Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.7 GWh | Nov 2017 | Dec 2024 | Solar |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.9 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 451.8 GWh | Nov 2018 | Mar 2026 | Wind |
| Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 123.1 GWh | Nov 2018 | Mar 2026 | Wind |
| Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 80.9 GWh | Nov 2018 | Dec 2024 | Wind |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.0 GWh | Apr 2023 | Dec 2024 | Solar |
| CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2024 | Solar |
| CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2013 | Dec 2024 | Solar |
| CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2017 | Dec 2024 | Solar |
| Wistaria Ranch Solar | Consolidated Edison Development Inc. | Calexico, CA | California Independent System Operator (CISO) | 286.6 GWh | Nov 2018 | Mar 2026 | Solar |
| Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2018 | Dec 2024 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2016 | Dec 2024 | Solar |
| SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 53.5 GWh | May 2016 | Dec 2024 | Solar |
| Green Beanworks C PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 5.1 GWh | Jul 2018 | Dec 2024 | Solar |
| Green Beanworks D PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 4.1 GWh | Jul 2018 | Dec 2024 | Solar |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 134.1 GWh | Oct 2017 | Mar 2026 | Wind |
| USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.1 GWh | Jun 2017 | Dec 2024 | Solar |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 250.5 GWh | Nov 2018 | Mar 2026 | Solar |
| Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 57.7 GWh | Aug 2019 | Dec 2024 | Solar |
| Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.1 GWh | Nov 2018 | Dec 2024 | Solar |
| Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 399.3 GWh | Dec 2019 | Mar 2026 | Solar |
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 6.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2024 | Wind |
| Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2018 | Dec 2024 | Wind |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 52.6 GWh | Feb 2018 | Dec 2024 | Solar |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 112.8 GWh | Apr 2023 | Mar 2026 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.6 GWh | Jun 2018 | Dec 2024 | Natural Gas |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2024 | Solar |
| Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 282.7 GWh | Oct 2019 | Mar 2026 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
| Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 8.0 GWh | Nov 2018 | Dec 2024 | Natural Gas |
| County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 36.8 GWh | Nov 2020 | Mar 2026 | Solar |
| Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 109.1 GWh | Nov 2020 | Mar 2026 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 663.5 GWh | Aug 2021 | Mar 2026 | Solar |
| ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 8.0 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Jan 2017 | Dec 2024 | Natural Gas |
| PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2024 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
| National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2015 | Dec 2024 | Solar |
| Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2018 | Dec 2024 | Solar |
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2018 | Dec 2024 | Solar |
| San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 239.5 GWh | Jul 2019 | Mar 2026 | Solar |
| Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 398.9 GWh | Oct 2020 | Mar 2026 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Feb 2017 | Dec 2024 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 670.4 GWh | Oct 2018 | Mar 2026 | Solar |
| Strauss Wind Farm | Strauss Wind LLC | Lompoc, CA | California Independent System Operator (CISO) | 205.5 GWh | Nov 2023 | Mar 2026 | Wind |
| AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 1.2 TWh | Jan 2020 | Mar 2026 | Natural Gas |
| AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 1.8 TWh | Jan 2020 | Mar 2026 | Natural Gas |
| Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 6.6 GWh | Jan 2017 | Dec 2024 | Solar |
| Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 75.4 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 234.7 GWh | Nov 2020 | Mar 2026 | Solar |
| Maverick Solar, LLC | Maverick Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 369.3 GWh | Nov 2020 | Mar 2026 | Solar |
| RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.3 GWh | Dec 2013 | Dec 2024 | Solar |
| Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Dec 2024 | Solar |
| Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Dec 2013 | Dec 2024 | Solar |
| Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2013 | Dec 2024 | Solar |
| Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2013 | Dec 2024 | Solar |
| Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 4.0 GWh | Jul 2013 | Dec 2024 | Solar |
| McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 646.7 GWh | Jul 2015 | Dec 2024 | Solar |
| Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 294.7 GWh | Sep 2013 | Dec 2024 | Solar |
| RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 52.3 GWh | Dec 2013 | Dec 2024 | Solar |
| Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2013 | Dec 2024 | Solar |
| RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2013 | Dec 2024 | Solar |
| RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 23.9 GWh | Dec 2013 | Dec 2024 | Solar |
| Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.1 GWh | May 2012 | Dec 2024 | Solar |
| Bear Creek Solar (CA) | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 4.0 GWh | Jan 2014 | Dec 2024 | Solar |
| Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.2 GWh | Mar 2014 | Dec 2024 | Solar |
| Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2024 | Solar |
| Ironwood Solar LLC | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.5 GWh | Mar 2012 | Dec 2024 | Solar |
| Desert Hot Springs Solar | Consolidated Edison Solutions Inc. | Desert Hot Springs, CA | California Independent System Operator (CISO) | 4.8 GWh | Nov 2013 | Nov 2024 | Solar |
| Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2015 | Dec 2024 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 893.5 GWh | Feb 2014 | Mar 2026 | Solar |
| Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 723.9 GWh | Feb 2014 | Mar 2026 | Solar |
| Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 379.0 GWh | Dec 2013 | Dec 2024 | Wind |
| Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 269.5 GWh | Dec 2013 | Dec 2024 | Wind |
| Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
| Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 23.6 GWh | Nov 2014 | Dec 2024 | Solar |
| Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2024 | Solar |
| Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 72.0 MWh | Sep 2011 | Dec 2024 | Solar |
| Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 129.9 GWh | Jul 2014 | Mar 2026 | Landfill Gas |
| Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 352.7 GWh | Jun 2013 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on March 2026 generation numbers.| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Sierra County, CA | # 55 | 3 | 11.9 GWh |
| Mendocino County, CA | # 54 | 5 | 12.3 GWh |
| Glenn County, CA | # 53 | 2 | 18.7 GWh |
| Marin County, CA | # 52 | 3 | 19.0 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 82.1 GWh |
| Siskiyou County, CA | # 47 | 8 | 89.8 GWh |
| San Mateo County, CA | # 46 | 11 | 134.3 GWh |
| Yolo County, CA | # 45 | 15 | 210.6 GWh |
| Nevada County, CA | # 44 | 12 | 219.1 GWh |
| San Benito County, CA | # 43 | 6 | 271.3 GWh |
| Mariposa County, CA | # 42 | 2 | 299.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 316.4 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 450.9 GWh |
| Trinity County, CA | # 38 | 5 | 514.3 GWh |
| Merced County, CA | # 37 | 31 | 549.1 GWh |
| Calaveras County, CA | # 36 | 6 | 555.5 GWh |
| Amador County, CA | # 35 | 8 | 621.1 GWh |
| Ventura County, CA | # 34 | 32 | 743.6 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 908.4 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Tulare County, CA | # 28 | 69 | 1.6 TWh |
| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 47 | 1.6 TWh |
| El Dorado County, CA | # 26 | 15 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Plumas County, CA | # 23 | 13 | 2.0 TWh |
| Colusa County, CA | # 22 | 3 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.4 TWh |
| Orange County, CA | # 20 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 19 | 25 | 2.7 TWh |
| Alameda County, CA | # 18 | 47 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 3.0 TWh |
| Solano County, CA | # 16 | 40 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 75 | 3.5 TWh |
| Kings County, CA | # 13 | 57 | 4.2 TWh |
| San Diego County, CA | # 12 | 151 | 4.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.1 TWh |
| Sacramento County, CA | # 10 | 65 | 5.7 TWh |
| Shasta County, CA | # 9 | 46 | 7.3 TWh |
| Fresno County, CA | # 8 | 119 | 7.6 TWh |
| Imperial County, CA | # 7 | 84 | 9.5 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.0 TWh |
| Riverside County, CA | # 4 | 159 | 14.8 TWh |
| Los Angeles County, CA | # 3 | 308 | 17.0 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 19.7 TWh |
| Kern County, CA | # 1 | 313 | 35.2 TWh |