.7 GWh |
| #6290 | Otis Elevator Company Solar | Florence, SC | 1.7 GWh |
| #6291 | USS Steamboat Solar LLC CSG | Morgan, MN | 1.7 GWh |
| #6292 | Nunnepog | Edgartown, MA | 1.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kroger La Habra.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alticor Inc - Solar Project | Buena Park, CA | 1.4 GWh | 4.4 mi |
| AT&T Anaheim | Anaheim, CA | 7.5 GWh | 6.1 mi |
| Biola University Hybrid | La Mirada, CA | 13.6 GWh | 4.4 mi |
| Blacksand Generating Facility | Brea, CA | 30.5 GWh | 4.9 mi |
| Brea Expansion Plant | Brea, CA | 244.0 GWh | 5.7 mi |
| Buidling L | Santa Fe Springs, CA | 1.4 GWh | 5.9 mi |
| Building F | Santa Fe Springs, CA | 1.4 GWh | 6.4 mi |
| Building G | Santa Fe Springs, CA | 2.0 GWh | 6.4 mi |
| Canyon Power Plant | Anaheim, CA | 77.1 GWh | 6.3 mi |
| CSUF Nutwood Solar | Fullerton, CA | 2.9 GWh | 4.1 mi |
| CSUF State College | Fullerton, CA | 1.5 GWh | 4.1 mi |
| CSUF Trigeneration | Fullerton, CA | 33.9 GWh | 4.2 mi |
| Freeway Springs | Santa Fe Springs, CA | 2.8 GWh | 6 mi |
| Golden Springs Building C-1 | Santa Fe Springs, CA | 1.4 GWh | 6.6 mi |
| Golden Springs Building D | Santa Fe Springs, CA | 1.6 GWh | 6.5 mi |
| Santa Fe Springs Rooftop Solar BLDG H | Santa Fe Springs, CA | 2.4 GWh | 6.1 mi |
| Santa Fe Springs Rooftop Solar BLDG M | Santa Fe Springs, CA | 2.6 GWh | 6.1 mi |
| Staples La Mirada, CA | La Mirada, CA | 1.5 GWh | 5.3 mi |
| Walnut Creek Energy Park | Industry, CA | 67.4 GWh | 6 mi |
| Yorba Linda | Yorba Linda, CA | 9.4 GWh | 6.9 mi |