Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2015 | Aug 2025 | Solar |
| AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Nov 2016 | Dec 2025 | Solar |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2016 | Dec 2025 | Solar |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 4.2 GWh | Aug 2017 | Dec 2025 | Wind |
| Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 326.0 GWh | Jun 2016 | Aug 2026 | Solar |
| Blythe Solar 110, LLC | Blythe Solar 110, LLC | Blythe, CA | California Independent System Operator (CISO) | 283.6 GWh | Feb 2016 | Dec 2025 | Solar |
| Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 342.0 GWh | Apr 2020 | Aug 2026 | Solar |
| Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 330.2 GWh | Oct 2020 | Aug 2026 | Solar |
| CED Ducor 4 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 51.8 GWh | Nov 2016 | Dec 2025 | Solar |
| Building F | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.4 GWh | Oct 2016 | Dec 2025 | Solar |
| Building G | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.0 GWh | Aug 2016 | Dec 2025 | Solar |
| Buidling L | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.4 GWh | Oct 2016 | Dec 2025 | Solar |
| Dulles | Golden Springs Development Company LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2016 | Dec 2025 | Solar |
| Freeway Springs | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2016 | Dec 2025 | Solar |
| Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 195.0 GWh | Nov 2016 | Aug 2026 | Solar |
| Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 114.3 GWh | Nov 2016 | Aug 2026 | Solar |
| Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 14.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Frontier Solar LLC | Boralex US Operations LLC | Newman, CA | California Independent System Operator (CISO) | 47.9 GWh | May 2016 | Dec 2025 | Solar |
| RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 189.7 GWh | Nov 2016 | Aug 2026 | Solar |
| Columbia Solar Energy, LLC | Columbia Solar Energy LLC | Pittsburg, CA | California Independent System Operator (CISO) | 11.9 GWh | Sep 2015 | Dec 2025 | Solar |
| Morelos del Sol | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 31.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Adera Solar | AES Distributed Energy | Chowchilla, CA | California Independent System Operator (CISO) | 32.7 GWh | Nov 2015 | Dec 2025 | Solar |
| SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 946.0 MWh | Jul 2016 | Dec 2025 | Solar |
| CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 258.0 GWh | Oct 2017 | Aug 2026 | Solar |
| CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 279.0 GWh | Jan 2019 | Aug 2026 | Solar |
| Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 10.8 GWh | Sep 2015 | Dec 2025 | Solar |
| Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 4.5 GWh | Jan 2016 | Dec 2025 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 61.5 GWh | Oct 2017 | Aug 2026 | Solar |
| Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 253.3 GWh | Nov 2015 | Dec 2025 | Wind |
| Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 3.5 GWh | Aug 2015 | Dec 2025 | Solar |
| CED Avenal | RWE Clean Energy | Avenal, CA | California Independent System Operator (CISO) | 16.0 GWh | Dec 2016 | Dec 2025 | Solar |
| CED Ducor 1 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 52.3 GWh | Nov 2016 | Dec 2025 | Solar |
| CED Ducor 2 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2025 | Solar |
| CED Ducor 3 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 38.4 GWh | Nov 2016 | Dec 2025 | Solar |
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 42.6 GWh | Nov 2020 | Aug 2026 | Solar |
| Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 105.6 GWh | Nov 2020 | Aug 2026 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 49.2 GWh | Aug 2023 | Dec 2025 | Solar |
| Aquamarine | Aqua | Lemoore, CA | California Independent System Operator (CISO) | 636.9 GWh | Aug 2021 | Aug 2026 | Solar |
| ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 7.7 GWh | Mar 2017 | Dec 2025 | Natural Gas |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.4 GWh | Jan 2017 | Dec 2025 | Natural Gas |
| Preferred Freezer San Leandro | Pacific Gas & Electric Co. | San Leandro, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2017 | Dec 2025 | Solar |
| PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2018 | Dec 2025 | Solar |
| Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 20.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.6 GWh | Jul 2022 | Dec 2025 | Wind |
| HL Solar (Lassen) | Madison Energy Investments LLC | Wendel, CA | California Independent System Operator (CISO) | 12.2 GWh | May 2019 | Dec 2025 | Solar |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.7 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.2 GWh | May 2021 | Dec 2025 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | May 2021 | Dec 2025 | Solar |
| American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.0 GWh | Aug 2019 | Dec 2025 | Solar |
| Malech Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.6 GWh | Sep 2017 | Dec 2025 | Solar |
| Hellyer Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 241.0 MWh | Jul 2017 | Dec 2025 | Solar |
| Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2025 | Solar |
| AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 1.3 TWh | Jan 2020 | Aug 2026 | Natural Gas |
| AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 1.7 TWh | Jan 2020 | Aug 2026 | Natural Gas |
| Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 6.9 GWh | Jan 2017 | Dec 2025 | Solar |
| Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 75.7 GWh | Oct 2017 | Dec 2025 | Natural Gas |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 228.7 GWh | Nov 2020 | Aug 2026 | Solar |
| Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 309.2 GWh | Nov 2020 | Aug 2026 | Solar |
| County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2025 | Solar |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2018 | Dec 2025 | Solar |
| Guadalupe Solar Farm | County of Santa Clara - (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2018 | Dec 2025 | Solar |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Mar 2025 | Solar |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 267.0 GWh | Oct 2019 | Aug 2026 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.6 GWh | Oct 2022 | Dec 2025 | Solar |
| Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 6.0 GWh | Jun 2019 | Dec 2025 | Other Biomass Gas |
| Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 2019 | Dec 2025 | Other Biomass Gas |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.4 GWh | Nov 2018 | Dec 2025 | Natural Gas |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 24.8 GWh | Jun 2018 | Dec 2025 | Natural Gas |
| Niagara Bottling Stockton | ClearGen LLC | Stockton, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2017 | Dec 2025 | Solar |
| Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara - (CA) | Goleta, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2021 | Dec 2025 | Other Biomass Gas |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 304.4 GWh | Oct 2022 | Aug 2026 | Solar |
| Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2025 | Solar |
| Corcoran Irrigation District | Madison Energy Investments LLC | Corcoran, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2019 | Sep 2025 | Solar |
| Athos Solar Project | SE Athos I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 670.5 GWh | May 2022 | Aug 2026 | Solar |
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2017 | Dec 2025 | Solar |
| Medline Ind. Phase 2 Tracy | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Aug 2025 | Solar |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2018 | Nov 2025 | Solar |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | SCV Water | Santa Clara, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2014 | Oct 2025 | Solar |
| IOS II-LAX9 | Madison Energy Holdings LLC | Fontana, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2025 | Solar |
| Sierra Pacific Industries (2042-RD) | Sierra Pacific Industries | Red Bluff, CA | California Independent System Operator (CISO) | 16.7 GWh | Apr 2020 | Dec 2025 | Solar |
| DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 4.8 GWh | Jun 2020 | Dec 2025 | Solar |
| DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2020 | Dec 2025 | Solar |
| Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2025 | Solar |
| Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2020 | Dec 2025 | Solar |
| Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 36.3 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 17.8 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 10.9 GWh | Mar 2017 | Dec 2025 | Natural Gas |
| Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 39.0 GWh | May 2017 | Dec 2025 | Natural Gas |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.8 GWh | Nov 2017 | Dec 2025 | Natural Gas |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.7 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 15.5 GWh | Aug 2017 | Dec 2025 | Natural Gas |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 185.9 GWh | Nov 2023 | Aug 2026 | Wind |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2025 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.4 GWh | Jan 2020 | Dec 2025 | Solar |
| Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2020 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 28.8 GWh |
| Tehama County, CA | # 51 | 7 | 45.8 GWh |
| Napa County, CA | # 50 | 11 | 51.2 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.7 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 80.3 GWh |
| San Mateo County, CA | # 46 | 11 | 133.1 GWh |
| Yolo County, CA | # 45 | 15 | 196.6 GWh |
| Nevada County, CA | # 44 | 12 | 225.7 GWh |
| San Benito County, CA | # 43 | 6 | 266.2 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 292.9 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 450.0 GWh |
| Trinity County, CA | # 38 | 5 | 480.6 GWh |
| Merced County, CA | # 37 | 33 | 493.1 GWh |
| Calaveras County, CA | # 36 | 6 | 524.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 608.6 GWh |
| Ventura County, CA | # 33 | 33 | 719.4 GWh |
| Lake County, CA | # 32 | 10 | 892.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 53 | 1.6 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.8 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Orange County, CA | # 21 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.7 TWh |
| Alameda County, CA | # 19 | 52 | 2.8 TWh |
| Tuolumne County, CA | # 18 | 23 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.0 TWh |
| Solano County, CA | # 16 | 41 | 3.0 TWh |
| Santa Clara County, CA | # 15 | 76 | 3.4 TWh |
| Butte County, CA | # 14 | 25 | 3.5 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.0 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.0 TWh |
| Fresno County, CA | # 8 | 128 | 7.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.8 TWh |
| Contra Costa County, CA | # 5 | 59 | 11.8 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Los Angeles County, CA | # 3 | 325 | 17.3 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 333 | 35.3 TWh |